This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: April 19, 2024
The Water Corporation submitted a proposal 'Burrup Peninsula Desalinated Water and Seawater Supplies Project' in May 2001 (Water Corporation, 2001a) to service the requirements of new industrial developments on the Burrup Peninsula. The proposed scheme was designed to supply seawater and desalinated water to the Syntroleum Sweetwater Corporation (Syntroleum) gas to liquids plant, with additional capacity to supply one or possibly two other process plants. The EPA released its report (... Read more...Last updated: April 17, 2024
The Western Australian Water Corporation is proposing to construct the Alkimos Seawater Desalination Plant (ASDP) as part of Perth’s Integrated Water Supply Scheme which aims to provide additional sources of drinking water to supplement the existing metropolitan water supply. The ASDP Proposal will be located within the Alkimos Water Precinct (Lot 1050 Marmion Avenue), approximately 40 km north of the Perth, within the northwest corridor, north of Quinns Rock beach and south of Yanchep beach.... Read more...Last updated: April 2, 2024
The Proposal is to construct and operate a new multimodal port in the Kwinana Industrial Area (KIA), approximately 30 km south of Perth. The Proposal includes: A port facility. Adjacent areas of landside development. An offshore breakwater. Dredging for a second main channel. Dredging for access channels, turning basins and berthing areas. Use of dredge material for beneficial re-use and, where required, placement in approved marine placement areas. Removal of the disused Kwinana Bulk Berth 1 (... Read more...Last updated: March 25, 2024
The South West Development Commission is proposing an upgrade to the marine structures that are intended to meet existing demand and future requirements for small craft maritime infrastructure and include new mooring facilities for commercial and recreational vessels, floating jetties, a boat servicing facility, improved public ablution facilities and up upgraded boat launching and storage facilities. Read more...Last updated: March 7, 2024
The proposal is to expand CSBP's Kwinana Ammonium Nitrate Production Facility (ANPF) by incorporating additional components into the existing facility and re-engineering (debottlenecking) some existing components in order to increase ammonium nitrate production capacity from 520,000 tpa to 936,000 tpa. Read more...Last updated: November 6, 2023
The proposal is for a desalination plant located approximately five kilometres (km) west of Cape Riche, and approximately 19 km from the nearest town of Wellstead. The desalination plant would be based on reverse osmosis technology. A seawater intake and pump station would be located 500 m east of Cheyne Inlet, and a brine outfall would be located on the south side of Cape Riche. Pipelines and infrastructure would be also constructed. Read more...Last updated: September 27, 2023
The proposal is to develop and operate a general cargo facility within the Port Hedland inner harbour, within the Town of Port Hedland. Read more...Last updated: July 31, 2023
The proposal will provide additional port facilities at Port Hedland to receive and stockpile the product from emerging miners, specifically the various mines owned by the proponent’s shareholders, and load this product onto ships for export. Each of the shareholders is exploring and developing new iron ore projects in the Pilbara, with one company actively mining ore and exporting through the existing facilities in the Port of Port Hedland. The current shareholders of the proponent are Atlas... Read more...Last updated: July 31, 2023
The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. Inquiry under s46 in response to a request to change condition 3 - Time Limit for Proposal Implementation of Ministerial Statement 891 . This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...Last updated: July 31, 2023
The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. Inquiry under s46 regarding amending the conditions of Ministerial Statement 858 . This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...Last updated: July 3, 2023
The Proposal is located in the Pilbara region of Western Australia within a development envelope of 20,821 ha and clearing no more than 1,564 ha. Onslow Infraco Pty Ltd (herein MRL a wholly owned subsidiary of Mineral Resources Limited) is proposing to develop: • A fully sealed private haul road, approximately 125km in length • Gas pipeline and ancillary haul road infrastructure. • Storage and bulk handling of ore at the Port of Ashburton. • Dredging a dedicated berthing pocket adjacent to the... Read more...Last updated: May 29, 2023
Time limit for substantial commencement, review of the adequacy of existing implementation conditions to ensure consistency with the EPA’s current objectives for each environmental factor. Read more...Last updated: April 11, 2023
The proponent (Hamersley Iron Pty Limited) proposes to build and develop a desalination plant at Parker Point, Dampier, located approximately 2.5km north-east of the Dampier township. This Proposal will establish a reliable potable water supply for the Proponent’s Dampier port operation (including Parker Point and East Intercourse Island), Dampier town and connection into Water Corporation’s West Pilbara Water Supply Scheme (WPWSS). The desalination plant may be delivered in stages up to a... Read more...Last updated: July 21, 2022
Change to condition 3 – Time Limit for Proposal Implementation. Extension of time limit of five years to 18 November 2025. Read more...Last updated: July 1, 2022
The proposal is to construct and operate an iron ore export facility at Balla Balla midway between Port Hedland and Karratha, northwest of Whim Creek in the Pilbara region of WA. Read more...Last updated: February 2, 2022
The requested changes relate to condition 3 of Statement 1041 (as relevant to Statement 826) for an extension to the Time Limit of Authorisation for Proposal Implementation. Read more...Last updated: January 25, 2022
Dredging of approximately 3,900,000 cubic metres of material for two new berth pockets and extensions to the existing departure channel and swing basin at Harriet Point and Stanley Point; disposal of dredged material at dredged material management areas. Read more...Last updated: September 1, 2021
The proposal is for the construction and operation of a gas processing plant, onshore supply gas pipeline, onshore sales gas pipeline, and horizontal directionally drilled shore crossing. Read more...Last updated: May 25, 2021
The proposal is to construct industrial infrastructure and a Southern Harbour in Jervoise Bay south of the Northern Harbour precinct and including the Marine support facility. Read more...Last updated: August 6, 2020
Change to Extension of Timeframe for substantial commencement. Read more...