Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Infrastructure (9) Apply Infrastructure filter
  • Sand, rock, gravel and clay (8) Apply Sand, rock, gravel and clay filter
  • Land use (5) Apply Land use filter
  • Industrial (4) Apply Industrial filter
  • Clearing (3) Apply Clearing filter
  • Waste management (3) Apply Waste management filter
  • Gold (2) Apply Gold filter
  • Mineral sands (2) Apply Mineral sands filter
  • Copper (1) Apply Copper filter
  • Nickel (1) Apply Nickel filter
  • Oil and gas (1) Apply Oil and gas filter

Filter by current status:

  • (-) Remove Decision on whether to assess has been published filter Decision on whether to assess has been published

Filter by preliminary environmental factors:

  • Flora and Vegetation (11) Apply Flora and Vegetation filter
  • Terrestrial Fauna (10) Apply Terrestrial Fauna filter
  • Inland Waters Environmental Quality (9) Apply Inland Waters Environmental Quality filter
  • Social Surroundings (8) Apply Social Surroundings filter
  • Hydrological Processes (6) Apply Hydrological Processes filter
  • 37 (5) Apply 37 filter
  • Benthic Communities and Habitats (3) Apply Benthic Communities and Habitats filter
  • Human Health (3) Apply Human Health filter
  • Coastal Processes (1) Apply Coastal Processes filter
  • Marine Environmental Quality (1) Apply Marine Environmental Quality filter
  • Marine Fauna (1) Apply Marine Fauna filter
  • Terrestrial Environmental Quality (1) Apply Terrestrial Environmental Quality filter

Filter by Proponent:

  • Holcim (Australia) Pty Ltd (2) Apply Holcim (Australia) Pty Ltd filter
  • Main Roads Western Australia (2) Apply Main Roads Western Australia filter
  • Water Corporation (2) Apply Water Corporation filter
  • Albany Port Authority (1) Apply Albany Port Authority filter
  • Aurigen Group Ltd (1) Apply Aurigen Group Ltd filter
  • Auro Pty Ltd (1) Apply Auro Pty Ltd filter
  • BAE Systems Australia Ltd (1) Apply BAE Systems Australia Ltd filter
  • Brikmakers (1) Apply Brikmakers filter
  • Broome Port Authority (1) Apply Broome Port Authority filter
  • Carnegie Wave (1) Apply Carnegie Wave filter
  • Cristal Australia Pty Ltd (1) Apply Cristal Australia Pty Ltd filter
  • Department of Defence (1) Apply Department of Defence filter
  • Director General of the Department of the Premier and Cabinet on behalf of the State of Western Australia (1) Apply Director General of the Department of the Premier and Cabinet on behalf of the State of Western Australia filter
  • Eclipse Resources Pty Ltd (1) Apply Eclipse Resources Pty Ltd filter
  • Florida Partnership (1) Apply Florida Partnership filter
  • Forest Products Commission of Western Australia (1) Apply Forest Products Commission of Western Australia filter
  • G M & V M Plane (1) Apply G M & V M Plane filter
  • Hanson Australia Pty Ltd (1) Apply Hanson Australia Pty Ltd filter
  • Holcim Australia (1) Apply Holcim Australia filter
  • IB Operations Pty Ltd (1) Apply IB Operations Pty Ltd filter
  • KCGM (1) Apply KCGM filter
  • Keppel Holdings Pty Ltd (1) Apply Keppel Holdings Pty Ltd filter
  • LandCorp (1) Apply LandCorp filter
  • Main Roads WA (1) Apply Main Roads WA filter
  • PMR Quarries Pty Ltd (1) Apply PMR Quarries Pty Ltd filter
  • Saratoga Holdings Pty Ltd (1) Apply Saratoga Holdings Pty Ltd filter
  • Shire of Murray (1) Apply Shire of Murray filter
  • Sirius Gold Pty Ltd (1) Apply Sirius Gold Pty Ltd filter
  • Skiron OPCO Pty Limited (1) Apply Skiron OPCO Pty Limited filter
  • Snowdale Holdings (1) Apply Snowdale Holdings filter
  • Southern Cross Goldfields Limited (1) Apply Southern Cross Goldfields Limited filter
  • SPA Port of Bunbury (1) Apply SPA Port of Bunbury filter
  • Urban Resources Pty Ltd (1) Apply Urban Resources Pty Ltd filter
  • WA Limestone (1) Apply WA Limestone filter
  • Warrego Energy Pty Ltd (1) Apply Warrego Energy Pty Ltd filter
  • Wasterock Pty Ltd (1) Apply Wasterock Pty Ltd filter

Filter by region:

  • Perth (19) Apply Perth filter
  • South West (5) Apply South West filter
  • Goldfields Esperance (4) Apply Goldfields Esperance filter
  • Pilbara (3) Apply Pilbara filter
  • Wheatbelt (3) Apply Wheatbelt filter
  • Peel (2) Apply Peel filter
  • Gascoyne (1) Apply Gascoyne filter
  • Great Southern (1) Apply Great Southern filter
  • Kimberley (1) Apply Kimberley filter
  • Mid West (1) Apply Mid West filter

Filter by last updated:

  • (-) Remove 2016 filter 2016
  1. Home
  2. Proposal search
  3. Decision on whether to assess has been published
  4. 2016

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Margaret River Perimeter Road - Construction of a 7 km Dual Carriageway

Last updated: December 9, 2016

Read more...

Claremont North East Precinct

Last updated: December 8, 2016

The Claremont North East Precinct, located immediately north of the Perth to Fremantle Railway and encompassing the existing Claremont Oval, is proposed to be redeveloped for residential and commercial purposes. Read more...

Shark Drum Line Deployment, Management and Associated Services

Last updated: December 8, 2016

As part of a broader program of shark hazard mitigation (see details below), the Government of Western Australia is implementing a shark hazard mitigation strategy which involves the deployment of baited drum lines to capture target species of large sharks (the proposal). The proposal involves the deployment of up to 72 baited drum lines and rapid response within marine monitoring areas (MMA) in the metropolitan and the South West regions until 30 April 2014. The proposal commenced on 25... Read more...

Mitchell Freeway Extension Stage 1 (Burns Beach Road to Hester Avenue)

Last updated: December 8, 2016

The proposal has been referred by Main Roads Western Australia for the assessment of Neerabup Road East and Neerabup Road West only (within the Mitchell Freeway Extension). Stage 1 (Neerabup Road East/West) project includes grade separated interchanges (including road bridges) at Neerabup Road, underpasses at Neerabup Road, and Neerabup Road upgrade from Connolly Drive to Wanneroo Road connection to freeway. Read more...

Sand and Limestone Extraction M70/1319 and M70/1320

Last updated: December 8, 2016

PMR Quarries Pty Ltd, trading as WA Limestone, proposes to develop a sand and limestone quarry in the McLarty State forest (pine plantation) at Myalup, 8 kilometres south east of Lake Clifton township. Read more...

Marda Gold Project

Last updated: December 8, 2016

Southern Cross Goldfields Limited proposes to develop an open pit gold mine operation and gold processing plant 150 kilometres north of Southern Cross. The proposal would involve mining 1.6 million tonnes (Mt) of ore and 8.2 Mt of waste rock over a life of 2.5 years at three pit locations; Marda Central, King Brown and Golden Orb. The processing plant, tailings storage facility, and two out of four of the waste rock landforms would be located at Marda Central. The remaining two waste rock... Read more...

Various Commercial Purposes Developments - Lot 616, Lot 1221 and Port Drive Road Reserve, within Port of Broome

Last updated: December 8, 2016

The Broome Port Authority proposes to clear approximately 24.55 hectares (ha) of native vegetation within Lot 616, Lot 1221 and Port Drive road reserve, Broome, in order to establish a wash-down facility, supply bases to support exploration of the Browse Basin (drilling fluid facility) and ancillary small businesses. Read more...

Onslow Water Infrastructure Upgrade Project

Last updated: December 8, 2016

In September 2011 Chevron Australia Propriety Limited (CAPL) and the Department of State Development (DSD) executed an agreement (Ashburton North State Development Agreement (Wheatstone Project) (SDA)) that required CAPL, to develop and execute a project that increased potable water supply to Onslow by 2 ML/day. This project is referred to as the Onslow Water Infrastructure Upgrade Project. After completion of the works the assets will be handed-over to the Water Corporation for ongoing... Read more...

Sand Mining Neaves Road, Mariginiup

Last updated: December 8, 2016

The Environmental Protection Authority has received a referral for sand mining operations within prospecting licences P 70/1596 and P70/1597. The prospecting licences are proposed to be converted to a mining lease. The proposed sand mining area is located wholly within State Forest 65 (Gnangara pine plantation) which is vested in the Conservation Commission of Western Australia and managed by the Department of Parks and Wildlife. Read more...

Wonnerup North Mineral Sands Project

Last updated: December 8, 2016

Cristal Australia Pty Ltd proposes the Wonnerup North Mineral Sands Project located approximately 10 kilometres east of Busselton, City of Busselton. The project would involve dry mining and processing of mineral sands ore from the Wonnerup North deposit at a rate of approximately 2.3 million tonnes (Mt) per annum over eight years. Read more...

Henderson Facility Land-Backed Wharf and Dredging, City of Cockburn

Last updated: December 8, 2016

BAE Systems Australia Ltd is proposing dredging of approximately 1.3 hectares to -6.0m CD and construction of a 75m long land backed wharf close to the existing shoreline. Dredging is proposed to commence in September 2013 and is estimated to take 4 weeks in duration. Construction of the land backed wharf will take up to 9 months. Read more...

Residential subdivision Lot 701 Mayor Road, Munster, City of Cockburn

Last updated: December 8, 2016

The referral received by the EPA is to develop Lot 701 for residential use. The land is zoned 'Urban' under the Metropolitan Region Scheme and 'Residential' (with a residential density coding of R30) under the City of Cockburn Town Planning Scheme No.3. Lot 701 totals approximately 1.71 hectares, of which Auro Pty Ltd proposes to develop approximately one hectare. The subdivision application proposes 16 residential dwellings and a proposed Public Open Space. Approximately... Read more...

Baldivis Sand Quarry Stage 1 Expansion

Last updated: December 8, 2016

The proposal is to expand the existing Baldivis Sand Quarry Stage 1 operation for approximately three years. The proposal is located within Department of Mines and Petroleum (DMP) mining lease M70/1046 and operates under Department of Environment Regulation (DER) Licence L8176/2007/2 and Department of Water Licence (GWL 162863(2)). The proposal is on Department of Parks and Wildlife managed land (State Forest). The area was previously a pine plantation which was then cleared, burned and... Read more...

Sand Quarries within Gnangara Pine Plantation

Last updated: December 7, 2016

Hanson Australia Pty Ltd (‘the proponent’) proposes to develop three sand quarries within the Gnangara Pine Plantation on tenements E70/3279 (Smokebush Hill), E70 - 3275 (Tamega Road) and M70- 1306 (Mulga Road) (‘the proposal’). Smokebush Hill is located in Two Rocks, approximately 55 kilometres (km) north of Per th Central Business District (CBD) . Tamega Road is located in Pinjar, approxi mately 47 km north of Perth CBD. Mulga Road is located in Gnangara, approxi mately 20 km north of Perth... Read more...

Florida North Residential Development

Last updated: December 7, 2016

The Florida Partnership is proposing to subdivide and construct the portion of Florida Beach Estate known as ‘Florida North’, which will create approximately 161 lots for residential development. The site is zoned for this purpose in the Peel Region Scheme and the City of Mandurah Town Planning Scheme. The proposed development footprint is approximately 16.73 hectares (ha) and will require clearing approximately 11.72 ha of native vegetation. Read more...

Alterations and Additions to Existing Poultry Farm

Last updated: December 7, 2016

The Shire of Gingin has referred an application to make alterations and additions to an existing Poultry farm. The application, from Allerding and Associates on behalf of Snowdale Holdings Pty Ltd, is to add four additional free range chicken sheds and associated paddocks, a manure storage shed, workers accommodation for staff, and to relocate the proposed caretakers dwelling. The purpose of the alterations and additions is to increase the farm capacity from 120,000 to 240,000 chickens. Read more...

KCGM Hidden Secret Project

Last updated: December 7, 2016

The proposal referred to the Environmental Protection Authority is the Hidden Secret underground Mine. Kalgoorlie Consolidated Gold Mines Pty Ltd (KCGM) proposes to mine for gold at the Hidden Secret ore body. Hidden secret is an underground ore body located east of Williamstown, 350 metres east of the Mt Charlotte underground mine. The Mt Charlotte Underground Mine is operated by KCGM and is located adjacent to the City of Kalgoorlie-Boulder, approximately 600 kilometres east of Perth. Mining... Read more...

Clearing of 65 to 112 ha of native vegetation, Kent location 1858, Shire of Gnowangerup

Last updated: December 7, 2016

The proposal is to clear some portion of Kent Location 1858 for agricultural purposes. The exact area of proposed clearing has changed as the proponent has made further submissions to the State Administrative Tribunal. It is understood that the proponent’s current application is to clear approximately 65 hectares of native vegetation. Read more...

West Erregulla 2 Exploration Well

Last updated: December 7, 2016

Warrego Energy Pty Ltd proposes to develop the West Erregulla-2 Exploration Well located approximately 50 kilometres south - east of Dongara. The proposal is a proof of concept (single well). The exploration targets are at depths of 2,000 metres (m) to 5,000m and include geological structures that may yield natural gas. This includes the Dongara tight sandstone which is found below 3,900m and is expected to require hydraulic fracturing. Read more...

Construction of Revetment Wall at Point Busaco Bunbury

Last updated: December 7, 2016

The Southern Ports Authority proposes to construct a 230 metre (m) rock revetment wall to provide erosion protection on port authority land and undertake sand renourishment along eastern Koombana Beach, Bunbury. Read more...

Pages

  • 1
  • 2
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.