Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Infrastructure (12) Apply Infrastructure filter
  • Mineral sands (7) Apply Mineral sands filter
  • Power generation (5) Apply Power generation filter
  • Sand, rock, gravel and clay (4) Apply Sand, rock, gravel and clay filter
  • Industrial (3) Apply Industrial filter
  • Land use (3) Apply Land use filter
  • Waste management (2) Apply Waste management filter
  • Clearing (1) Apply Clearing filter
  • Coal (1) Apply Coal filter
  • Gold (1) Apply Gold filter

Filter by current status:

  • Ministerial Statement published (24) Apply Ministerial Statement published filter
  • Minister determined that the proposal should not be implemented (4) Apply Minister determined that the proposal should not be implemented filter
  • Decision on whether to assess has been published (3) Apply Decision on whether to assess has been published filter
  • Awaiting Ministerial decision (1) Apply Awaiting Ministerial decision filter
  • EPA Report and Recommendations released - appeals closed (1) Apply EPA Report and Recommendations released - appeals closed filter
  • Ministerial Statement withdrawn under s.47A (1) Apply Ministerial Statement withdrawn under s.47A filter
  • Proposal withdrawn (1) Apply Proposal withdrawn filter
  • Public Environmental Review document in preparation (1) Apply Public Environmental Review document in preparation filter
  • Public Environmental Review period closed (1) Apply Public Environmental Review period closed filter

Filter by preliminary environmental factors:

  • (-) Remove Hydrological Processes filter Hydrological Processes
  • Inland Waters Environmental Quality (29) Apply Inland Waters Environmental Quality filter
  • Flora and Vegetation (27) Apply Flora and Vegetation filter
  • Social Surroundings (19) Apply Social Surroundings filter
  • Terrestrial Environmental Quality (16) Apply Terrestrial Environmental Quality filter
  • 37 (13) Apply 37 filter
  • Terrestrial Fauna (13) Apply Terrestrial Fauna filter
  • Marine Environmental Quality (6) Apply Marine Environmental Quality filter
  • Marine Fauna (3) Apply Marine Fauna filter
  • Human Health (2) Apply Human Health filter
  • Water (2) Apply Water filter
  • Benthic Communities and Habitats (1) Apply Benthic Communities and Habitats filter
  • Landforms (1) Apply Landforms filter
  • People (1) Apply People filter

Filter by Proponent:

  • Water Corporation (6) Apply Water Corporation filter
  • Cable Sands (WA) Pty Ltd (2) Apply Cable Sands (WA) Pty Ltd filter
  • Doral Mineral Sands Pty Ltd (2) Apply Doral Mineral Sands Pty Ltd filter
  • Griffin Power Pty Ltd (2) Apply Griffin Power Pty Ltd filter
  • Main Roads Western Australia (2) Apply Main Roads Western Australia filter
  • Worsley Alumina Pty Ltd (2) Apply Worsley Alumina Pty Ltd filter
  • A D Contractors Pty Ltd (1) Apply A D Contractors Pty Ltd filter
  • Albemarle Lithium Pty Ltd (1) Apply Albemarle Lithium Pty Ltd filter
  • Alcoa World Alumina Australia (1) Apply Alcoa World Alumina Australia filter
  • BEMAX Resources Limited (1) Apply BEMAX Resources Limited filter
  • BHP Titanium Minerals (1) Apply BHP Titanium Minerals filter
  • Bluewaters Power 3 Pty Ltd (1) Apply Bluewaters Power 3 Pty Ltd filter
  • BMP Holdings Pty Ltd (1) Apply BMP Holdings Pty Ltd filter
  • Bunbury Port Authority (1) Apply Bunbury Port Authority filter
  • Canal Rocks Pty Ltd (1) Apply Canal Rocks Pty Ltd filter
  • City of Busselton (1) Apply City of Busselton filter
  • Conservation Commission of Western Australia (1) Apply Conservation Commission of Western Australia filter
  • Cristal Australia Pty Ltd (1) Apply Cristal Australia Pty Ltd filter
  • Cristal Pigment Australia Ltd (1) Apply Cristal Pigment Australia Ltd filter
  • Doyles Lime Services Pty Ltd (1) Apply Doyles Lime Services Pty Ltd filter
  • Griffin Electricity Pty Ltd (1) Apply Griffin Electricity Pty Ltd filter
  • Griffin Power 3 Pty Ltd (1) Apply Griffin Power 3 Pty Ltd filter
  • Iluka Resources Limited (1) Apply Iluka Resources Limited filter
  • Kemerton Silica Sand Pty Ltd (1) Apply Kemerton Silica Sand Pty Ltd filter
  • Lanco Resources Australia Pty Ltd (1) Apply Lanco Resources Australia Pty Ltd filter
  • Lure Holdings Pty Ltd (1) Apply Lure Holdings Pty Ltd filter
  • Perth International Motorsports Management (1) Apply Perth International Motorsports Management filter
  • Transfield Services Kemerton Pty Limited (1) Apply Transfield Services Kemerton Pty Limited filter
  • Vasse Coal Management Pty Ltd (1) Apply Vasse Coal Management Pty Ltd filter
  • Wesfarmers Energy Limited (1) Apply Wesfarmers Energy Limited filter

Filter by region:

  • (-) Remove South West filter South West
  • Peel (1) Apply Peel filter

Filter by last updated:

  • 2024 (2) Apply 2024 filter
  • 2023 (1) Apply 2023 filter
  • 2022 (1) Apply 2022 filter
  • 2021 (2) Apply 2021 filter
  • 2019 (1) Apply 2019 filter
  • 2018 (3) Apply 2018 filter
  • 2017 (1) Apply 2017 filter
  • 2016 (4) Apply 2016 filter
  • 2015 (2) Apply 2015 filter
  • 2014 (4) Apply 2014 filter
  • 2013 (2) Apply 2013 filter
  • 2012 (1) Apply 2012 filter
  • 2011 (3) Apply 2011 filter
  • 2010 (1) Apply 2010 filter
  • 2009 (1) Apply 2009 filter
  • 2007 (3) Apply 2007 filter
  • 2005 (2) Apply 2005 filter
  • 2004 (1) Apply 2004 filter
  • 2003 (1) Apply 2003 filter
  • 1997 (1) Apply 1997 filter
  • 1995 (1) Apply 1995 filter
  1. Home
  2. Proposal search
  3. Hydrological Processes
  4. South West

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Albemarle Kemerton Plant

Last updated: November 25, 2024

Albemarle Lithium Pty Ltd (Albemarle) is proposing to stablish the Albemarle Kemerton Plant, a Lithium hydroxide Product manufacturing plant and associated infrastructure, within the Kemerton Strategic Industrial Area (KSIA), approximately 17 kilometres north-east of Bunbury. The Albemarle Kemerton Plant will produce up to 100,000 tonne per annum (tpa) of lithium hydroxide monohydrate (Lithium Hydroxide Product) from five 20,000 tpa process trains and produce up to 1,100,000 tpa of tailings.... Read more...

Western Extension to the Dardanup Mineral Sands Project to include the Burekup Mineral Sands Deposit

Last updated: June 28, 2024

The proposal is to extend the existing Dardanup Mine to allow mining of the Burekup Mineral Sands Deposit located approximately 20 kilometres east of Bunbury, Western Australia. Mining is to depths up to 14 metres below ground level and will require dewatering. Read more...

Worsley Alumina - Efficiency and Growth Increase of Existing Operations to 4.4Mtpa Alumina Production

Last updated: May 16, 2023

Worsley Alumina Pty Ltd (Worsley) proposes to upgrade the Worsley refinery in order to increase production to 4.4 million tonnes per annum (Mtpa). Worsley has approval under Part IV of the, Environmental Protection Act, 1986, for production of 3.7Mtpa, and the refinery currently operates at 3.25Mtpa. Read more...

Limestone and Sand Quarry Lot 1002 Preston Beach

Last updated: April 5, 2022

Doyles Lime Service Pty Ltd proposes limestone and sand excavation approximately 4.5 km north of the Preston Beach townsite, Shire of Waroona. Read more...

Chloride Process Pigment Plant Kemerton and Operations at Australind (S46) [2025]

Last updated: December 6, 2021

Read more...

Yalyalup Mineral Sands Project

Last updated: May 17, 2021

Doral Mineral Sands Pty Ltd is proposing to develop and operate a mineral sands deposit approximately 11 kilometres southeast of Busselton. The proposal includes the development of mine pits and associated infrastructure, wet concentration processing plant, solar evaporation ponds, groundwater abstraction and water management infrastructure and process water pond. The proposal would include a total disturbance of 453.34 hectares within a development envelope of 924.8 hectares. The majority of... Read more...

Kemerton wastewater treatment plant and treated wastewater reuse at woodlot

Last updated: October 1, 2019

The proposal is for the works and operation of a wastewater treatment plant (WWTP) and woodlot reuse scheme for the first three years. This will enable monitoring and evaluation to be undertaken to determine a longer term strategy for development and operation of the scheme. The proposed works and operation for the first three years form part of planned Stage 1 of the scheme, which will extend to the year 2010. A further two stages (extending to 2040) are planned for the future. Read more...

Wagerup Alumina Refinery - Increase in Production to 4.7 Mtpa; and Wagerup Cogeneration Plant

Last updated: October 15, 2018

Alcoa proposes to expand the Wagerup Refinery through construction of a third production unit. The proposed production increase to approximately 4.7 Mtpa alumina is to be achieved by a combination of new equipment and upgrade of existing equipment in order to achieve an increase in both capacity and efficiency. As the Wagerup Refinery has been subject to previous assessments, this represents a revised proposal pursuant to s 45B of the EP Act. The current maximum production permitted under the... Read more...

Busselton Eastern Link Project

Last updated: April 9, 2018

City of Busselton proposes to construct a new route into Busselton. The proposal involves the development of a new two-lane road and bridge linking Causeway Road to Cammilleri Street, including a new bridge over the Vasse river. Disturbance associated with the proposal would include construction on the banks of the Vasse River and removal of 0.56 hectares of native vegetation. Read more...

Bluewaters Power Station Phase II

Last updated: April 4, 2018

Griffin Power Pty Ltd, proposes to construct and operate a 200MW coal-fired power station known as the Bluewaters Power Station Phase II (Bluewaters II) adjacent to the proposed Bluewaters Power Station (Bluewaters I) on a site located approximately 4km north-east of Collie. It would be a subcritical coal-fired base-load generation facility with a nominal generating capacity of up to 200MW. The Bluewaters II Power Station would supplement the Bluewaters I Power Station and supply electricity... Read more...

Extension of Kemerton Silica Sand Dredge Mining (s46)

Last updated: November 13, 2017

Read more...

Wonnerup North Mineral Sands Project

Last updated: December 8, 2016

Cristal Australia Pty Ltd proposes the Wonnerup North Mineral Sands Project located approximately 10 kilometres east of Busselton, City of Busselton. The project would involve dry mining and processing of mineral sands ore from the Wonnerup North deposit at a rate of approximately 2.3 million tonnes (Mt) per annum over eight years. Read more...

Vasse Coal Project

Last updated: December 7, 2016

Read more...

Clearing of approximately 22 hectares of native vegetation for agriculture: Collie Agricultural Area Lot 37 Harris Road, Picton

Last updated: December 6, 2016

The proposal is to clear approximately 22 hectares of native vegetation on Collie Agricultural Area Lot 37 Harris Road, Picton. The proposal includes clearing of native vegetation within two wetlands. Read more...

Bunbury Port Inner Harbour Structure Plan

Last updated: November 22, 2016

The Bunbury Port Authority has prepared this plan to guide future development and decision making within the Inner Harbour and to conform to the strategic planning requirements under the, Port Authorities Act 1999, . It will also provide greater certainty of land use and development for port users, the Bunbury Port Authority and other decision making authorities, neighbouring landowners and the community. Read more...

Bluewaters Power Station Expansion - Phase III and Phase IV (s46)

Last updated: May 1, 2015

The proposal is for the construction and operation of two nominal 229 Megawatt (208 Megawatt net sent-out) subcritical coal-fired base-load generation plants (i.e. Bluewaters Power Station Phases III and IV) on a site adjacent to the existing Bluewaters Phase I and Phase II generating plants located approximately 4.5 kilometres north-east of Collie. The proposal is further documented in Ministerial Statement 837 and EPA Report 1349 . This assessment deals with a request for a change to the Time... Read more...

Tutunup South Mineral Sands Project (s46)

Last updated: March 25, 2015

Inquiry under s46 regarding changing the implementation conditions of Ministerial Statement 799 . Read more...

Heavy Mineral Sands Mine, Beenup, Shire of Augusta-Margaret River (s46) [986]

Last updated: August 28, 2014

The proposal is to rehabilitate the Beenup Titanium Minerals Project Area located 17km north-east of Augusta in the Shire of Augusta-Margaret River. The Beenup Rehabilitation Project is located on retained portions of Mining Leases 70/574 and 70/575. Inquiry under s46 to amend Ministerial Statement 140 . Read more...

Bunbury Berth 14A Expansion Project

Last updated: June 18, 2014

The proposal is to construct and operate a coal handling and export facility within the Bunbury Port Inner Harbour in the south-west region of Western Australia. Read more...

Wastewater Treatment Plant Stage 1, Chugg street Walpole, Shire of Manjimup

Last updated: February 7, 2014

The Water Corporation of Western Australia proposes to construct, commission, operate and maintain a new wastewater treatment plant (WWTP) on a portion of the C class Crown reserve No. 29778 (Forestry Purposes) on Chugg Street, north-east of the Walpole townsite. That portion of the reserve is predominantly cleared and used as a depot for the Department of Conservation and Land Management. Read more...

Pages

  • 1
  • 2
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.