Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • (-) Remove Industrial filter Industrial
  • Infrastructure (3) Apply Infrastructure filter
  • Iron Ore (1) Apply Iron Ore filter

Filter by current status:

  • Ministerial Statement published (17) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (4) Apply Decision on whether to assess has been published filter

Filter by relevant environmental factors:

  • (-) Remove Marine Environmental Quality filter Marine Environmental Quality
  • Social Surroundings (12) Apply Social Surroundings filter
  • 37 (9) Apply 37 filter
  • Flora and Vegetation (8) Apply Flora and Vegetation filter
  • Benthic Communities and Habitats (6) Apply Benthic Communities and Habitats filter
  • Marine Fauna (6) Apply Marine Fauna filter
  • Terrestrial Fauna (6) Apply Terrestrial Fauna filter
  • Inland Waters Environmental Quality (5) Apply Inland Waters Environmental Quality filter
  • Terrestrial Environmental Quality (5) Apply Terrestrial Environmental Quality filter
  • Coastal Processes (4) Apply Coastal Processes filter
  • Hydrological Processes (4) Apply Hydrological Processes filter
  • People (3) Apply People filter
  • Human Health (2) Apply Human Health filter
  • Inland Waters (2) Apply Inland Waters filter

Filter by Proponent:

  • CSBP Limited (2) Apply CSBP Limited filter
  • NW Interconnected Power Pty Ltd (2) Apply NW Interconnected Power Pty Ltd filter
  • Australian Gold Reagents Pty Ltd (1) Apply Australian Gold Reagents Pty Ltd filter
  • BHP Billiton Iron Ore Pty Ltd (1) Apply BHP Billiton Iron Ore Pty Ltd filter
  • Co-operative Bulk Handling Limited (CBH Ltd) (1) Apply Co-operative Bulk Handling Limited (CBH Ltd) filter
  • Cristal Pigment Australia Ltd (1) Apply Cristal Pigment Australia Ltd filter
  • Dampier Nitrogen Pty Ltd (1) Apply Dampier Nitrogen Pty Ltd filter
  • Department of Commerce and Trade (1) Apply Department of Commerce and Trade filter
  • Department of Defence (1) Apply Department of Defence filter
  • Grange Resources Ltd (1) Apply Grange Resources Ltd filter
  • HIsmelt (Operations) Pty. Limited (1) Apply HIsmelt (Operations) Pty. Limited filter
  • Perdaman Chemicals and Fertilisers Pty Ltd (1) Apply Perdaman Chemicals and Fertilisers Pty Ltd filter
  • Syntroleum Sweetwater (1) Apply Syntroleum Sweetwater filter
  • Tiwest Joint Venture (1) Apply Tiwest Joint Venture filter
  • Tiwest Joint Venture Pty Ltd (1) Apply Tiwest Joint Venture Pty Ltd filter
  • Water Corporation (1) Apply Water Corporation filter
  • Wesfarmers Chemicals Energy & Fertilisers Limited (1) Apply Wesfarmers Chemicals Energy & Fertilisers Limited filter
  • Whitecrest Enterprises Pty Ltd (1) Apply Whitecrest Enterprises Pty Ltd filter
  • Worsley Alumina Pty Ltd (1) Apply Worsley Alumina Pty Ltd filter

Filter by region:

  • Perth (9) Apply Perth filter
  • Pilbara (7) Apply Pilbara filter
  • South West (3) Apply South West filter
  • Gascoyne (1) Apply Gascoyne filter
  • Great Southern (1) Apply Great Southern filter

Filter by last updated:

  • 2025 (1) Apply 2025 filter
  • 2024 (2) Apply 2024 filter
  • 2022 (1) Apply 2022 filter
  • 2021 (3) Apply 2021 filter
  • 2020 (3) Apply 2020 filter
  • 2018 (1) Apply 2018 filter
  • 2016 (1) Apply 2016 filter
  • 2010 (1) Apply 2010 filter
  • 2005 (2) Apply 2005 filter
  • 2002 (1) Apply 2002 filter
  • 2000 (1) Apply 2000 filter
  • 1997 (2) Apply 1997 filter
  • 1996 (1) Apply 1996 filter
  • 1995 (1) Apply 1995 filter
  1. Home
  2. Proposal search
  3. Industrial
  4. Marine Environmental Quality

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Perdaman Urea Project

Last updated: January 21, 2025

Perdaman Chemicals and Fertilisers Pty Ltd intends to construct and operate a urea plant with a production capacity of approximately 2 million tonnes per annum (Mtpa) on Sites C and F within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula. Both sites are located adjacent to the Murujuga National Park. The EPA considered the Study of the Cumulative Impacts of Air Emissions in the Murujuga Airshed in its assessment of the Perdaman Urea Project. Read more...

Cape Riche Seawater Desalination Plant (S46) [2383]

Last updated: July 4, 2024

Time limit for substantial commencement, review of the adequacy of existing implementation conditions to ensure consistency with the EPA’s current objectives for each environmental factor. Read more...

Asian Renewable Energy Hub

Last updated: April 11, 2024

NW Interconnected Power Pty Ltd is seeking to develop the Asian Renewable Energy Hub. The proposal is to construct and operate a large-scale wind and solar hybrid renewable energy project, approximately 220 km east of Port Hedland, WA. The renewable energy will be exported via a subsea power cable to Indonesia and Singapore. Onshore components comprise a series of linear arrays of wind turbines (up to 1,743 turbines) and solar panels distributed across a 644,600 ha development envelope, with a... Read more...

Dredging at Finucane Island, BHP Billiton RGP5 Project, Port Hedland

Last updated: January 25, 2022

Dredging of approximately 3,900,000 cubic metres of material for two new berth pockets and extensions to the existing departure channel and swing basin at Harriet Point and Stanley Point; disposal of dredged material at dredged material management areas. Read more...

Chloride Process Pigment Plant Kemerton and Operations at Australind (S46) [2025]

Last updated: December 6, 2021

Read more...

CBH Kwinana Fertiliser Project

Last updated: July 15, 2021

Co-operative Bulk Handling Ltd (CBH) propose to develop a facility for the import and storage of dry (granular) and liquid urea ammonium nitrate (UAN) fertiliser products. The proposal consists of onshore and offshore components and is located adjacent and within the existing Rockingham Industrial Zone (RIZ). The offshore component will extend into the southern Cockburn Sound. The proposal involves the construction of a dedicated liquid (UAN) pipeline that will follow the alignment of the... Read more...

Industrial Infrastructure and Harbour Development, Jervoise Bay

Last updated: May 25, 2021

The proposal is to construct industrial infrastructure and a Southern Harbour in Jervoise Bay south of the Northern Harbour precinct and including the Marine support facility. Read more...

Asian Renewable Energy Hub Revised Proposal

Last updated: November 9, 2020

NW Interconnected Power Pty Ltd (the Proponent) is seeking to revise its approved proposal to develop the Asian Renewable Energy Hub.  The proposal was previously referred under section 38 of the Environmental Protection Act 1986 (EP Act), assessed by the Environmental Protection Authority (EPA) at the level of Public Environmental Review (PER) (NW Interconnected Power 2019), and subsequently approved by the Western Australian Minister for Environment in October 2020.   This referral is for ... Read more...

Debottlenecking of Ammonia Plant from 650 tpd to 745 tpd, Kwinana Industrial Area (s46)

Last updated: June 24, 2020

Inquiry under Section 46(3) of the, Environmental Protection Act 1986, (EP Act) on CSBP Limited’s (CSBP) proposal to debottleneck their Ammonia Plant from 650 to 745 tonnes per day (tpd). Read more...

Sodium Cyanide Plants (Liquid and Solid) at Kwinana and Transport of Sodium Cyanide by Road and Rail from Kwinana (S46) [2247]

Last updated: May 18, 2020

Changes to condition 2 (Proponent Commitments), condition 4 (Compliance Audit and Performance Review), condition 5 (Decommissioning Plan), condition 6, (Review of Options for the Transport of Solid Sodium Cyanide), condition 7 (Transport of Solid Sodium Cyanide), condition 8 (Transport of Liquid Sodium Cyanide), condition 9 (Noise Management), condition 10 (Emissions Verification) and condition 11 (Cyanide Monitoring). Read more...

Downstream Processing Chemical Production Facility

Last updated: December 3, 2018

Wesfarmers Chemicals, Energy & Fertilisers Limited  proposes  to construct and operate a methanol plant with a production capacity of approximately 5,000 tonnes per day ( tpd ) on Site E within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula.     The proposal is adjacent to the  Murujuga  National Park.      The proposal would  result in the  disturbance of  approximately  75 hectares within Site E.     Read more...

Maintenance Dredging of Garden Island Wharves

Last updated: June 20, 2016

The Department of Defence proposes to undertake maintenance dredging of accumulated sediments alongside its marine infrastructure on the eastern side of Garden Island, in Cockburn Sound, to return naval waters to navigable depths. Approximately 1,900 cubic metres (m 3 ) of material is to be excavated from four locations in Careening Bay and 5,480m 3 of material from the Armaments Wharf in Sulphur Bay. The proposed dredging method is to use a long reach excavator with a bucket fitted with a... Read more...

Southern Seawater Desalination Project

Last updated: June 30, 2010

The proposal is to construct and operate a minimum 50 GL/annum and up to 100 GL/annum desalination plant on Lots 32 and 33, and Part Lot 8 Taranto Road, Binningup; marine inlet/outlet pipes; and a water supply pipeline to transport potable water to the Integrated Water Supply Scheme via a storage facility near Harvey. Read more...

Ammonia-Urea Plant, Burrup Peninsula

Last updated: October 12, 2005

The proposal is to construct an ammonia–urea plant on the Burrup Peninsula. The plant will have a production capacity of 2300 tonnes/day (t/d) of ammonia and 3500 t/d of urea. The plant and associated infrastructure will be composed of: a natural gas supply pipeline from the North West Shelf Liquefied Natural Gas (LNG) Plant (to be located in a multi-user service corridor); ammonia plant; urea plant; fluid bed granulation plant; seawater desalination, treatment and storage; internal power... Read more...

Ammonium Nitrate Production Facility Expansion, Kwinana

Last updated: September 21, 2005

CSBP currently produces approximately 235,000 tpa of ammonium nitrate at its Kwinana operations which are located within the Kwinana Industrial Area. This proposal is to expand the ammonium nitrate production capacity to approximately 580,000 tpa by debottlenecking and duplicating its existing facilities. The expansion includes: duplication and/or debottlenecking of the existing 500 tpd nitric acid plant; duplication and/or debottlenecking of the existing 635 tpd ammonium nitrate reaction plant... Read more...

Commercial HIsmelt Plant, Kwinana, WA

Last updated: November 18, 2002

The proposal is to construct and operate a commercial scale HIsmelt Process Plant at Kwinana in Western Australia. The plant will be located at the site currently occupied by the existing HIsmelt Research and Development Facility (HRDF) within the northern portion of the Kwinana Industrial Area (KIA), 40km south of Perth. The Stage 1 plant will initially produce around 820,000 tonnes per annum of pig iron. If the Stage 1 plant is found to be technically and commercially viable, the proponent... Read more...

Proposed Gas to Synthetic Hydrocarbons Plant, Burrup Peninsula

Last updated: September 18, 2000

Proposal to construct a gas to synthetics plant on the Burrup peninsula. Read more...

Limestone mine, quicklime plant and use of existing port facility (Point Murat)

Last updated: November 6, 1997

The proposal includes the following key features: construction and operation of a metallurgical limestone mine; production of quicklime at a quicklime plant to be located at the mine; road transportation of limestone and quicklime through Exmouth; and shipping of limestone and quicklime from the Point Murat jetty. Read more...

Staged expansion of Tiwest Pigment Plant to 180,000 tpa, Kwinana

Last updated: June 30, 1997

The proposal is to increase the production capacity of Tiwest's titanium dioxide plant at Kwinana. The proposal is to modify/expand the existing plant to allow an increase in production capacity from 80,000 tonne per annum (tpa) to 180,00 tpa of titanium dioxide pigment in three notional stages: Stage I: increase to 120,000 tpa, Stage 2: increase to 165,000 tpa and Stage 3: increase to nominally 180,000 tpa. The first and second stages of the expansion wilI require major modifications to... Read more...

Expansion of alumina production from 2.0 million tonnes per annum to 3.5 million tonnes per annum at Worsley refinery, and associated bauxite mining activities at Boddington

Last updated: July 2, 1996

The proposal is to expand alumina production from 2.0 million tonnes per annum to 3.5 million tonnes per annum at the Worsley Alumina Refinery, Collie, and undertake associated bauxite mining activities at Boddington. Read more...

Pages

  • 1
  • 2
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.