This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 7, 2016
The proposal is to construct and operate a single entrance onshore marina to accommodate up to 500 boat pens and moorings and a surrounding land development comprising tourism, commercial, public open space and residential land uses. Read more...Last updated: December 6, 2016
The proposal is to construct and operate a coal handling and export facility within the Bunbury Port Inner Harbour in the south-west region of Western Australia. Read more...Last updated: November 22, 2016
The Bunbury Port Authority has prepared this plan to guide future development and decision making within the Inner Harbour and to conform to the strategic planning requirements under the, Port Authorities Act 1999, . It will also provide greater certainty of land use and development for port users, the Bunbury Port Authority and other decision making authorities, neighbouring landowners and the community. Read more...Last updated: May 1, 2015
The proposal is for the construction and operation of two nominal 229 Megawatt (208 Megawatt net sent-out) subcritical coal-fired base-load generation plants (i.e. Bluewaters Power Station Phases III and IV) on a site adjacent to the existing Bluewaters Phase I and Phase II generating plants located approximately 4.5 kilometres north-east of Collie. The proposal is further documented in Ministerial Statement 837 and EPA Report 1349 . This assessment deals with a request for a change to the Time... Read more...Last updated: February 12, 2014
Proposal by Ocean Dunes Pty Ltd to develop a recreational resort complex incorporating an 18 hole dune links type golf course of international competition standard, marina and beach resort and a residential estate on a 245 ha coastal site at Eglinton, some 45 mins north of the Perth Central Business District. Read more...Last updated: February 6, 2014
The proposal has the following main components: a 345 km railway line from Port Hedland to proposed mining operations at Mindy Mindy. This railway will be constructed in two parts: Part 1 from Port Hedland to the Chichester Ranges and Part 2 from the Chichester Ranges to Mindy Mindy; construction of port facilities consisting of rail loop, car dumper, stockyard and ore handling facilities (including two stackers and a single reclaimer), rescreening facility and product conveyor out to a wharf... Read more...Last updated: June 26, 2013
Chevron Australia Pty Ltd, as operator for the Gorgon Joint Venturers, proposes to extract, pipe, liquefy and export 10 million tonnes per annum of natural gas from the Greater Gorgon and Jansz gas fields using facilities offshore and on Barrow Island, Western Australia. Read more...Last updated: January 30, 2013
The proposal is to construct and operate a multi-user deep-water port with iron ore stockpiling, transfer and ship loading facilities and ancillary infrastructure at Anketell Point. The proposal allows for facilities required by the Proponent and future third parties to be developed. Read more...Last updated: January 22, 2013
The proposal is for the construction of a deepwater port. Inquiry under s46 regarding changing condition 9 of Ministerial Statement 469 . Read more...Last updated: July 19, 2012
The proposal is for a desalination plant located approximately five kilometres (km) west of Cape Riche, and approximately 19 km from the nearest town of Wellstead. The desalination plant would be based on reverse osmosis technology. A seawater intake and pump station would be located 500 m east of Cheyne Inlet, and a brine outfall would be located on the south side of Cape Riche. Pipelines and infrastructure would be also constructed. Read more...Last updated: February 28, 2012
The proposal is to construct and operate the Outer Harbour Development which includes landside and marine infrastructure for the handling and export of iron ore from BHPBIO’s operations. The Boodarie stockyard infrastructure will supply an overland conveyor to a transfer pad located to the west of the existing Finucane Island facilities. A piled jetty will transfer ore material to the ship loaders located at the piled wharf. Read more...Last updated: June 30, 2011
The proposal is to expand existing wharf facilities to increase storage capacity and improve the efficiency of Dampier's port in general. The expansion involves the construction of a land-backed wharf, 300m jetty, lay down areas, access road and associated infrastructure. The wharf and lay down area would be constructed using reclaimed material from the dredging required to improve the approach and berthing channels. Read more...Last updated: March 14, 2011
The proposal is to construct and operate iron ore handling and storage facilities and ancillary infrastructure required to develop and operate a 45 million tonne per annum iron ore export facility at Oakajee, 24km north of Geraldton. Read more...Last updated: January 20, 2011
The proposal is for the construction and operation of two nominal 229 Megawatt (208 Megawatt net sent-out) subcritical coal-fired base-load generation plants (i.e. Bluewaters Power Station Phases III and IV) on a site adjacent to the existing Bluewaters Phase I and Phase II generating plants located approximately 4.5 kilometres north-east of Collie. The proposal also involves the construction and operation of an approximately 63 kilometre long wastewater discharge pipeline following the same... Read more...Last updated: August 6, 2010
The Water Corporation submitted a proposal 'Burrup Peninsula Desalinated Water and Seawater Supplies Project' in May 2001 (Water Corporation, 2001a) to service the requirements of new industrial developments on the Burrup Peninsula. The proposed scheme was designed to supply seawater and desalinated water to the Syntroleum Sweetwater Corporation (Syntroleum) gas to liquids plant, with additional capacity to supply one or possibly two other process plants. The EPA released its report (... Read more...Last updated: June 30, 2010
The proposal is to construct and operate a minimum 50 GL/annum and up to 100 GL/annum desalination plant on Lots 32 and 33, and Part Lot 8 Taranto Road, Binningup; marine inlet/outlet pipes; and a water supply pipeline to transport potable water to the Integrated Water Supply Scheme via a storage facility near Harvey. Read more...Last updated: February 9, 2010
Straits Salt proposes to construct and operate a 4.2 million tonne per annum solar salt farm on the east coast of Exmouth Gulf. Read more...Last updated: December 1, 2009
The proposal is to construct a deepwater port to service fully loaded Panamax sized vessels (65 000 DWT) at Oakajee, approximately 23 kilometres north of Geraldton. Three site locations (north, south and central) and two different design options (inshore and off-shore) were considered in developing the proposal. The design option favoured by the proponent is an in-shore port design at the northern sector. The port study area is approximately 23 kilometres north of Geraldton. The port will... Read more...Last updated: November 13, 2007
This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment on the environmental factors and principles relevant to the proposal by the Water Corporation to construct, operate and maintain a new Wastewater Treatment Plant (WWTP) and ocean outfall at Alkimos. The proposal is to develop the plant in stages up to an operational capacity of 160ML/day beyond 2050. There are two proposed sites for the WWTP, Site A and Site B... Read more...Last updated: December 22, 2004
Roc Oil (WA) Limited proposes to develop the Cliff Head Oil Field located approximately 20 kilometres (km) south of Dongara. Read more...