This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: October 24, 2022
The Jansz feed gas pipeline is proposed to supply natural gas from the Jansz/Io field located in Commonwealth waters approximately 200km off the Pilbara coast of Western Australia and pipe it across the Barrow Island Nature Reserve to the Gorgon Gas Treatment Plant on Barrow Island. Read more...Last updated: October 19, 2022
Adequacy of the existing implementation conditions of the above mentioned Ministerial Statements with respect to avoiding, reducing and offsetting greenhouse gas emissions. Read more...Last updated: July 21, 2022
Ongoing operation of the North West Shelf Project to enable the long-term processing of third party gas and fluids and North West Shelf Joint Venture field resources through the North West Shelf Project facilities until around 2070. Read more...Last updated: July 11, 2022
Strike South West Pty Ltd propose to construct and operate the Walyering Conventional Gas Development. The proposal will comprise two free-flowing conventional gas wells, a gathering system of flowlines, a production facility and a tie-in point to the third-party operated Parmelia Gas Pipeline. The proposal is located within an agricultural area approximately 6.5 kilometres (km) northwest of Cataby and 21 km west of Dandaragan (Shire of Dandaragan). The proposal would include a total... Read more...Last updated: July 11, 2022
AWE Perth Pty Ltd proposes to undertake a conventional exploration drilling program located south-east of Dongara, Western Australia (WA). The Proposal includes the construction of a single deviated well, immediately adjacent (extending beneath) the Yardanogo Nature Reserve, and within MEPAU’s Production Licence L1. The intent of the Proposal is to evaluate the gas-bearing potential of the Gynatrix prospect by measuring the properties of the Kingia Sandstone and High Cliff Sandstone formations... Read more...Last updated: July 8, 2022
Theia Energy No.1 Pty Ltd (the Proponent) proposes to drill two exploration wells (one vertical and one horizontal) and undertake hydraulic fracture stimulation of the horizontal well within Petroleum Exploration Permit EP493 located in the Canning Basin, 155km South-east of Broome. The Proposal involves an extension of the existing well site and camp site, drilling of two exploration wells (Theia-2V and Theia-3H), hydraulic fracture stimulation (HFS) and flow-test of Theia-3H. The Proposal... Read more...Last updated: June 14, 2022
The Proposal would include the following activities: shore crossing site preparation including installation of temporary facilities along the shoreline at the Pluto LNG Facility to facilitate the installation of the trunkline in shallower depths preparation works associated with the installation of the trunkline including dredging and associated spoil disposal at existing spoil grounds trunkline installation (about 32.7 kilometres long within State waters) shore crossing site reinstatement rock... Read more...Last updated: May 6, 2022
Bennett Resources is proposing to undertake an unconventional exploration drilling and hydraulic fracture stimulation program within Petroleum Exploration Permit EP 371 (EP 371) within the Shire of Derby, West Kimberley. The proposal area is located approximately 123 kilometres south east of the town of Derby. The proposal comprises the construction of up to twenty wells in a region of the Canning Basin that has been previously surveyed and explored for petroleum purposes. The proposal is... Read more...Last updated: February 2, 2022
Conditions 6-12, 9-1 to 9-5 inclusive, and 12-1 to 12-8 inclusive of Ministerial Statement 873 are to be removed from the statement and conditions 9-1 to 9-5 inclusive and conditions 12-1 to 12-8 inclusive are to be transferred into a new ministerial statement. The change will facilitate the transfer of conditions relevant to the operation of port facilities from Chevron Australia Pty Ltd to the Pilbara Ports Authority via this new Ministerial Statement. Read more...