Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Infrastructure (8) Apply Infrastructure filter
  • Iron Ore (6) Apply Iron Ore filter
  • Gold (1) Apply Gold filter
  • Industrial (1) Apply Industrial filter
  • Oil and gas (1) Apply Oil and gas filter
  • Sand, rock, gravel and clay (1) Apply Sand, rock, gravel and clay filter

Filter by current status:

  • (-) Remove Ministerial Statement published filter Ministerial Statement published

Filter by relevant environmental factors:

  • Flora and Vegetation (10) Apply Flora and Vegetation filter
  • Terrestrial Fauna (7) Apply Terrestrial Fauna filter
  • 37 (5) Apply 37 filter
  • Social Surroundings (5) Apply Social Surroundings filter
  • Hydrological Processes (4) Apply Hydrological Processes filter
  • Inland Waters Environmental Quality (4) Apply Inland Waters Environmental Quality filter
  • Marine Fauna (2) Apply Marine Fauna filter
  • Subterranean Fauna (2) Apply Subterranean Fauna filter
  • Benthic Communities and Habitats (1) Apply Benthic Communities and Habitats filter
  • Marine Environmental Quality (1) Apply Marine Environmental Quality filter
  • People (1) Apply People filter
  • Terrestrial Environmental Quality (1) Apply Terrestrial Environmental Quality filter

Filter by Proponent:

  • Atlas Iron Limited (1) Apply Atlas Iron Limited filter
  • BHP Billiton Iron Ore (1) Apply BHP Billiton Iron Ore filter
  • BHP Billiton Petroleum Pty Ltd (1) Apply BHP Billiton Petroleum Pty Ltd filter
  • BHP Iron Ore Pty Ltd. (1) Apply BHP Iron Ore Pty Ltd. filter
  • Fortescue Metals Group Limited (1) Apply Fortescue Metals Group Limited filter
  • Greatland Pty Ltd (1) Apply Greatland Pty Ltd filter
  • Hamersley Iron Pty Ltd (1) Apply Hamersley Iron Pty Ltd filter
  • Hope Downs Management Services Pty Ltd (1) Apply Hope Downs Management Services Pty Ltd filter
  • Pilbara Iron Pty Ltd (1) Apply Pilbara Iron Pty Ltd filter
  • Rio Tinto Iron Ore (1) Apply Rio Tinto Iron Ore filter
  • Robe River Iron Associates (1) Apply Robe River Iron Associates filter
  • Robe River Mining Co Pty Ltd (1) Apply Robe River Mining Co Pty Ltd filter
  • Roy Hill Iron Ore Pty Ltd (1) Apply Roy Hill Iron Ore Pty Ltd filter

Filter by region:

  • (-) Remove Pilbara filter Pilbara

Filter by last updated:

  • (-) Remove 2012 filter 2012
  1. Home
  2. Proposal search
  3. 2012
  4. Pilbara
  5. Ministerial Statement published

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Borrow Pits in Millstream Chichester National Park

Last updated: December 20, 2012

The proposal is for seven borrow pits in the Millstream Chichester National Park (MCNP) where up to 118 hectares (ha) will be disturbed, of which 90 ha is within the national park and the remainder in the excised rail corridor. All borrow pits within the MCNP are within existing Rio Tinto Iron Ore licence areas granted under the, Mining Act 1978, (Robe River Mining Company is a subsidiary of Rio Tinto) and all borrow material will only be used for projects or portions of projects that are... Read more...

Newman Satellite Development - Orebody 23

Last updated: December 4, 2012

The proposal is for mining of iron ore below the watertable from the Orebody 23 deposit on the Ophthalmia Range, including de-watering operations, approximately 13 kilometres north-east of Newman, Shire of East Pilbara. Read more...

Pardoo Direct Shipping Ore Project Port Hedland

Last updated: July 24, 2012

The proposal is to develop and operate a direct shipping iron ore project in the Pilbara. The project involves the open-cut mining of eight small pits approximately 70 kilometres east of Port Hedland to obtain direct shipping ore quality haematite. Annual ore production will be 1.5 million tonnes. Read more...

Roy Hill 1 Iron Ore Mining Project Stage 1 (s46) [1923]

Last updated: July 6, 2012

The proposal is to mine iron ore from the Stage 1 project area on the southern slopes of the Chichester Range and develop associated mining infrastructure. Inquiry under s46 into request to change condition 9 of Ministerial Statement 824 - Short-Range Endemic Invertebrates. Read more...

Cape Lambert to Emu Siding Rail Duplication

Last updated: June 19, 2012

The proposal is to construct and operate approximately 70 km of duplicate rail line and supporting infrastructure from the Cape Lambert Port facilities to Emu Siding. Read more...

Telfer Project, Power Supply and Infrastructure Corridor, Port Hedland to Telfer Gold Mine, Great Sandy Desert

Last updated: May 2, 2012

The proposal is to supply power to an expanded mining operation at the Telfer Gold Mine. The proposed expansion of the Telfer Gold Mine associated with this proposal is being dealt with separately. That mine expansion is set out in a separate referral to the EPA (Newcrest Mining Limited 2002b). The mine expansion and power supply proposals have been separated because it is likely that the mine and power supply will eventually be operated by different proponents. Nevertheless, the proposals have... Read more...

Hope Downs Iron Ore Mine (s. 46)

Last updated: April 12, 2012

The assessment is an inquiry into conditions of Ministerial Statement 584 , and relates to discharge of water to Weeli Wolli Springs. The original proposal is for the establishment of an iron ore mine in the Hope Downs area, 75km north-west of Newman, including facilities for limited processing of the ore, and a rail connection from the mine to a rail network for the transport of iron ore product to the coast. Read more...

Cape Lambert Port upgrade - increase in throughput to 85 Mtpa

Last updated: April 4, 2012

The proposal is to increase the throughput of iron ore to 85 million tonnes per annum at the Cape Lambert Port operations. Read more...

Pilbara Iron Ore and Infrastructure Project: East-West Railway and Mine Sites (Stage B)

Last updated: March 28, 2012

The original proposal, as set out in the proponent’s PER, comprised four iron ore mines in the Pilbara region, an ore beneficiation plant, a borefield, an accommodation village and 160km of east-west railway connecting to the north-south link to Port Hedland. Since release of the PER, FMG has made several major modifications to the proposal: the proposed mines at Mt Lewin and Mt Nicholas have been excised; the connecting infrastructure to those minesites is not now needed, leading to a change... Read more...

Cape Lambert Port B development

Last updated: March 28, 2012

The proposal is to construct and operate a second port (Port B) at Cape Lambert to process and export up to 130 million tonnes of ore per annum. Read more...

Proposed Brockman No. 2 detrital iron ore mine

Last updated: March 28, 2012

The proposal is to mine high-grade detrital iron ore from Hamersley Iron's leases on Mt Brockman station. The deposits lie at the foot of the Brockman massif some 3km from Mt Brockman and 55 km north-west of Tom Price. Ore will be extracted from one pit 1500 metres long by 500 metres wide and up to three smaller pits of about 500 metres by 200 metres. Open cut mining methods would be used, involving the stockpiling of topsoil and about 5 million tonnes of waste overburden per year, then... Read more...

Port Hedland Outer Harbour Development

Last updated: February 28, 2012

The proposal is to construct and operate the Outer Harbour Development which includes landside and marine infrastructure for the handling and export of iron ore from BHPBIO’s operations. The Boodarie stockyard infrastructure will supply an overland conveyor to a transfer pad located to the west of the existing Finucane Island facilities. A piled jetty will transfer ore material to the ship loaders located at the piled wharf. Read more...

Macedon Gas Development

Last updated: January 17, 2012

The proposal is to construct a sub sea pipeline, onshore gas treatment and compression plant, and sales gas pipeline. The subsea pipeline from the Macedon Gas Field (100 kilometres west of Onslow) connects to the onshore gas treatment and compression plant at Ashburton North (15 kilometres southwest of Onslow). The sales gas pipeline connects the onshore facility to the Dampier to Bunbury Natural Gas (DBNG) Pipeline. Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.