This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: April 8, 2024
FI Joint Venture Pty Ltd is proposing to construct and operate a magnetite iron ore project, with mining, processing and associated infrastructure. The proposed mine is located approximately 225 kilometres (km) east-northeast of Geraldton and 15 km northeast of Yalgoo within the Shire of Yalgoo. The proposal includes a magnetite slurry pipeline and a water pipeline to Geraldton Port and a gas supply pipeline from the Dampier to Bunbury Natural Gas Pipeline network. Mining of the magnetite will... Read more...Last updated: July 29, 2019
The proposal is to develop and operate a mineral sands mine approximately 25 kilometres south-east of the township of Dongara in the Midwest Region of Western Australia. Read more...Last updated: September 25, 2018
Rosslyn Hill Mining Pty Ltd is proposing to expand their operations at Paroo Station to install a hydrometallurgical facility to convert lead carbonate concentrate to lead metal (ingots). The proposal is located 30 km west of Wiluna (Shire of Wiluna). The proposal includes an additional clearing of approximately 400 hectares, and the exportation of the product through the Port of Fremantle. Read more...Last updated: January 9, 2017
Toro proposes to revise the Approved Project by developing Millipede and Lake Maitland uranium deposits and developing associated infrastructure. The Proposed Extension would result in the additional direct disturbance of approximately 1,582 hectares (ha) within an additional Development Envelope of approximately 3,891 ha. The Proposed Extension would include open mine pits at Millipede and Lake Maitland, in-pit tailings storage facility (TSF) at Millipede, accommodation village, workshop, run-... Read more...Last updated: February 26, 2015
The Minister for Environment has requested that the EPA inquire into and report on the matter of changing the implementation conditions relating to Ministerial Statement 905 in order to: extend the time limit on shipments of lead carbonate through Fremantle Port (condition 3A); and reduce the amount of the financial assurance required and allow the release and reinstatement of the financial assurance in the event operations are suspended (condition 18). Read more...Last updated: October 22, 2012
To develop an open-cut vanadium mine and process plant at Barrambie, 75 kilometres north-west of the Sandstone townsite and 116 kilometres south-east of Meekatharra Read more...Last updated: May 22, 2012
The project site is located approximately 15 kilometres south of Eneabba in the Shires of Coorow and Carnamah, Western Australia. The CWC Project involves open cut mining and supply of approximately 75 Mt of sub-bituminous grade coal to the proposed Coolimba Power Station at a rate of 2 to 2.5 Mtpa over 30 years. The South Eneabba Nature Reserve is at the southern end, east of the proposed mine, while the Lake Logue Nature Reserve is towards the northern end and on the western side of the... Read more...Last updated: March 14, 2011
The proposal is to construct and operate iron ore handling and storage facilities and ancillary infrastructure required to develop and operate a 45 million tonne per annum iron ore export facility at Oakajee, 24km north of Geraldton. Read more...Last updated: March 11, 2011
The proposal is to mine hematite and magnetite iron ore from the Blue Hills North and Terapod deposits, and construction of associated mine infrastructure, upgraded access road to Morawa, Tilley Siding, and powerline corridor in the Midwest region of Western Australia. Read more...Last updated: December 12, 1997
The proposal is to establish the Geraldton Steel Plant (GSP) at Oakajee, 23km north of Geraldton. The GSP will be located within the planned Oakajee Industrial Estate in the Shire of Chapman Valley. The proposal will consist of the following main components: a pellet plant in which the majority of iron ore is converted to pellets suitable for direct reduction; two direct reduction plants for the reduction of pelletised iron ore to direct reduced iron; three electric arc furnaces and tlu·ee... Read more...