This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 26, 2019
The Proposal is located within the Pilbara Interim Biogeographic Regionalisation for Australia (IBRA) region and is located within the Fortescue and Hamersley IBRA subregions. The Approved Project (authorised by Ministerial Statement 933 , 1 February 2013) is an above the water table open cut mine and associated infrastructure, located on mining tenement M470/1439. This proposal is to mine below the water table. Read more...Last updated: November 21, 2019
The Proposal is to construct and operate the Pluto to Northwest Shelf Interconnector, a 3.3 km long, steel buried natural gas pipeline, connecting the Pluto Interconnector Compressor Station to the Karratha Gas Plant which is operated by Woodside on behalf of the North West Shelf Project participants, located on the Burrup Peninsula in the North of Western Australia. The proposal will require the clearing of an estimated 10.69 ha.3.26 ha within the Karratha Gas Plant Lease and Buffer Zone Lease... Read more...Last updated: October 28, 2019
The Commissioner of Main Roads is proposing to upgrade the section of Tonkin Highway between Guildford Road (Bayswater) and the Great Eastern Highway (Belmont). The key components of the project are: construction and operation of two new bridges over the Swan River road widening, reconfiguration, and modification of existing interchanges construction and operation of on/off ramps and collector distributor roads connectivity of the principal shared path to and along Tonkin Highway. The proposal... Read more...Last updated: September 18, 2019
Inquire into and report on the matter of changing implementation condition 5-1: Air Quality in Ministerial Statement 870 for the above proposal to protect rock art. Read more...Last updated: September 2, 2019
Brikmakers (BGC Australia Pty Ltd) propose to extract clay and sand at Lots 5 and 6 (1728) Great Northern Highway, Bullsbrook. The site was historically used for the grazing of cattle. Therefore, the majority of the site has been previously cleared of vegetation. Several stands of native trees are located mostly to the west of Lot 5 and to the north of Lot 6. The proposal would include the clearing of 7 hectares of native vegetation and excavation of up to 26 metres in depth. Read more...Last updated: August 29, 2019
Italia Stone Group proposes to develop a hard rock quarry at Lot 800 Pruden Road Whitby, approximately 3.5 kilometres east of Mundijong in the Shire of Serpentine-Jarrahdale. The proposed quarry is on freehold land and is for the extraction of 50,000 to 100,000 tonnes of hard rock per annum for a period of 20 years. The material will be extracted by drill and blast methods and hauled by truck to a processing area for crushing and stockpiling on site. Read more...Last updated: August 21, 2019
Robe River Mining Co Pty Ltd is seeking to extend the existing Mesa A / Warramboo Iron Ore Mining Project by extending the existing mining operation and developing four new nearby deposits. The proposal is 43 kilometres west of Pannawonica in the Pilbara Region. The proposal would require an additional 3000 hectares of clearing of native vegetation, with some below water table mining. A water supply would also be required and discharge of any excess water to Warramboo Creek. Read more...Last updated: August 14, 2019
Fortescue Metals Group Limited proposes to build a 120 km railway linking their existing Solomon Mine with their proposed Eliwana Iron Ore Mine, located 90 km west-northwest of Tom Price (Shire of Ashburton). The eastern section of the proposed Eliwana Railway Project development envelope is adjacent to Karijini National Park. Proposed Infrastructure within the Rail Development Envelope includes: Railway and associated embankment; Rail loop; Crossing/passing loops; Railway overpass; Train... Read more...Last updated: July 8, 2019
The proposal involves the construction and commissioning of a new tailings storage cell (Cell 12A) for the storage of lithium processing tailings at the Banksia Road Waste Management Facility (Banksia Road WMF) located at Lot 2 on Plan 65861, Crooked Brook in Western Australia (WA). It is proposed that Cell 12A will have the capacity to contain approximately 522,000 tonnes of tailings. Read more...Last updated: July 1, 2019
The construction of facilities for the development of the Pluto Gas Field on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on the Burrup Peninsula. Extensive dredging will be undertaken adjacent to the export facility. Read more...Last updated: June 24, 2019
Salt Lake Potash proposes to develop the Lake Way SOP Demonstration Plant. The proposal is ocated in and around Lake Way, approximately 25 kilometres south of Wiluna. The proposal will extract and evaporate natural brines to produce up to 50,000 tonnes per year of Sulphate of Potash (SOP). The activities and infrastructure include: On-playa infrastructure – brine extraction trenches; pond infrastructure; and associated pipework. Off-playa infrastructure – processing plant, process water... Read more...Last updated: May 23, 2019
Inquiry under s46 into the request for a number of substantial changes to the Ravensthorpe Nickel Project, located approximately 35 km east of Ravensthorpe, the subject of Ministerial Statement 509 . In summary, the proposed changes include: mining of additional ore reserves contained within the Shoemaker-Levy and Hale-Bopp deposits and a resulting increase in clearing within the Bandalup Corridor; changes to the processing of ore and the final product: a) deletion of nickel electrowinning,... Read more...Last updated: May 15, 2019
Subsea 7 proposes to construct and operate an onshore pipeline fabrication facility at Lots 233 and 1586 to the east of Minilya-Exmouth Road, Learmonth, approximately 35km south of the Exmouth Townsite. A pipeline bundle co-locates a number of services within a single pipeline for use in the development of offshore gas fields. The proposal consists of an onshore pipeline bundle fabrication site and associated infrastructure, two bundle tracks (approximately 10km in length) along which the... Read more...Last updated: April 15, 2019
The Department of Agriculture and Food, Western Australia (DAFWA) proposes to erect a 660 kilometre long, 1.35 metre high extension to the existing State Barrier Fence from its current termination point near the town of Ravensthorpe to the east of Esperance near Cape Arid National Park. The purpose of the Esperance extension is to protect the south-eastern agricultural enterprises from predation and grazing from wild populations. This proposal was originally referred by the Conservation Council... Read more...Last updated: April 1, 2019
Changes to condition 7 (Restricted areas and management of Tetratheco paynteroe ssp. paynterae at the Windarling Range) to allow future ground disturbing access to the restricted 'Area B', and condition 10 (Residual impacts and risk management measures) in terms of revised research and management offset measures for threatened flora species. Read more...Last updated: March 28, 2019
The EPA has received a third party referral for the development and operation of a Class II or III Putrescible Landfill on a property known as Allawuna, within the Shire of York. The proponent has advised the EPA that only Class II waste will be accepted. The proposal is located on Lots 9926, 26934, 4869 and 5831 Great Southern Highway, Saint Ronans. The proposal has a nominal life expectancy of 37 years and will accept between 150,000 and 250,000 tonnes of waste each year. Read more...Last updated: March 26, 2019
The proposal is to upgrade the Liquefied Petroleum Gas (LPG) extraction plant at Kwinana. The proposed upgrade will coincide with a reduction in the concentration of LPG available in natural gas from the North West Shelf and enable the proponent to maintain existing levels of production of LPG. Read more...Last updated: March 5, 2019
Pilbara Energy Company Pty Ltd (a wholly owned subsidiary of Fortescue Metals Group Limited (FMG)) is seeking to develop the Pilbara Transmission Project (the proposal), a high voltage power transmission network in the Pilbara region of Western Australia. The proposal is comprised of approximately 375 kilometres of 220 kilo-volt overhead transmission lines with terminal and substation infrastructure. The proposal is to be located within a 4780 hectare (ha) development envelope. The proposal... Read more...