This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: August 6, 2003
The proposal is for a poultry litter fired power station at a site approximately 70 kilometres north of Perth on the Brand Highway near Muchea. The power station would receive poultry litter from farms across the broad Perth region. Delivery would be by covered trucks, which would enter the enclosed litter reception shed and tip onto a concrete floor. A front-end loader would be used to place the litter on to a conveyor which would place it on the stockpile. The trucks would be washed down... Read more...Last updated: August 21, 2002
The proposal is to build a transmission line with a maximum capacity of 330 kV from the Pinjar gas turbine station to the Cataby substation. The transmission line, which is primarily lattice tower construction up to 60 m high, traverses State Forest 65 South (Gnangara Park), Bush Forever Site 380, Gingin Stock Route Nature Reserve, State Forest 65 North and private property. The proposed line route is approximately 123 km long and involves the permanent clearing of up to approximately 2.9 ha of... Read more...Last updated: November 14, 2001
The proposal involves the construction and operation of a road/rail corridor, and associated infrastructure, to provide direct access to the Port of Geraldton from the Geraldton-Mt Magnet Road, Walkaway Road and North West Coastal Highway. The implementation of this proposal would allow removal of the current rail line along the city foreshore, allowing redevelopment of this area, and remove existing social and environmental effects associated with this rail line alignment through Geraldton and... Read more...Last updated: April 9, 1996
The proponent, Tiwest Joint Venture (Tiwest), seeks an amendment to the environmental conditions of Ministerial Statement 59 under Section 46 of the, Environmental Protection Act 1986, , to allow the synthetic rutile plant at Chandala an increase in nameplate production from 130,000 to 200,000 tonnes per annum (tpa) of synthetic rutile. The plant was originally assessed by the Environmental Protection Authority (EPA) in December 1988 and was approved by the Minister for the Environment to build... Read more...Last updated: November 1, 1991
Proposal to establish a cereal straw and waste paper pulp and paper mill near Moora in the Central Midlands district of Western Australia. Read more...