This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 23, 2020
Atlas Iron Pty. Ltd (the proponent) propose to develop the Miralga Creek DSO Project (the proposal), an iron ore project located in the Pilbara region of Western Australia. The proposal includes the development of five open pits using conventional drill and blast, load and haul methods. 8 million tonnes of iron ore will be mined above the watertable over an approximate timeframe of four to five years. Associated infrastructure will include waste rock dumps. Existing borefield and accommodation... Read more...Last updated: November 9, 2020
NW Interconnected Power Pty Ltd (the Proponent) is seeking to revise its approved proposal to develop the Asian Renewable Energy Hub. The proposal was previously referred under section 38 of the Environmental Protection Act 1986 (EP Act), assessed by the Environmental Protection Authority (EPA) at the level of Public Environmental Review (PER) (NW Interconnected Power 2019), and subsequently approved by the Western Australian Minister for Environment in October 2020. This referral is for ... Read more...Last updated: September 30, 2020
Proposal to mine iron ore from the Stage 2 project area on the southern slopes of the Chichester Range and develop a remote borefield and pipeline by Roy Hill Iron Ore Pty Ltd (RHIO). Read more...Last updated: July 23, 2020
Change to condition 3 to extend the authorised timeframe for substantial commencement of the proposal by five years, to 12 February 2024. Read more...Last updated: July 9, 2020
Change to Condition 3. Extension to Time Limit for Proposal Implementation. Read more...Last updated: July 9, 2020
Robe River Mining Co. Pty Limited (the proponent) proposes to develop the Mesa H deposit to sustain its iron ore production operations within the Robe Valley, Pilbara. The proposal is located approximately 16 km south west of Pannawonica. The proposal would include a total disturbance of 2,200 hectares to develop above and below water table open cut iron ore pits and associated infrastructure, including water management infrastructure. The proposal is located adjacent to the existing Mesa J... Read more...Last updated: June 3, 2020
Reward Minerals propose to develop the Lake Disappointment Potash Project (located approximately 320 km east of Newman). The proposal is to abstract brine from sediments and use solar evaporation ponds on the surface of the lake to create the potash product. The proposal would disturb 7,250 ha of land which includes 437 ha of vegetation, with the remainder of disturbance to the surface of Lake Disappointment. Read more...Last updated: May 27, 2020
Changes to conditions 3-1 and 3-2, time limit of authorisation of Ministerial Statement 985 in order to extend the Time Limit of Authorisation. Read more...Last updated: May 18, 2020
Change to condition 3 - Time limit for Proposal Implementation. Extension of time limit of 5 years to 15 June 2025, allowing time for project financing. Read more...Last updated: May 11, 2020
Consolidated Minerals Pty Ltd the proponent) propose to develop the Woodie Continued Operations Project. The proposal is an expansion of the existing Woodie Woodie Manganese Mine operations (Pilbara Manganese Pty Ltd, a wholly owned subsidiary of Consolidated Minerals Pty Ltd) which is not subject to a Ministerial Statement issued under Part IV of the Environmental Protection Act 1986 (EP Act). The proposal is located approximately 100 km east of Marble Bar and Nullagine and 400 km south east... Read more...Last updated: April 28, 2020
To develop and operate an iron ore mine, processing facilities and supporting infrastructure, 45 km south-south-east of Pannawonica in the Shire of Ashburton, and a 176 km haul road from the mine site to the customer delivery point near Cape Preston. Read more...Last updated: April 6, 2020
Hamersley Iron Pty Limited propose to expand its existing Brockman 4 Syncline Iron Ore Mine. The expansion would include further clearing of up to 4,800 hectares and expand its current development envelope by 2,567 hectares. Additional dewatering would also take place resulting in dewater discharge extending further along Boolgeeda Creek by nine kilometres. Read more...Last updated: April 3, 2020
The construction of facilities for the development of the Greater Gorgon Gas Fields on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on Barrow Island. Read more...Last updated: March 17, 2020
Changes to conditions 3-1 and 3-2 in order to extend the Time Limit for Proposal Implementation. Read more...Last updated: March 17, 2020
The Jimblebar Optimisation Project is a revision of the existing Jimblebar Iron Ore Mine approved under Ministerial Statements 683, 809 and 857. The Revised Proposal is for mining operations at Jimblebar, located approximately 40 km east of the town of Newman. Mining of iron ore deposits will be undertaken above and below the water table. Mining operations will include open pits, overburden storage areas and the construction and operation of associated mine, processing and rail infrastructure.... Read more...Last updated: March 12, 2020
Atlas Iron Pty. Ltd (the proponent) propose to develop the Corunna Downs Project (the proposal), an iron ore project located in the Pilbara region of Western Australia. The proposal includes the development of five open pits using conventional drill and blast, load and haul methods. 23.3 million tonnes of iron ore will be mined above the watertable over an approximate timeframe of 6 years. Associated infrastructure will include waste rock dumps, a mine operation centre, borefield and... Read more...Last updated: January 15, 2020
The proposal is to revise the Mining Area C operation (located approximately 90km WNW of Newman) to include a new satellite ore body which is located approximately 8 km to the south of the existing approved Mining Area C operations. The revised proposal would require the additional clearing of approximately 19,850 hectares of vegetation and mining below the water table. Read more...