ProjectProponent: Water CorporationProposal description: The proposal is to extend the Exmouth water supply borefield, and includes: extending the existing borefield, to the west (equipping existing bores) and to the south (drilling and equipping new bores); increasing the long term supply capacity from approximately 760 million litres per year (ML!yr) to 1,025ML!yr; constructing four dedicated stygofauna monitoring bores (two within the proposed borefield extension and two to the south of Shothole Canyon Road, which has been identified as future National Park) and two nests of dedicated saltwater interface monitoring (SWIM) bores. These will be used for long term monitoring; constructing seventeen water level monitoring bores, which will also be monitored for stygofauna; upgrading the infrastructure. Assessment Number: 921Region: GascoyneReferred under EP Act: s38Industry sector: InfrastructureLast updated: October 13, 1997Current Status: Ministerial Statement published 2. Decision on whether to assess this proposalChair's Determination: Consultative Environmental ReviewPreliminary Environmental Factors: Subterranean FaunaDate published: Saturday, 10 December, 1994 3. AssessmentScopingApproved: Wednesday, 25 January, 1995 Environmental ReviewPublic submissions: Wednesday, 2 August, 1995 to Saturday, 2 September, 1995Environmental Review documentation: Consultative Environmental Review document (PDF, 26.46 MB) 4. EPA Report on assessmentEPA Report Number: 843EPA Report: Extensions to the Exmouth Water Supply Borefield (PDF, 719.02 KB)Key Environmental Factors: Subterranean FaunaDate published: Tuesday, 1 April, 1997Appeals close: Tuesday, 15 April, 1997 5. Decision on proposal and implementation of proposalMinisterial StatementDate of approval: Monday, 13 October, 1997Ministerial Statement: Ministerial Statement 459 (PDF, 167.65 KB)