This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: May 25, 2015
The proposal is to recommence quarrying at Pivot Hill (M80/618(P) & L80/63(P)). It involves the extraction of up to 45,000 tonnes per year of basalt for use as aggregates in civil works. This would require 4.4 hectares (ha) of clearing of native vegetation in addition to the existing 2.45 hectares of previously disturbed land, within a Mining Lease covering 45 ha. Crushing and screening of aggregates would be undertaken at the site. The proponent has proposed a duration of 10 years... Read more...Last updated: March 23, 2015
B & J Catalano propose to develop a granite quarry on Lot 501 Coalfields Road, Wellington, in the Shire of Harvey. The area of disturbance is up to 10 hectares. It is proposed to extract 50,000 to 100,000 tonnes of hard rock per year. The expected life of the operations is 20 years. Rock will be extracted by drill and blast and removal by excavator before being trucked off site. It is anticipated that blasting will occur four times per year. The site is largely cleared. The nearest... Read more...