This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: July 31, 2023
The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. Inquiry under s46 in response to a request to change condition 3 - Time Limit for Proposal Implementation of Ministerial Statement 891 . This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...Last updated: July 31, 2023
The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...Last updated: July 31, 2023
The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. Inquiry under s46 regarding amending the conditions of Ministerial Statement 858 . This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...Last updated: January 24, 2022
Perdaman Chemicals and Fertilisers Pty Ltd intends to construct and operate a urea plant with a production capacity of approximately 2 million tonnes per annum (Mtpa) on Sites C and F within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula. Both sites are located adjacent to the Murujuga National Park. The EPA considered the Study of the Cumulative Impacts of Air Emissions in the Murujuga Airshed in its assessment of the Perdaman Urea Project. Read more...Last updated: August 12, 2020
The proposal is for dredging of not more than 3,500,000 cubic metres off Anderson Point, for a third ship berth; disposal of dredge spoil on preexisting and previously approved land at Anderson Point; and extension of the approved open-pile wharf. Read more...Last updated: June 18, 2020
Inquiry under s46 into changing the conditions (extension of time limit for proposal implementation) of Ministerial Statements 469, 774, 815 and 927. Read more...Last updated: June 11, 2018
The proposal is for the construction and operation of a technical ammonium nitrate production facility (TANPF) on Site D within the King Bay/Hearson Cove Industrial Estate on the Burrup Peninsula. The proposal is located approximately 13 kilometres north-west of Karratha. Read more...Last updated: December 21, 2016
Note: In the matter of The Wilderness Society of WA (Inc) –v- Minister for Environment [2013] WASC, the Supreme Court of Western Australia found the Minister’s agreement decision invalid because the EPA’s decision to report was invalid., The proposal is a strategic environmental assessment for a common user LNG hub precinct for future Browse Basin gas processing in the Kimberley Region. Read more...Last updated: April 30, 2015
To expand the liquefied natural gas (LNG) production capacity of the existing proposal from 15 million tonnes per annum (Mtpa) to 20 Mtpa (nominal). Read more...Last updated: January 22, 2013
The proposal is for the construction of a deepwater port. Inquiry under s46 regarding changing condition 9 of Ministerial Statement 469 . Read more...Last updated: December 1, 2009
The proposal is to construct a deepwater port to service fully loaded Panamax sized vessels (65 000 DWT) at Oakajee, approximately 23 kilometres north of Geraldton. Three site locations (north, south and central) and two different design options (inshore and off-shore) were considered in developing the proposal. The design option favoured by the proponent is an in-shore port design at the northern sector. The port study area is approximately 23 kilometres north of Geraldton. The port will... Read more...Last updated: November 17, 2004
The Environmental Protection Authority (EPA) has been required by the Minister for the Environment to provide further assessment on the proposal by James Point Pty Ltd (JPPL) to construct and operate a private container and general cargo Port (referred to as the Stage 1 Port) to the north of James Point in Cockburn Sound. See the original assessment here . Read more...Last updated: January 19, 1998
The proposal is to construct and operate a barge loading facility south of Mowbowra Creek in the Shire of Exmouth for the export of limestone proposed to be mined from the nearby Whitecrest Limestone Mine. The proponent has indicated that a future proposal to develop a larger shipping facility, including a dredged shipping approach, is envisaged. Such a proposal is not considered as part of this assessment, and will require further environmental impact assessment at a later stage should the... Read more...