Extensions to the Exmouth water supply borefield

Project
Proponent: 
Proposal description: 

The proposal is to extend the Exmouth water supply borefield, and includes:

  • extending the existing borefield, to the west (equipping existing bores) and to the south (drilling and equipping new bores);
  • increasing the long term supply capacity from approximately 760 million litres per year (ML!yr) to 1,025ML!yr;
  • constructing four dedicated stygofauna monitoring bores (two within the proposed borefield extension and two to the south of Shothole Canyon Road, which has been identified as future National Park) and two nests of dedicated saltwater interface monitoring (SWIM) bores. These will be used for long term monitoring;
  • constructing seventeen water level monitoring bores, which will also be monitored for stygofauna;
  • upgrading the infrastructure.
Assessment Number: 
921
Region: 
Referred under EP Act: 
s38
Industry sector: 
Last updated: 
October 13, 1997
Current Status: 
Ministerial Statement published
Ministerial Statement published
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info