Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • (-) Remove Infrastructure filter Infrastructure
  • Industrial (1) Apply Industrial filter
  • Iron Ore (1) Apply Iron Ore filter
  • Land use (1) Apply Land use filter
  • Oil and gas (1) Apply Oil and gas filter

Filter by current status:

  • Ministerial Statement published (4) Apply Ministerial Statement published filter
  • Ministerial Statement withdrawn under s.47A (2) Apply Ministerial Statement withdrawn under s.47A filter
  • Assessment has been terminated under s40A of the EP Act (1) Apply Assessment has been terminated under s40A of the EP Act filter

Filter by relevant environmental factors:

  • (-) Remove Terrestrial Environmental Quality filter Terrestrial Environmental Quality
  • Social Surroundings (5) Apply Social Surroundings filter
  • Flora and Vegetation (4) Apply Flora and Vegetation filter
  • 37 (3) Apply 37 filter
  • Terrestrial Fauna (3) Apply Terrestrial Fauna filter
  • Inland Waters Environmental Quality (2) Apply Inland Waters Environmental Quality filter
  • Marine Environmental Quality (2) Apply Marine Environmental Quality filter
  • Benthic Communities and Habitats (1) Apply Benthic Communities and Habitats filter
  • Hydrological Processes (1) Apply Hydrological Processes filter
  • Inland Waters (1) Apply Inland Waters filter
  • Subterranean Fauna (1) Apply Subterranean Fauna filter

Filter by Proponent:

  • Aztec Resources Limited (1) Apply Aztec Resources Limited filter
  • CSBP Limited (1) Apply CSBP Limited filter
  • Department of Environment and Conservation (1) Apply Department of Environment and Conservation filter
  • Port Hedland Port Authority (1) Apply Port Hedland Port Authority filter
  • Public Transport Authority (1) Apply Public Transport Authority filter
  • SF Irrigation Cooperative Limited (1) Apply SF Irrigation Cooperative Limited filter
  • Woodside Energy Ltd (1) Apply Woodside Energy Ltd filter

Filter by region:

  • Perth (2) Apply Perth filter
  • Pilbara (2) Apply Pilbara filter
  • Goldfields Esperance (1) Apply Goldfields Esperance filter
  • Kimberley (1) Apply Kimberley filter
  • South West (1) Apply South West filter

Filter by last updated:

  • (-) Remove 2024 filter 2024
  1. Home
  2. Proposal search
  3. Infrastructure
  4. 2024
  5. Terrestrial Environmental Quality

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Pluto LNG Development (Site B Option), Burrup Peninsula

Last updated: November 25, 2024

The construction of facilities for the development of the Pluto Gas Field on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on the Burrup Peninsula. Extensive dredging will be undertaken adjacent to the export facility. Read more...

Coastal Walk Trail from Point Ann to Hamersley Inlet - Fitzgerald River National Park

Last updated: October 16, 2024

The proposal is to construct and maintain a 45 kilometre (km) coastal walk trail from Point Ann to Hamersley Inlet, through the Wilderness Management Zone of the Fitzgerald River National Park. Camping facilities such as sleeping huts, water collection facilities and toilets would be constructed at camping points along the walk trail. The proposal would also require vehicle access tracks for ongoing maintenance of the walk trail, camping facilities, and emergency response. Read more...

Utah Point Berth Project (Stage B)

Last updated: September 27, 2024

The Utah Point Berth Project consists of two separate stages: Stage A: Dredging and Reclamation; and Stage B: Construction and Operation. Stage A, dredging and reclamation works for the UPBP was approved by the Minister for Environment as an amendment to the existing Fortescue Metals Group (FMG) approval and managed according to the approved conditions. The works for Stage A have been successfully completed. The EPA determined that Stage B, the construction and ongoing operation of stockyard... Read more...

Koolan Island Iron Ore Mine and Port Facility

Last updated: April 24, 2024

Re-opening of an iron ore mine; construction of associated infrastructure and a port facility on Koolan Island; and subsequent rehabilitation and decommissioning of the site. Read more...

Yanchep Rail Extension: Part 1 – Butler to Eglinton

Last updated: April 19, 2024

The Public Transport Authority (PTA) proposes to extend the existing Joondalup railway line by 7.3 kilometres from Butler Station to the suburb of Eglinton in the City of Wanneroo. The proposal is to construct and operate the rail extension and includes two new intermodal (rail, bus, ‘park and ride’, ‘kiss and ride’, walk and cycle) transit stations at Alkimos and Eglinton. The PTA will operate train services between Perth and Eglinton Stations and bus services from the Alkimos and Eglinton... Read more...

Ammonium Nitrate Production Expansion Project: Phase 2, Kwinana

Last updated: March 7, 2024

The proposal is to expand CSBP's Kwinana Ammonium Nitrate Production Facility (ANPF) by incorporating additional components into the existing facility and re-engineering (debottlenecking) some existing components in order to increase ammonium nitrate production capacity from 520,000 tpa to 936,000 tpa. Read more...

Southern Forest Irrigation Scheme

Last updated: February 28, 2024

The, Southern Forest Irrigation Scheme, proposal involves taking water from the Donnelly River to irrigate land for horticultural and agricultural production in the southern forests region around Manjimup and Pemberton. The proposal is to construct and operate a water offtake (pump station) adjacent to the Donnelly River, a reservoir on Record Brook (a tributary of the Donnelly River), two header dams and a network of distribution water pipelines and associated infrastructure to supply water to... Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.