Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Infrastructure (67) Apply Infrastructure filter
  • Land use (33) Apply Land use filter
  • Iron Ore (29) Apply Iron Ore filter
  • Sand, rock, gravel and clay (28) Apply Sand, rock, gravel and clay filter
  • Oil and gas (19) Apply Oil and gas filter
  • Industrial (18) Apply Industrial filter
  • Power generation (16) Apply Power generation filter
  • Utilities (16) Apply Utilities filter
  • Waste management (14) Apply Waste management filter
  • Gold (11) Apply Gold filter
  • Nickel (7) Apply Nickel filter
  • Rare earth elements (7) Apply Rare earth elements filter
  • Clearing (6) Apply Clearing filter
  • Mineral sands (6) Apply Mineral sands filter
  • Aquaculture (3) Apply Aquaculture filter
  • Copper (3) Apply Copper filter
  • Molybdenum (2) Apply Molybdenum filter
  • Lithium (1) Apply Lithium filter
  • Potash (1) Apply Potash filter
  • Salt (1) Apply Salt filter

Filter by current status:

  • (-) Remove Decision on whether to assess has been published filter Decision on whether to assess has been published

Filter by preliminary environmental factors:

  • Flora and Vegetation (96) Apply Flora and Vegetation filter
  • Terrestrial Fauna (86) Apply Terrestrial Fauna filter
  • Social Surroundings (73) Apply Social Surroundings filter
  • Inland Waters (46) Apply Inland Waters filter
  • 3144 (35) Apply 3144 filter
  • Marine Fauna (35) Apply Marine Fauna filter
  • Marine Environmental Quality (32) Apply Marine Environmental Quality filter
  • Benthic Communities and Habitats (31) Apply Benthic Communities and Habitats filter
  • Inland Waters Environmental Quality (27) Apply Inland Waters Environmental Quality filter
  • Terrestrial Environmental Quality (25) Apply Terrestrial Environmental Quality filter
  • Subterranean Fauna (23) Apply Subterranean Fauna filter
  • Hydrological Processes (20) Apply Hydrological Processes filter
  • 37 (16) Apply 37 filter
  • Coastal Processes (15) Apply Coastal Processes filter
  • Landforms (8) Apply Landforms filter
  • Greenhouse Gas Emissions (7) Apply Greenhouse Gas Emissions filter
  • Human Health (6) Apply Human Health filter
  • Air Quality (2) Apply Air Quality filter
  • Sea (1) Apply Sea filter

Filter by Proponent:

  • Main Roads Western Australia (10) Apply Main Roads Western Australia filter
  • Water Corporation (9) Apply Water Corporation filter
  • Department of Transport (6) Apply Department of Transport filter
  • BHP Iron Ore Pty Ltd (5) Apply BHP Iron Ore Pty Ltd filter
  • Chevron Australia Pty Ltd (3) Apply Chevron Australia Pty Ltd filter
  • Fortescue Metals Group (3) Apply Fortescue Metals Group filter
  • Pilbara Energy (Generation) Pty Ltd (3) Apply Pilbara Energy (Generation) Pty Ltd filter
  • Regional Power Corporation T/A Horizon Power (3) Apply Regional Power Corporation T/A Horizon Power filter
  • Rottnest Island Authority (3) Apply Rottnest Island Authority filter
  • Shire of Broome (3) Apply Shire of Broome filter
  • Atlas Iron Pty Ltd (2) Apply Atlas Iron Pty Ltd filter
  • Australian Vanadium Limited (2) Apply Australian Vanadium Limited filter
  • Bellevue Gold Limited (2) Apply Bellevue Gold Limited filter
  • Buru Energy Limited (2) Apply Buru Energy Limited filter
  • City of Busselton (2) Apply City of Busselton filter
  • Commissioner of Main Roads (2) Apply Commissioner of Main Roads filter
  • Department of Defence (2) Apply Department of Defence filter
  • Department of Primary Industries and Regional Development (2) Apply Department of Primary Industries and Regional Development filter
  • Hamersley Iron Pty Limited (2) Apply Hamersley Iron Pty Limited filter
  • Holcim (Australia) Pty Ltd (2) Apply Holcim (Australia) Pty Ltd filter
  • Hypermarket Pty Ltd (2) Apply Hypermarket Pty Ltd filter
  • Kelliher Bros. (2) Apply Kelliher Bros. filter
  • Kimberley Ports Authority (2) Apply Kimberley Ports Authority filter
  • LandCorp (2) Apply LandCorp filter
  • Main Roads WA (2) Apply Main Roads WA filter
  • Pluton Resources Ltd (2) Apply Pluton Resources Ltd filter
  • Shire of Ashburton (2) Apply Shire of Ashburton filter
  • Western Australian Land Authority (2) Apply Western Australian Land Authority filter
  • Albany Port Authority (1) Apply Albany Port Authority filter
  • BHP Billiton Iron Ore Pty Ltd (1) Apply BHP Billiton Iron Ore Pty Ltd filter
  • City of Geraldton (1) Apply City of Geraldton filter
  • CSBP Limited (1) Apply CSBP Limited filter
  • Doral Mineral Sands Pty Ltd (1) Apply Doral Mineral Sands Pty Ltd filter
  • Eastern Metropolitan Regional Council (1) Apply Eastern Metropolitan Regional Council filter
  • Forge Resources Swan Pty Ltd (1) Apply Forge Resources Swan Pty Ltd filter
  • Grange Resources Limited (1) Apply Grange Resources Limited filter
  • Hinckley Range Pty Ltd (1) Apply Hinckley Range Pty Ltd filter
  • Karara Mining Limited (1) Apply Karara Mining Limited filter
  • Kemerton Silica Sand Pty Ltd (1) Apply Kemerton Silica Sand Pty Ltd filter
  • Minister for State Development (1) Apply Minister for State Development filter
  • Moly Metals Australia Pty Ltd (1) Apply Moly Metals Australia Pty Ltd filter
  • Norwest Energy NL (1) Apply Norwest Energy NL filter
  • Point Grey Development Company Pty Ltd (1) Apply Point Grey Development Company Pty Ltd filter
  • Robe River Mining Co. Pty. Ltd (1) Apply Robe River Mining Co. Pty. Ltd filter
  • Roy Hill Infrastructure Pty Ltd (1) Apply Roy Hill Infrastructure Pty Ltd filter
  • Roy Hill Iron Ore Pty Ltd (1) Apply Roy Hill Iron Ore Pty Ltd filter
  • Tronox Management Pty Ltd (1) Apply Tronox Management Pty Ltd filter
  • Tropicana Joint Venture (1) Apply Tropicana Joint Venture filter
  • Urban Resources Pty Ltd (1) Apply Urban Resources Pty Ltd filter
  • Verve Energy (1) Apply Verve Energy filter

Filter by region:

  • Perth (74) Apply Perth filter
  • Pilbara (65) Apply Pilbara filter
  • South West (34) Apply South West filter
  • Mid West (26) Apply Mid West filter
  • Goldfields Esperance (20) Apply Goldfields Esperance filter
  • Kimberley (20) Apply Kimberley filter
  • Wheatbelt (17) Apply Wheatbelt filter
  • Peel (13) Apply Peel filter
  • Gascoyne (7) Apply Gascoyne filter
  • Great Southern (4) Apply Great Southern filter

Filter by last updated:

  • 2025 (25) Apply 2025 filter
  • 2024 (36) Apply 2024 filter
  • 2023 (21) Apply 2023 filter
  • 2022 (22) Apply 2022 filter
  • 2021 (17) Apply 2021 filter
  • 2020 (22) Apply 2020 filter
  • 2019 (23) Apply 2019 filter
  • 2018 (15) Apply 2018 filter
  • 2017 (15) Apply 2017 filter
  • 2016 (39) Apply 2016 filter
  • 2015 (5) Apply 2015 filter
  • 2014 (3) Apply 2014 filter
  • 2013 (18) Apply 2013 filter
  • 2012 (14) Apply 2012 filter
  • 2011 (1) Apply 2011 filter
  • 2008 (1) Apply 2008 filter
  • 2007 (1) Apply 2007 filter
  • 1996 (1) Apply 1996 filter
  1. Home
  2. Proposal search
  3. Decision on whether to assess has been published

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Sand and Limestone Extraction M70/1319 and M70/1320

Last updated: December 8, 2016

PMR Quarries Pty Ltd, trading as WA Limestone, proposes to develop a sand and limestone quarry in the McLarty State forest (pine plantation) at Myalup, 8 kilometres south east of Lake Clifton township. Read more...

Marda Gold Project

Last updated: December 8, 2016

Southern Cross Goldfields Limited proposes to develop an open pit gold mine operation and gold processing plant 150 kilometres north of Southern Cross. The proposal would involve mining 1.6 million tonnes (Mt) of ore and 8.2 Mt of waste rock over a life of 2.5 years at three pit locations; Marda Central, King Brown and Golden Orb. The processing plant, tailings storage facility, and two out of four of the waste rock landforms would be located at Marda Central. The remaining two waste rock... Read more...

Various Commercial Purposes Developments - Lot 616, Lot 1221 and Port Drive Road Reserve, within Port of Broome

Last updated: December 8, 2016

The Broome Port Authority proposes to clear approximately 24.55 hectares (ha) of native vegetation within Lot 616, Lot 1221 and Port Drive road reserve, Broome, in order to establish a wash-down facility, supply bases to support exploration of the Browse Basin (drilling fluid facility) and ancillary small businesses. Read more...

Onslow Water Infrastructure Upgrade Project

Last updated: December 8, 2016

In September 2011 Chevron Australia Propriety Limited (CAPL) and the Department of State Development (DSD) executed an agreement (Ashburton North State Development Agreement (Wheatstone Project) (SDA)) that required CAPL, to develop and execute a project that increased potable water supply to Onslow by 2 ML/day. This project is referred to as the Onslow Water Infrastructure Upgrade Project. After completion of the works the assets will be handed-over to the Water Corporation for ongoing... Read more...

Sand Mining Neaves Road, Mariginiup

Last updated: December 8, 2016

The Environmental Protection Authority has received a referral for sand mining operations within prospecting licences P 70/1596 and P70/1597. The prospecting licences are proposed to be converted to a mining lease. The proposed sand mining area is located wholly within State Forest 65 (Gnangara pine plantation) which is vested in the Conservation Commission of Western Australia and managed by the Department of Parks and Wildlife. Read more...

Wonnerup North Mineral Sands Project

Last updated: December 8, 2016

Cristal Australia Pty Ltd proposes the Wonnerup North Mineral Sands Project located approximately 10 kilometres east of Busselton, City of Busselton. The project would involve dry mining and processing of mineral sands ore from the Wonnerup North deposit at a rate of approximately 2.3 million tonnes (Mt) per annum over eight years. Read more...

Henderson Facility Land-Backed Wharf and Dredging, City of Cockburn

Last updated: December 8, 2016

BAE Systems Australia Ltd is proposing dredging of approximately 1.3 hectares to -6.0m CD and construction of a 75m long land backed wharf close to the existing shoreline. Dredging is proposed to commence in September 2013 and is estimated to take 4 weeks in duration. Construction of the land backed wharf will take up to 9 months. Read more...

Residential subdivision Lot 701 Mayor Road, Munster, City of Cockburn

Last updated: December 8, 2016

The referral received by the EPA is to develop Lot 701 for residential use. The land is zoned 'Urban' under the Metropolitan Region Scheme and 'Residential' (with a residential density coding of R30) under the City of Cockburn Town Planning Scheme No.3. Lot 701 totals approximately 1.71 hectares, of which Auro Pty Ltd proposes to develop approximately one hectare. The subdivision application proposes 16 residential dwellings and a proposed Public Open Space. Approximately... Read more...

Baldivis Sand Quarry Stage 1 Expansion

Last updated: December 8, 2016

The proposal is to expand the existing Baldivis Sand Quarry Stage 1 operation for approximately three years. The proposal is located within Department of Mines and Petroleum (DMP) mining lease M70/1046 and operates under Department of Environment Regulation (DER) Licence L8176/2007/2 and Department of Water Licence (GWL 162863(2)). The proposal is on Department of Parks and Wildlife managed land (State Forest). The area was previously a pine plantation which was then cleared, burned and... Read more...

Sand Quarries within Gnangara Pine Plantation

Last updated: December 7, 2016

Hanson Australia Pty Ltd (‘the proponent’) proposes to develop three sand quarries within the Gnangara Pine Plantation on tenements E70/3279 (Smokebush Hill), E70 - 3275 (Tamega Road) and M70- 1306 (Mulga Road) (‘the proposal’). Smokebush Hill is located in Two Rocks, approximately 55 kilometres (km) north of Per th Central Business District (CBD) . Tamega Road is located in Pinjar, approxi mately 47 km north of Perth CBD. Mulga Road is located in Gnangara, approxi mately 20 km north of Perth... Read more...

Florida North Residential Development

Last updated: December 7, 2016

The Florida Partnership is proposing to subdivide and construct the portion of Florida Beach Estate known as ‘Florida North’, which will create approximately 161 lots for residential development. The site is zoned for this purpose in the Peel Region Scheme and the City of Mandurah Town Planning Scheme. The proposed development footprint is approximately 16.73 hectares (ha) and will require clearing approximately 11.72 ha of native vegetation. Read more...

Alterations and Additions to Existing Poultry Farm

Last updated: December 7, 2016

The Shire of Gingin has referred an application to make alterations and additions to an existing Poultry farm. The application, from Allerding and Associates on behalf of Snowdale Holdings Pty Ltd, is to add four additional free range chicken sheds and associated paddocks, a manure storage shed, workers accommodation for staff, and to relocate the proposed caretakers dwelling. The purpose of the alterations and additions is to increase the farm capacity from 120,000 to 240,000 chickens. Read more...

KCGM Hidden Secret Project

Last updated: December 7, 2016

The proposal referred to the Environmental Protection Authority is the Hidden Secret underground Mine. Kalgoorlie Consolidated Gold Mines Pty Ltd (KCGM) proposes to mine for gold at the Hidden Secret ore body. Hidden secret is an underground ore body located east of Williamstown, 350 metres east of the Mt Charlotte underground mine. The Mt Charlotte Underground Mine is operated by KCGM and is located adjacent to the City of Kalgoorlie-Boulder, approximately 600 kilometres east of Perth. Mining... Read more...

Clearing of 65 to 112 ha of native vegetation, Kent location 1858, Shire of Gnowangerup

Last updated: December 7, 2016

The proposal is to clear some portion of Kent Location 1858 for agricultural purposes. The exact area of proposed clearing has changed as the proponent has made further submissions to the State Administrative Tribunal. It is understood that the proponent’s current application is to clear approximately 65 hectares of native vegetation. Read more...

West Erregulla 2 Exploration Well

Last updated: December 7, 2016

Warrego Energy Pty Ltd proposes to develop the West Erregulla-2 Exploration Well located approximately 50 kilometres south - east of Dongara. The proposal is a proof of concept (single well). The exploration targets are at depths of 2,000 metres (m) to 5,000m and include geological structures that may yield natural gas. This includes the Dongara tight sandstone which is found below 3,900m and is expected to require hydraulic fracturing. Read more...

Construction of Revetment Wall at Point Busaco Bunbury

Last updated: December 7, 2016

The Southern Ports Authority proposes to construct a 230 metre (m) rock revetment wall to provide erosion protection on port authority land and undertake sand renourishment along eastern Koombana Beach, Bunbury. Read more...

Installation of Pipeline - Eaton Monash Pump Station to Bunbury WWTP

Last updated: December 7, 2016

The Water Corporation proposes to construct a wastewater pressure main from Monash Boulevard Pump Station to Bunbury Wastewater Treatment Plant and has referred a small portion of the pipeline between Verschuer Place and Southwest Highway, Davenport, to the Environmental Protection Authority (EPA). In considering the proposal the EPA notes that the section of pipe alignment referred intersects the corner boundary of a wetland mapped under the, Environmental Protection (Swan Coastal Plain Lakes... Read more...

Clearing of 1.31 hectares of native vegetation for the purpose of road construction

Last updated: December 7, 2016

The Shire of Murray proposes to construct an approximate 650 metre section of Fiegert Road, Barragup in the vincinity of the Nambeelup Brook. In considering this proposal the EPA notes that an informal (4 wheel drive accessible) track is already in place within the existing road reserve, and infrastructure in the form of a bridge is in place over the Nambeelup Brook. Read more...

Agriculture Intensive (Turf Production)

Last updated: December 7, 2016

The Shire of Gingin has referred an application for planning approval to the EPA for a decision on whether or not to assess the proposal and, if so, the level of assessment. The application, from Saratoga Holdings Pty Ltd, is for turf production on Lot 5, 55 Clark Road, Neergabby in Gingin (Shire of Gingin). Read more...

Albany Port Maintenance Dredging

Last updated: December 7, 2016

The Albany Port Authority (APA) proposes to undertake maintenance dredging to remove 'high spots' within the Port of Albany entrance channel and harbor basin, to reinstate navigation depths. The APA proposes to dispose of approximately 82,400 cubic metres of dredged material offshore in King George Sound near the boundary of the Port water limit. The offshore disposal site (G7) has not previously been used but has been designated for the proposed Albany Port Expansion Project which... Read more...

Pages

  • « first
  • ‹ previous
  • …
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.