This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 25, 1997
The proposal is to drill and evaluate a land-based exploration well, Melanie-1, on Cape Range Peninsula for a gas and oil target. The proposal does not include any future plans to develop a gas or oil field. The proposed Melanie-1 exploration well is located near the north western tip of Cape Range Peninsula, inland of the Yardie Creek Road and behind the line of hills which form the continuation of Cape Range. The project site, which covers an area of approximately 0.8 hectares, is... Read more...Last updated: November 6, 1997
The proposal includes the following key features: construction and operation of a metallurgical limestone mine; production of quicklime at a quicklime plant to be located at the mine; road transportation of limestone and quicklime through Exmouth; and shipping of limestone and quicklime from the Point Murat jetty. Read more...Last updated: October 13, 1997
The proposal is to extend the Exmouth water supply borefield, and includes: extending the existing borefield, to the west (equipping existing bores) and to the south (drilling and equipping new bores); increasing the long term supply capacity from approximately 760 million litres per year (ML!yr) to 1,025ML!yr; constructing four dedicated stygofauna monitoring bores (two within the proposed borefield extension and two to the south of Shothole Canyon Road, which has been identified as future... Read more...Last updated: August 28, 1997
The proposal is for a staged development of a 120 hectare prawn farm at Heron Point, approximately 35 kilometres south of Exmouth in Exmouth Gulf. Read more...Last updated: July 23, 1997
The proposed Coral Coast Resort is proposed to be constructed in 4 Stages over a 20 year period. Stage 1 is proposed to be scheduled over 5 years and includes the following components: 'club resort' ( 400 rooms); caravan park (175 bays, 75 chalets); back packer hostel (60 beds); serviced apartments/townhouses (80 units); Visitor Centre, to be run by the Department of Conservation and Land Management; a Town Centre, including shopping plaza, retail outlets, tavern, parking facilities,... Read more...