This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: October 24, 2013
The proposal is to develop an iron ore mine and associated infrastructure in the Goldfields region, 450 kilometres (km) east-north-east of Perth. The proposal includes a borefield and adjoining water pipeline 60km west of the mine site and a rail siding 130km east of the mine site and 8km south of Menzies. Read more...Last updated: June 12, 2013
Inquiry under s46 - request to to amend Ministerial Statement 830 to contemporise and rationalise existing conditions. Read more...Last updated: January 30, 2013
The proposal is to construct and operate a multi-user deep-water port with iron ore stockpiling, transfer and ship loading facilities and ancillary infrastructure at Anketell Point. The proposal allows for facilities required by the Proponent and future third parties to be developed. Read more...Last updated: January 11, 2013
Brockman Iron Pty Ltd is proposing to construct a railway line and associated infrastructure in the Hamersley Iron province in the Pilbara region of Western Australia, approximately 100 kilometres (km) north west of Newman. The railway line would be approximately 79 km in length. The proposal will connect the previously approved Brockman Marillana Iron Ore Project ( Ministerial Statement 855 ) to the existing Fortescue Metals Group (FMG) railway line. Read more...Last updated: January 11, 2013
The referral received by the EPA is for the construction and operation of the stadium. The EPA considers that the main environmental issues are associated with the pre-construction site works, which will stabilise and prepare parts of the site before the main construction phase. The site was previously used as a landfill facility and has been classified as "possibly contaminated - investigation required" under the Contaminated Sites Act 2003. Preconstruction site works will... Read more...Last updated: January 11, 2013
The proposal is to develop and operate an iron ore mine on the Blacksmith tenement located approximately 70 km north-west of Tom Price in the Pilbara region of Western Australia. Read more...Last updated: August 1, 2012
The proposal is for the construction of an onshore marina (and associated boating infrastructure e.g. boat pens, jetties, navigational aids, entrance channel, protective groynes, public boat ramps and car parks) on the western side of the Point Grey peninsula. The proposal also includes the construction of a 2.5 kilometre navigation channel across the Harvey Estuary from the marina to the Dawesville Channel. Read more...Last updated: April 4, 2012
The proposal is to increase the throughput of iron ore to 85 million tonnes per annum at the Cape Lambert Port operations. Read more...Last updated: March 28, 2012
The original proposal, as set out in the proponent’s PER, comprised four iron ore mines in the Pilbara region, an ore beneficiation plant, a borefield, an accommodation village and 160km of east-west railway connecting to the north-south link to Port Hedland. Since release of the PER, FMG has made several major modifications to the proposal: the proposed mines at Mt Lewin and Mt Nicholas have been excised; the connecting infrastructure to those minesites is not now needed, leading to a change... Read more...Last updated: November 22, 2011
The proposal involves the construction and operation of an open pit magnetite mine located approximately 90 kilometres east-north-east of Albany, and pipelines for ore slurry transport and return water, connecting the mine site and new port loading facilities in the Port of Albany. Read more...Last updated: August 5, 2011
The proposal is to construct and operate a number of looping sections adjacent (and connected) to the existing underground gas transmission pipeline within the DBNGP corridor. There are eleven separate looping sections proposed from south of Dampier to Wagerup West. Read more...Last updated: August 1, 2011
The proposal is to increase the mine dewatering rate up to 50 Gigalitres per annum and to inject surplus water into two brackish and one saline injection zones at the Christmas Creek Mine. Read more...Last updated: March 14, 2011
Oakajee Rail Development is a component of the larger Oakajee Port and Rail Development. The proposed heavy haulage railway and the associated facilities covered in this proposal include 570 kilometres (km) of railway and associated rail infrastructure extending in a north-easterly direction from the North West Coastal Highway (NWCH) approximately 1.5km south of Olsen Road at Oakajee, approximately 24km north of Geraldton, to the Jack Hills mining operations located approximately 500km to the... Read more...Last updated: March 14, 2011
The proposal is to construct and operate iron ore handling and storage facilities and ancillary infrastructure required to develop and operate a 45 million tonne per annum iron ore export facility at Oakajee, 24km north of Geraldton. Read more...Last updated: March 11, 2011
The proposal is to mine hematite and magnetite iron ore from the Blue Hills North and Terapod deposits, and construction of associated mine infrastructure, upgraded access road to Morawa, Tilley Siding, and powerline corridor in the Midwest region of Western Australia. Read more...Last updated: March 10, 2011
The proposal is to develop a wellfield on the Blackwood Plateau near Jarrahwood and to supply the groundwater from the South West Yarragadee aquifers into the Integrated Water Supply Scheme (IWSS). The proposed wellfield would comprise five well sites with two wells at each site drawing from the Yarragadee Formation Unit 1 and Unit 3 aquifers, approximately 400m and 700m respectively from the surface (termed the eastern split wellfield), providing a maximum of 45 GL/yr into the IWSS through a... Read more...Last updated: January 20, 2011
The proposal is for the construction and operation of two nominal 229 Megawatt (208 Megawatt net sent-out) subcritical coal-fired base-load generation plants (i.e. Bluewaters Power Station Phases III and IV) on a site adjacent to the existing Bluewaters Phase I and Phase II generating plants located approximately 4.5 kilometres north-east of Collie. The proposal also involves the construction and operation of an approximately 63 kilometre long wastewater discharge pipeline following the same... Read more...Last updated: November 4, 2010
Identification of potential corridors and areas for future installation of water and waste water pipelines and associated infrastructure throughout the southern suburbs of Perth. Read more...Last updated: December 4, 2009
The management and abstraction of groundwater for public and private water supply from the Gnangara Mound, with provision for environmental water requirements In response to the Minister for Environment’s request to review the environmental monitoring sites in light of changes in environmental values and the predicted influence of climate variability the DoW has proposed to remove some criteria sites from the current environmental approval and to rationalise other conditions and commitments of... Read more...Last updated: October 11, 2009
The proposal is to extend Roe Highway from South Street in Canning Vale to connect to Kwinana Freeway in Leeming over a distance of approximately 4.5 km. The highway is planned as a four-lane dual carriageway (two lanes in each direction), with provision for future upgrading to three lanes in each direction. The land required for any future upgrading will be provided in the median strip. The total footprint of the project area represents 62 hectares (ha). Approximately 53.9 ha of this area will... Read more...