Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • (-) Remove Infrastructure filter Infrastructure
  • Land use (3) Apply Land use filter

Filter by current status:

  • Ministerial Statement published (9) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (2) Apply Decision on whether to assess has been published filter

Filter by relevant environmental factors:

  • Flora and Vegetation (6) Apply Flora and Vegetation filter
  • Hydrological Processes (3) Apply Hydrological Processes filter
  • Inland Waters Environmental Quality (3) Apply Inland Waters Environmental Quality filter
  • Terrestrial Environmental Quality (3) Apply Terrestrial Environmental Quality filter
  • Terrestrial Fauna (3) Apply Terrestrial Fauna filter
  • Benthic Communities and Habitats (2) Apply Benthic Communities and Habitats filter
  • Marine Environmental Quality (2) Apply Marine Environmental Quality filter
  • 37 (1) Apply 37 filter
  • Coastal Processes (1) Apply Coastal Processes filter
  • Inland Waters (1) Apply Inland Waters filter
  • Marine Fauna (1) Apply Marine Fauna filter
  • Social Surroundings (1) Apply Social Surroundings filter

Filter by Proponent:

  • Point Grey Development Company Pty Ltd (2) Apply Point Grey Development Company Pty Ltd filter
  • Aureus Commercial Pty Ltd (1) Apply Aureus Commercial Pty Ltd filter
  • DBNGP (WA) Nominees Pty Limited (1) Apply DBNGP (WA) Nominees Pty Limited filter
  • Department of Marine and Harbours (1) Apply Department of Marine and Harbours filter
  • Main Roads Western Australia (1) Apply Main Roads Western Australia filter
  • Peel Waterways Pty Ltd (1) Apply Peel Waterways Pty Ltd filter
  • State Energy Commission of Western Australia (1) Apply State Energy Commission of Western Australia filter
  • Wannunup Development Nominees Pty Ltd (1) Apply Wannunup Development Nominees Pty Ltd filter
  • Water Corporation (1) Apply Water Corporation filter
  • Water Corporation of Western Australia (1) Apply Water Corporation of Western Australia filter

Filter by region:

  • (-) Remove Peel filter Peel
  • South West (2) Apply South West filter
  • Perth (1) Apply Perth filter

Filter by last updated:

  • 2019 (1) Apply 2019 filter
  • 2018 (1) Apply 2018 filter
  • 2016 (1) Apply 2016 filter
  • 2012 (2) Apply 2012 filter
  • 2007 (1) Apply 2007 filter
  • 2002 (1) Apply 2002 filter
  • 1993 (2) Apply 1993 filter
  • 1992 (1) Apply 1992 filter
  • 1988 (1) Apply 1988 filter
  1. Home
  2. Proposal search
  3. Infrastructure
  4. Peel

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Dampier to Bunbury Natural Gas Pipeline (DBNGP) to Albemarle Lithium Plant Gas Pipeline Proposal

Last updated: March 5, 2019

DBNGP (WA) Nominees Pty Limited propose to construct 670m of underground natural gas pipeline between the Albemarle Kemerton Plant (a lithium hydroxide manufacturing plant) and the existing Dampier to Bunbury Natural Gas Pipeline.  The proposal is located in Kemerton, approximately 17km north-east of Bunbury and will provide natural gas to the Albemarle Kemerton Plant (Ministerial Statement No. 1085) . The proposed pipeline will be constructed within a 30m wide corridor requiring clearing of 2.... Read more...

Point Grey Marina (S46)

Last updated: September 21, 2018

This is the inquiry into a request for changes to Ministerial Statement 906 , relating to the Point Grey Marina. Read more...

Port Rockingham Marina - inquiry under section 46

Last updated: November 14, 2016

The Port Rockingham Marina proposal is to construct and operate a new marina facility located at the intersection of Wanliss Street and Rockingham Beach Road, Rockingham, within Cockburn Sound. The EPA assessed the proposal at the level of Public Environmental Review and released its assessment report (Report 1339) in September 2009. Read more...

Ravenswood/West Murray 2A lnfill Sewerage Project

Last updated: September 17, 2012

The proposal is to construct infill sewerage infrastructure within an existing built-up area in the location of Ravenswood. The new infrastructure would service 54 residences that are currently utilising septic tanks and leach drains and are all situated in close proximity to the Murray River. The key components of the proposal involve: construction of approximately 1.3 km of dual pressure 100 mm diameter sewer pipelines and 1.5 km of gravity sewer pipeline;  construction of a 'Type 1 0... Read more...

Point Grey Marina

Last updated: August 1, 2012

The proposal is for the construction of an onshore marina (and associated boating infrastructure e.g. boat pens, jetties, navigational aids, entrance channel, protective groynes, public boat ramps and car parks) on the western side of the Point Grey peninsula. The proposal also includes the construction of a 2.5 kilometre navigation channel across the Harvey Estuary from the marina to the Dawesville Channel. Read more...

Perth – Bunbury Highway (Peel Deviation)

Last updated: September 24, 2007

The proposed Peel Deviation project involves the construction of 52.1 km of dual carriageway freeway-standard highway from the future freeway link north of Mandurah to the existing Perth-Bunbury Highway (Old Coast Road) at Lake Clifton. Read more...

Samson Brook Redevelopment Scheme

Last updated: September 13, 2002

The proposal being assessed is for the diversion of 8 gigalitres a year (on average) (GL/yr) of unallocated water resources in the Samson Catchment to be diverted for public water supply, the construction of a pipe head dam and related infrastructure. The Samson Brook Redevelopment Scheme is a key element of the Water Corporation’s drought recovery plan. Read more...

Extension of Reclamation Dawesville Channel Mandurah (s46) [701]

Last updated: April 19, 1993

Inquiry under s46 into a proposal to amend the environmental conditions of Ministerial Statement 55 to increase the extent of reclamation. Read more...

Port Bouvard urban and canal development Stage 2, North Port and East Port

Last updated: April 6, 1993

The land proposed to be developed as part of the Northport and Eastport proposals involves land currently in the ownership of the proponent and land currently under the ownership of State Government authorities which is to be transferred to the proponent under an existing land exchange agreement. The proposal also involves the creation of an additional 11ha of land, proposed to be reclaimed from the Harvey Estuary. Read more...

Extension to Yunderup Canals Estate

Last updated: January 17, 1992

The proposal to extend Yunderup Canals involves the construction of two additional canals. One canal is located to the east of the existing development on Lots 5, 6, 7 and 8 Kiap Road (17 .2 ha) and is aligned north-south, and the second canal is located to the north of the entrance to the existing development on Lot 18 Warma Way (5.7 ha) and is aligned northeast-southwest. The proposed development will include 7.4 ha of new canal waterway, 160 residential lots, a local store with a petrol... Read more...

Proposed Harvey to Kwinana 330Kv Transmission Line

Last updated: October 14, 1988

The proposal is for a 330 kV transmission line from Harvey to Kwinana, a distance of approximately 102 km. The first 51 km of the route parallels the existing Bunbury - Cannington 132 kV line from the Harvey Substation site almost to Pinjarra. There are a number of deviations to avoid major road intersections, dwellings and their environs and Pinjarra townsite. Following this , the route joins the existing Muja - Southern Terminal 330 kV line and follows it for most of the next 44 km. There is... Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.