This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 29, 2005
Kemerton silica sand mining revised proposal - additional mining areas and transfer of land for conservation Read more...Last updated: November 29, 2005
The proposal is to construct and operate a pipeline to supply gas to the Kemerton Power Station (located approximately 22km north east of Bunbury nearby the Kemerton Industrial Estate) and to construct a meter station at the power station site. The proposed pipeline would be 5km long and would connect to the DBNGP at MLV 154/155 and then run parallel to the existing DBNGP until it deviates west to supply the Kemerton Power Station. The proposed pipeline would be installed in the existing 16-... Read more...Last updated: October 19, 2005
Worsley Alumina’s alumina refinery has existing approval for the production of 3.7 million tonnes per anum (Mtpa) of alumina. This proposal is for the construction and operation of a natural gas-fired, co-generation option. The proposal would be implemented in two stages, each consisting of a gas turbine with a nominal generation capacity of 120 MW electrical output and a heat recovery steam generator (HRSG) of nominally 210 MW steam output. The facility would be located at the Worsley alumina... Read more...Last updated: October 17, 2005
The proposal is to construct and operate a 330MW capacity advanced sub-critical coal-fired power station (known as Collie B) at the Collie Power Station Site, immediately adjacent to the existing ‘Collie A’ Power Station. It will be an advanced sub-critical coal fired base-load generation facility with a nominal generating capacity of up to 330MW. The Collie B Power Station will supply electricity to Western Power for the South West Interconnected System (SWIS) under the SWIS Power Procurement... Read more...Last updated: October 3, 2005
The proposed synthetic rutile plant is based on the existing plant commissioned in 1986 and pilot scale work undertaken since 1991. The proposal involves the construction of a second kiln and supporting plant, a wet processing section of conventional design or new technology, a liquor containment and waste handling system, and a relocated and expanded artificial wetland. Engineering design and process improvements would be incorporated into the project utilising experience and expertise gained... Read more...Last updated: June 13, 2005
Wesfarmers Energy Limited proposes to construct and operate the 300MW Collie B Power Station on a site directly adjacent to the existing Collie A Power Station and located approximately 10km east-north-east of Collie. It will be a supercritical coal-fired base-load generation facility with a nominal generating capacity of approximately 300MW. The Collie B Power Station will supply electricity to the South West Interconnected System (SWIS). Read more...