This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: August 4, 2025
Time limit for substantial commencement and review of the adequacy of existing implementation conditions to ensure consistency with the EPA’s current objectives for the relevant environmental factors. Read more...Last updated: June 23, 2025
Tronox Management Pty Ltd are proposing to expand the existing Cooljarloo Mineral Sands Project by mining a satellite pit named Osprey. The project is located approximately 20 kilometres northwest of Cataby. The Osprey Expansion has a disturbance footprint of 61 hectares (ha) of which 59.14 ha is native vegetation. Dredge mining will be used to avoid pit dewatering. Water for mining and concentrating will be sourced from existing licenced bores. The final mine void will be backfilled above the... Read more...Last updated: May 24, 2024
The proposal includes the expansion of a mineral sands mine including mine pits with dewatering to facilitate dry mining techniques. Existing processing facilities, services and support infrastructure will be utilised. Mine voids will be progressively backfilled with sand and clay tailings and rehabilitated to pre-disturbance landuse (i.e. pasture). Read more...Last updated: July 11, 2022
Australian Garnet Pty Ltd is seeking to develop a greenfields mineral sands mine located 35 kilometres south of Kalbarri, in the Mid-West region of Western Australia, within the Shire of Northampton. The proposal would include the progressive development of above-groundwater mine pits, and associated processing facilities and infrastructure. The proposal would require the clearing of up 161 hectares of native vegetation and mined sections would be progressively backfilled and rehabilitated. The... Read more...Last updated: August 21, 2017
The proponent, Mr Graeme Robertson, proposes to extract and process lime on Lot 9005 Rock Cliff Circle, Nullaki Peninsula, Albany. The proposal is located 10 kilometres south east from the Denmark townsite. The Bibbulmun Track is located east of the proposal site in Reserve 17464, approximately 500 metres (m) from the proposed extraction area. The proposal would include staged development of a 7.5 hectare (ha) lime pit and 2ha stockpiling area, with excavations up to 8m in depth. The... Read more...Last updated: December 8, 2016
Cristal Australia Pty Ltd proposes the Wonnerup North Mineral Sands Project located approximately 10 kilometres east of Busselton, City of Busselton. The project would involve dry mining and processing of mineral sands ore from the Wonnerup North deposit at a rate of approximately 2.3 million tonnes (Mt) per annum over eight years. Read more...Last updated: February 15, 2016
Holcim (Australia) Pty Ltd proposes to develop a sand quarry on tenements M70/1248 and M70/1250, located in Jandabup north of Perth, approximately 8 km north east of Wanneroo and within the Local Government Area of Wanneroo. The site falls within the Gnangara Pine Plantation, which has been progressively harvested since 2003 until the current time. The site is in a cleared state from a recent harvest of pine. The project site is on the Gnangara Mound within the Gnangara Underground Water... Read more...