This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: April 29, 2024
Energy Resources Ltd proposes a conventional gas project, to construct and operate a gas processing plant and pipeline in the Mid-West region of Western Australia, approximately 350 km north of Perth, 25 km east of Dongara and 15 km west of Mingenew. The proposal comprises the construction and operation of a natural gas processing facility with a nominal production capacity of 250 terajoules per day, up to six (6) natural gas production wellheads, and an infield gathering system and... Read more...Last updated: June 26, 2023
Karara Mining Limited is seeking to revise its existing Karara Iron Ore Mine, located 320 km north-northeast of Perth in the Midwest Region of Western Australia. The revised proposal includes additional ground disturbance to support the revised Life of Mine strategy, including a revised development envelope, extension of the tailings storage facility and waste rock landform, incorporation of the areas previously approved under the Mungada Iron Ore Project (MIOP) (MS 806) and areas required for... Read more...Last updated: June 14, 2023
Perpetual Resources Limited propose to develop a silica sand mine in the Geraldton Sandplain bioregion of Western Australia, approximately 300 km north of Perth. The proposal would include a total disturbance of 590 hectares of native vegetation and will involve sequential mining of sand above the water table. 100 ha will be cleared within the first two years followed by annual clearing of 20 ha cells and progressive rehabilitation of mined cells. Vegetation and topsoil will be stockpiled for... Read more...Last updated: May 29, 2023
Time limit for substantial commencement, review of the adequacy of existing implementation conditions to ensure consistency with the EPA’s current objectives for each environmental factor. Read more...Last updated: February 20, 2023
Project Haber Pty Ltd proposes to construct and operate a 1.4 million tonnes per annum (Mtpa) urea plant in East Arrowsmith (South Erregulla). The proposal is located approximately 280 km north of Perth and 45 km south east of Dongara, in the Shire of Three Springs. The urea plant comprises of an Air Separation Unit (ASU) producing nitrogen, oxygen and hydrogen for various processes; an ammonia synthesis unit; and a granulation and urea production unit. Supporting infrastructure includes gas... Read more...Last updated: August 1, 2022
Australian Vanadium Limited (AVL) propose to construct and operate a vanadium processing facility in the Midwest region, approximately 80 km east of Geraldton and 27 km west of Mullewa on the Geraldton-Mount Magnet Road in the City of Greater Geraldton. The proposal will include a processing facility which includes a processing plant, evaporation ponds, support facilities, heavy and light vehicle access roads, water production bores, reverse osmosis plant and ancillary office. The processing... Read more...Last updated: August 1, 2022
Westralian Iron Pty Ltd (the Proponent) is proposing to undertake an exploration drilling program at the Koolanooka Hills, located in the Shire of Morawa, approximately 20 km east-south-east of the township of Morawa. The purpose of the Proposal is mineral exploration drilling for iron ore and would include the clearing of no more than 2.95 hectares of native vegetation within a 3.80 ha disturbance footprint. The proposal would involve earthworks to establish (25) drill pads and access tracks,... Read more...Last updated: July 18, 2022
Infinite Green Energy propose to construct and operate a green energy wind and solar powered hydrogen production facility within freehold lots 3, 4, 100 and 6110 located in Arrowsmith 30km south of Dongara, within the Shire of Irwin, Western Australia (WA). Infinite Blue Energy purchased the 1929.68 ha property due to the site’s abundance of wind and solar power combined with abundant quantity of quality fresh water. The previous property use involved sheep, cattle and goats grazing. The... Read more...Last updated: July 15, 2022
The proposal is for above and below water table mining and beneficiation of vanadium ore to produce an enriched vanadium-iron concentrate. The proposal is located 40 km south-southeast of Meekatharra and includes the development of open mine pits and associated infrastructure including but not limited to access roads, accommodation camp, a crushing, milling, flotation, and magnetic separation (beneficiation) plant, waste rock and tailings storage, and support infrastructure. Read more...Last updated: July 11, 2022
AWE Perth Pty Ltd proposes to undertake a conventional exploration drilling program located south-east of Dongara, Western Australia (WA). The Proposal includes the construction of a single deviated well, immediately adjacent (extending beneath) the Yardanogo Nature Reserve, and within MEPAU’s Production Licence L1. The intent of the Proposal is to evaluate the gas-bearing potential of the Gynatrix prospect by measuring the properties of the Kingia Sandstone and High Cliff Sandstone formations... Read more...Last updated: July 11, 2022
Australian Garnet Pty Ltd is seeking to develop a greenfields mineral sands mine located 35 kilometres south of Kalbarri, in the Mid-West region of Western Australia, within the Shire of Northampton. The proposal would include the progressive development of above-groundwater mine pits, and associated processing facilities and infrastructure. The proposal would require the clearing of up 161 hectares of native vegetation and mined sections would be progressively backfilled and rehabilitated. The... Read more...Last updated: June 20, 2022
The proponent (VRX Silica Ltd) proposes to develop a high-grade silica sand mine in the Geraldton Sandplain bioregion of WA, approximately 260 km north of Perth and 20km North-West of Eneabba. The proposal would include a total disturbance of 334 hectares of native vegetation. Vegetation and topsoil would be relocated to rehabilitation areas using a Vegetation Direct Transfer method (VDT). Mining is proposed to occur in blocks (150m x 150m), with up to five blocks being mined each year. The... Read more...Last updated: May 16, 2022
The Proposal will use combined onshore wind and solar energy of approximately 5.2 gigawatt (GW) capacity to produce green hydrogen which will be converted to an estimated 2 Million tonnes per annum (Mtpa) of green ammonia for export to emerging green energy markets. The Proposal is located within the Shire of Northampton, Western Australia (WA), approximately 20 km north of Kalbarri. The Proposal comprises the following major components: a wind and solar farm with a combined installed capacity... Read more...Last updated: December 10, 2021
The Proposal will involve the construction and operation of a new rare earth refinery at Iluka Eneabba Mine Site, located 5 km south of Eneabba townsite and approximately 300 km north of Perth. It will produce approximately 17,500 tpa of individual rare earth oxides and carbonates. The Proposal will utilise the existing Eneabba monazite concentrate, future Iluka feedstocks and third party feedstocks. Products will be transported via road trains from Eneabba to the port of Fremantle for export.... Read more...Last updated: February 15, 2021
Energy Resources Ltd proposes to undertake 3D (Romanesque) and 2D (Black Cormorant) seismic acquisition surveys to map the subsurface geology of an area within petroleum exploration permits EP 389 (R4), EP 440 (R1), and petroleum production licences L 18 and L 19. The proposal is located within the Shire of Gingin. The Romanesque 3D seismic acquisition survey comprises of 594 line kilometres of seismic lines plus 72 line kilometres of contingent lines. The Black Cormorant 2D seismic... Read more...Last updated: January 6, 2020
The proposal is to develop a nature-based campground within Lots 62 and Lot 303 Dirk Hartog Island. The proposal would include up to 23 bare earth campsites, and 3 camp-kitchen/ablution blocks to facilitate up to 80 people in camping accommodation, and the construction of vehicle access roads and firebreaks, as well as other associated infrastructure. Read more...Last updated: June 24, 2019
Salt Lake Potash proposes to develop the Lake Way SOP Demonstration Plant. The proposal is ocated in and around Lake Way, approximately 25 kilometres south of Wiluna. The proposal will extract and evaporate natural brines to produce up to 50,000 tonnes per year of Sulphate of Potash (SOP). The activities and infrastructure include: On-playa infrastructure – brine extraction trenches; pond infrastructure; and associated pipework. Off-playa infrastructure – processing plant, process water... Read more...Last updated: February 18, 2019
The proponent has requested consideration be given to removal of condition 9, which is the spider monitoring program. The Minister noted, that during the assessment of the proposal, offsets were proposed by the proponent but were not conditioned in Ministerial Statement 805. As part of this inquiry, the Minister requested that consideration is given to the application of offsets to the proposal and whether they should be included as a condition. Read more...Last updated: July 27, 2017
Tungsten Mining NL proposes to extract and process tungsten and molybdenum from the Mulgine Hill and Mulgine Trench deposits at Mount Mulgine over a period of 15 years. The proposal is located approximately 15 km north east of Rothsay, within the Shire of Perenjori. The proposal is partially located: on M59/425, which was previously mined for gold as part of the Minjar Gold Mine Project within the former Warriedar pastoral station, which is managed for conservation purposes by the Department of... Read more...Last updated: May 22, 2017
In response to matters raised in the 7-day public comments on the referral, the proponent provided the following clarifying information: 1. Proponent consultation with the Shire of Irwin; 2. Rehabilitation Monitoring Report for the Redhill South 01 well site; 3. Proponent response to 7-day public comments. Read more...