Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Land use (4) Apply Land use filter
  • Infrastructure (3) Apply Infrastructure filter
  • Bauxite (2) Apply Bauxite filter
  • Sand, rock, gravel and clay (2) Apply Sand, rock, gravel and clay filter
  • Clearing (1) Apply Clearing filter
  • Industrial (1) Apply Industrial filter

Filter by current status:

  • Decision on whether to assess has been published (4) Apply Decision on whether to assess has been published filter
  • Ministerial Statement published (4) Apply Ministerial Statement published filter
  • Environmental Review document open for public submissions (1) Apply Environmental Review document open for public submissions filter
  • Ministerial Statement withdrawn under s.47A (1) Apply Ministerial Statement withdrawn under s.47A filter
  • Public Environmental Review period closed (1) Apply Public Environmental Review period closed filter
  • Waiting for Minister to reject proposal under s45(8) (1) Apply Waiting for Minister to reject proposal under s45(8) filter

Filter by preliminary environmental factors:

  • (-) Remove Terrestrial Fauna filter Terrestrial Fauna
  • Flora and Vegetation (11) Apply Flora and Vegetation filter
  • Inland Waters Environmental Quality (6) Apply Inland Waters Environmental Quality filter
  • Social Surroundings (6) Apply Social Surroundings filter
  • Hydrological Processes (5) Apply Hydrological Processes filter
  • Inland Waters (4) Apply Inland Waters filter
  • Terrestrial Environmental Quality (4) Apply Terrestrial Environmental Quality filter
  • 37 (2) Apply 37 filter
  • Coastal Processes (2) Apply Coastal Processes filter
  • Benthic Communities and Habitats (1) Apply Benthic Communities and Habitats filter
  • Marine Environmental Quality (1) Apply Marine Environmental Quality filter

Filter by Proponent:

  • Alcoa of Australia Limited (2) Apply Alcoa of Australia Limited filter
  • Cape Bouvard Investments Pty Ltd (1) Apply Cape Bouvard Investments Pty Ltd filter
  • City of Busselton (1) Apply City of Busselton filter
  • DBNGP (WA) Nominees Pty Limited (1) Apply DBNGP (WA) Nominees Pty Limited filter
  • Mr A Scolaro (1) Apply Mr A Scolaro filter
  • Mr P Gangemi (1) Apply Mr P Gangemi filter
  • Pleasant Grove Pty Ltd (1) Apply Pleasant Grove Pty Ltd filter
  • Point Grey Development Company Pty Ltd (1) Apply Point Grey Development Company Pty Ltd filter
  • Questdale Holdings Pty Ltd (1) Apply Questdale Holdings Pty Ltd filter
  • South32 Worsley Alumina Pty Ltd (1) Apply South32 Worsley Alumina Pty Ltd filter
  • Tenwood Holdings Pty Ltd (1) Apply Tenwood Holdings Pty Ltd filter
  • Water Corporation of Western Australia (1) Apply Water Corporation of Western Australia filter

Filter by region:

  • (-) Remove Peel filter Peel
  • Perth (1) Apply Perth filter

Filter by last updated:

  • 2025 (2) Apply 2025 filter
  • 2024 (2) Apply 2024 filter
  • 2022 (1) Apply 2022 filter
  • 2021 (1) Apply 2021 filter
  • 2019 (2) Apply 2019 filter
  • 2012 (1) Apply 2012 filter
  • 2011 (1) Apply 2011 filter
  • 2003 (1) Apply 2003 filter
  • 1996 (1) Apply 1996 filter
  • 1991 (1) Apply 1991 filter
  1. Home
  2. Proposal search
  3. Peel
  4. Terrestrial Fauna

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Pinjarra Alumina Refinery Revised Proposal

Last updated: May 29, 2025

Alcoa of Australia Limited is proposing to increase production at the Pinjarra Alumina Refinery (the refinery) and increase the rate of bauxite mining at the existing Huntly Mine within Mineral Lease 1SA (ML1SA) to supply 2.5 million tonnes per annum (Mtpa) bauxite, for export to third party customers. The Proposal comprises the following components: an increase in alumina production at the refinery by 5 percent, from 5.0 Mtpa to 5.25 Mtpa; A transition of the Huntly mine into the Myara North... Read more...

Samson Brook Redevelopment Scheme

Last updated: May 20, 2025

The proposal being assessed is for the diversion of 8 gigalitres a year (on average) (GL/yr) of unallocated water resources in the Samson Catchment to be diverted for public water supply, the construction of a pipe head dam and related infrastructure. The Samson Brook Redevelopment Scheme is a key element of the Water Corporation’s drought recovery plan. Read more...

Worsley Mine Expansion – Revised Proposal

Last updated: December 20, 2024

South32 Worsley Alumina Pty Ltd currently operates the Boddington Bauxite Mine (located approximately 5km south-west of Boddington), Worsley Refinery (located approximately 15 km north-west of Collie) and port operations at the Bunbury Port. The new proposal is for the: · expansion of the existing mining area and incorporation of new mining areas; · development of a bauxite transport corridor; · development of a contingency mining area and maintenance work at the Refinery; and · development of... Read more...

Clearing Permit Application at Myara North

Last updated: November 4, 2024

Alcoa of Australia Limited’s (Alcoa) clearing permit application (CPS 10626/1) to the Department of Energy, Mines, Industry Regulation and Safety is for the clearing of native vegetation for geotechnical investigations. Under the original CPS application, referred to the EPA, Alcoa sought to clear 20 hectares of native vegetation (ha). However, Alcoa has since amended the application to reduce the area to 11ha. The geotechnical investigations are located at Myara North which is a future mine... Read more...

Lots 2 and 10 Rowley Road, Mandogalup

Last updated: September 6, 2022

Questdale Holdings Pty. Ltd. (the proponent) are proposing to clear vegetation for bushfire fuel reduction and to extend an existing sand quarry extraction operation within Lots 2 and 10 Rowley Road, Mandogalup. The proposal area consists of 43.67 hectares (ha) and is located on freehold land. The proponent proposes to extract sand at a rate of 195,000 tonnes per annum for a period of 10 years. Excavated material will be screened prior to loading. The proponent proposes to clear approximately... Read more...

Sediment removal in the Lower Vasse River

Last updated: November 1, 2021

The City of Busselton propose to remove a layer of nutrient-rich, fine organic sediments which have accumulated throughout the lower reach of the Vasse River. The proposal is located within the City of Busselton and extends for 2.5 km from the Butter Factory Museum to the Busselton Bypass. Sediment removal will be staged and undertaken via a mobile micro-dredge, or similar unit. The dredged sediment will be pumped to a designated onshore laydown area(s), allowed to dewater with the return water... Read more...

Special Residential Subdivision Part Murray Locations 109 and 1339 Pleasant Grove Mandurah – Ministerial Statement 297 [S46]

Last updated: August 5, 2019

Read more...

Dampier to Bunbury Natural Gas Pipeline (DBNGP) to Albemarle Lithium Plant Gas Pipeline Proposal

Last updated: March 5, 2019

DBNGP (WA) Nominees Pty Limited propose to construct 670m of underground natural gas pipeline between the Albemarle Kemerton Plant (a lithium hydroxide manufacturing plant) and the existing Dampier to Bunbury Natural Gas Pipeline.  The proposal is located in Kemerton, approximately 17km north-east of Bunbury and will provide natural gas to the Albemarle Kemerton Plant (Ministerial Statement No. 1085) . The proposed pipeline will be constructed within a 30m wide corridor requiring clearing of 2.... Read more...

Point Grey Marina

Last updated: August 1, 2012

The proposal is for the construction of an onshore marina (and associated boating infrastructure e.g. boat pens, jetties, navigational aids, entrance channel, protective groynes, public boat ramps and car parks) on the western side of the Point Grey peninsula. The proposal also includes the construction of a 2.5 kilometre navigation channel across the Harvey Estuary from the marina to the Dawesville Channel. Read more...

Rural Subdivision – Lots 1000, 2240, 2275, 2657 and 3045 Preston Beach Road Lake Clifton

Last updated: May 30, 2011

The proposal is to subdivide lots 1000, 2240, 2275, 2657 and 3045 Preston Beach Road, Lake Clifton. The proposal was withdrawn from the WAPC during the appeals process, thus no Ministerial decision was required. Read more...

Proposed Grouped Dwelling Development, Pt Lot 1001, Foreshore Drive, Singleton

Last updated: April 7, 2003

Proposal by Temwood Holdings Pty Ltd to construct 92 grouped dwellings and a local shop/house on Pt Lot 1001 Foreshore Drive, Singleton. Read more...

Redevelopment of Caravan Park into a Park Home Estate

Last updated: March 1, 1996

The Tony Scolaro Family Trust intends to redevelop an existing caravan park into a Park Home Estate. The proposal will involve the construction of new infrastructure including 120 park homes (demountable houses), associated access roads, a new wastewater treatment plan and infiltration areas for stormwater and treated wastewater. Read more...

Extractive industry - Lot 242 Corio Road, Pinjarra

Last updated: December 21, 1991

Proposal to remove an estimated 295,650 m 3 of sand from a pastured hill which runs east-west along the northern boundary of Lot 242 Corio Road, Pinjarra. Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.