This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 6, 1997
The proposal includes the following key features: construction and operation of a metallurgical limestone mine; production of quicklime at a quicklime plant to be located at the mine; road transportation of limestone and quicklime through Exmouth; and shipping of limestone and quicklime from the Point Murat jetty. Read more...Last updated: October 13, 1997
The proposal is to extend the Exmouth water supply borefield, and includes: extending the existing borefield, to the west (equipping existing bores) and to the south (drilling and equipping new bores); increasing the long term supply capacity from approximately 760 million litres per year (ML!yr) to 1,025ML!yr; constructing four dedicated stygofauna monitoring bores (two within the proposed borefield extension and two to the south of Shothole Canyon Road, which has been identified as future... Read more...Last updated: July 23, 1997
The proposed Coral Coast Resort is proposed to be constructed in 4 Stages over a 20 year period. Stage 1 is proposed to be scheduled over 5 years and includes the following components: 'club resort' ( 400 rooms); caravan park (175 bays, 75 chalets); back packer hostel (60 beds); serviced apartments/townhouses (80 units); Visitor Centre, to be run by the Department of Conservation and Land Management; a Town Centre, including shopping plaza, retail outlets, tavern, parking facilities,... Read more...Last updated: July 15, 1997
Main Roads of Western Australia has proposed to build further portions of the Roe Highway from Welshpool Road, Beckenham to South Street, Canning Vale. Main Roads has indicated that Roe Highway will provide access to areas of manufacturing concentration and access to the termini of National Highways, airports, ports, freight forwarding centres and major rail heads. In summary, Roe Highway along with Reid and Tonkin Highways, will join other arterial roads to provide easy access to these... Read more...Last updated: April 24, 1997
The proposal is to extend the existing breakwater in the northern precinct of Jervoise Bay. In summary, the breakwater extension will: commence immediately west of the Cockburn Power Boat Association facility, be 700 metres (m) long, approximately 40m wide, and cover 2.8 hectares (ha) of seabed; be constructed of limestone rubble mound, as used in the existing breakwater and has an expected construction period of 40 weeks; and form a harbour with an entrance width of 120m at mean sea level. Read more...Last updated: March 14, 1997
Main Roads Western Australia proposes to reconstruct the existing two lanes into a four lane carriageway at the Bedfordale Hill section of Albany Highway between the end of the existing dual carriageway and the road train assembly area in the City of Armadale. The earthworks for the proposed carriageway encroach onto Bungendore Park which is part of System 6 Recommendation MSO - Darling Scarp. The proposal also involves the deviation of Neerigen Brook in two locations. Read more...