This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: September 24, 2025
Proposal by Woodside Energy Ltd to develop infrastructure to transport, inject and permanently sequester up to 14,200 tonnes of carbon dioxide (CO 2 ) per day into the Calliance Storage Formation at an expected annual average injection rate of 3-4 million tonnes per annum. Calliance is an underground, rock formation located offshore, 4 km below the seabed and about 425 km north of Broome. The CO 2 would originate from the proposed Browse to North West Shelf Project which proposes to produce... Read more...Last updated: September 16, 2025
Changes to condition 9 in order to remove prescriptive rehabilitation criteria related to the rehabilitation of the proposal. Condition 9 of Ministerial Statement 708 is deleted and replaced with Ministerial Statement 1256. Read more...Last updated: September 3, 2025
Inquire into implementation Condition 9 (Quarantine Expert Panel) and Condition 15 (Marine Turtle Expert Panel) to ensure that they are effective and act as an independent advisory group for the Minister for Environment and the proponent on matters relating to terrestrial and marine quarantine and marine turtle monitoring and management. It is noted that a second Section 46 inquiry into Ministerial 800 (dated 11-04-2023) has also been requested by the Minister for Environment in relation to... Read more...Last updated: August 21, 2025
Woodside Energy Ltd has submitted an application under s.43A of the Environmental Protection Act 1986 to change the Proposed Browse to NWS Development proposal during the EPA’s assessment. The proposed amendment includes a reduction in development envelope size to no longer overlap the Scott Reef shallow water benthic habitats or Sandy Islet, modifications to remove or relocate drilling units to avoid green turtle habitats, and the adoption of technology to minimise the risk of a loss-of-well... Read more...Last updated: August 20, 2025
Woodside Energy Ltd has provided a combined document that relates to both its Commonwealth referral (Environment Protection and Biodiversity Act 1999) and State referral (Environmental Protection Act 1986). The component within State Waters includes drilling and completion, installation, commissioning, operation, well repair and workover and decommissioning of subsea wells and associated infrastructure located in Western Australian State waters, to extract hydrocarbons from the Torosa reservoir... Read more...Last updated: July 4, 2025
Conditions 6-12, 9-1 to 9-5 inclusive, and 12-1 to 12-8 inclusive of Ministerial Statement 873 are to be removed from the statement and conditions 9-1 to 9-5 inclusive and conditions 12-1 to 12-8 inclusive are to be transferred into a new ministerial statement. The change will facilitate the transfer of conditions relevant to the operation of port facilities from Chevron Australia Pty Ltd to the Pilbara Ports Authority via this new Ministerial Statement. Read more...Last updated: June 9, 2025
Southern Cross Energy (TransAlta) proposes to construct and operate up to 150 megawatt of gas reciprocating engines and associated infrastructure in the Northern Goldfields region of Western Australia (the proposal), approximately 90 kilometres (km) north of Leinster and 80 km south of Wiluna. The proposal will be a component of TransAlta’s existing Southern Cross Energy North (SCEN) network supplying power to BHP Nickel West and potential third-party operators. The proposal will be constructed... Read more...Last updated: January 21, 2025
The Waitsia Gas Project Stage 2 is a conventional gas proposal located approximately 16km East-South-East of the Dongara-Port Denison town sites. The proposal includes clearing of up to 17 ha of native vegetation to support the following: Construction and operation of a new gas processing plant with a maximum export capacity of 250 terajoules per day; Drilling of up to 6 new production wells to supplement the existing 2 wells; and Installation of a gas gathering system comprising of flowlines... Read more...