This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: July 17, 2017
The Department of Fisheries, on behalf of the Minister for Fisheries proposes to create an ‘Aquaculture Development Zone’ to provide a management precinct for prospective future aquaculture proposals within State Waters, approximately 75 kilometres west of Geraldton within the Fish Habitat Protection Area of the Abrolhos Islands. The strategic proposal area has been selected by the proponent to maximise suitability for marine finfish aquaculture, and minimise potential impacts on existing... Read more...Last updated: July 17, 2017
The proposal is to subdivide Lot 21 Webster Road, Forrestfield into seven (7) industrial lots as documented in Schedule 1 of Ministerial Statement 841 . The Minister for Environment has requested that the Environmental Protection Authority (EPA) inquire into and report on the matter of changing the implementation conditions relating to the Industrial Subdivision of Lot 21 Webster Road Forrestfield proposal in order to extend the “Commencement and Time Limit of Approval” for substantial... Read more...Last updated: July 17, 2017
The proposal is for the development and operation of the Parker Range Project, located in the Mount Caudan section of the Parker Range within the Shire of Yilgarn. It includes the development and operation of an above and below the watertable greenfields iron ore mine and associated infrastructure. This is an inquiry under s46 into a request to extend the Time Limit of Authorisation of Ministerial Statement 892 . Read more...Last updated: June 29, 2017
The proposal is for the expansion of the Monkey Mia Dolphin Resort, incorporating both construction and operation. There are three primary components to the proposal: increasing the capacity of the Resort from approximately 600 to 1200 guests per night through an increase from its current area of 3.74 hectares (ha) up to 6.84 ha; developing a new staff accommodation precinct of 2.3 ha immediately to the west of the existing Resort area, incorporating accommodation, recreational facilities and... Read more...Last updated: June 28, 2017
Sinosteel Midwest Corporation proposes an expansion of its existing operations at the Blue Hills Iron Ore Mine, involving the construction and operation of two new mine pits and waste rock dumps. A new processing plant and additional road infrastructure will also be established. The EPA set the level of assessment on the Blue Hills Mungada East Expansion Project by Sinosteel Midwest Corporation, as an Assessment on Proponent Information, category B (environmentally unacceptable). Following the... Read more...Last updated: June 28, 2017
The proposal is to construct and operate two iron ore mines, haul roads and mine infrastructure in the Yilgarn area of Western Australia, 100 kilometres north of Southern Cross. The EPA set the level of assessment on the Jackson 5 and Bungalbin East Iron Ore Project by Polaris Metals Pty Ltd, as an Assessment on Proponent Information, category B (environmentally unacceptable). Following the appeal period and the Ministers subsequent determination on the Appeals received, the Minister remitted... Read more...Last updated: June 22, 2017
Proposal by BHP Iron Ore Pty Ltd to develop 14 iron ore deposits at Mining Area C-Northern Flank, 100 km north west of Newman. Read more...Last updated: June 6, 2017
The proposal is to construct and operate a freeway-standard dual carriageway between the Reid Highway/Tonkin Highway junction and the Great Northern Highway at Muchea. Read more...Last updated: May 22, 2017
In response to matters raised in the 7-day public comments on the referral, the proponent provided the following clarifying information: 1. Proponent consultation with the Shire of Irwin; 2. Rehabilitation Monitoring Report for the Redhill South 01 well site; 3. Proponent response to 7-day public comments. Read more...Last updated: April 10, 2017
Condition 3-1 of Ministerial Statement 906 requires the proponent to substantially commence the proposal within five years of the date of issue of the Statement (that is, before 1 August 2017). The proposal has not yet substantially commenced. The proponent for the proposal, Point Grey Development Company Pty Ltd, has requested an extension of the Time Limit of Authorisation (now referred to as “Time Limit for Proposal Implementation”) for substantial commencement to be extended to be... Read more...Last updated: April 10, 2017
The Shire of Serpentine Jarrahdale proposes to extract gravel from a twelve hectare area known as the Scrivener Road Gravel Reserves. The reserves are located at the top of the scarp south of Serpentine and contain nesting habitat for all three protected black cockatoo species. Extraction is proposed in two hectare stages over a period of thirteen years. Read more...Last updated: April 3, 2017
The Western Australian Planning Commission and the City of Armadale propose to develop a water-based recreation park incorporating an international rowing course and other facilities including a residential component on land situated on Lake Road in the City of Armadale. Read more...Last updated: April 3, 2017
The proponent for the proposal, Western Australian Sports Centre Trust (trading as Venues West), has requested changes to the implementation conditions 6-1 and 6- of Ministerial Statement 632 relating to Water Quality. This is the EPA's inquiry into the requested amendments. Read more...Last updated: March 22, 2017
Westralian Iron Pty Ltd proposes to develop three bulk sample pits at Koolanooka South (Figure 1). The project site is located approximately 20 kilometres (km) due east of Morawa and 370 km north of Perth. Bulk sampling is required to assist with future planning and design for the proposed development and to provide sufficient material for a test regime to fully understand the characteristics of the ore to enable an efficient Magnetite processing plant to be designed. The bulk sampling... Read more...Last updated: March 20, 2017
The CSIRO is proposing to construct and operate the SKA-1 Low Frequency Aperture Array. The SKA -1 Low Frequency Aperture Array would be constructed at the SKA Telescope on Boolardy Station approximately 315 km northeast of Geraldton in the Murchison region. The proposal for the SKA – Low Frequency Aperture Array includes a total disturbance of 608 hectares for construction of the Array, access tracks and infrastructure. Read more...Last updated: March 7, 2017
The Department of Transport proposes to undertake maintenance and improvement works to the Casuarina Causeway located in Bunbury WA. The proposal includes the refurbishment and realignment of the revetment (including a 0.08 ha increase in the causeway footprint), installation of upgraded services, road works, drainage and landscaping. A multi-purpose building (including ablutions) and fishing/viewing platforms are also included as provisional items. Read more...Last updated: February 9, 2017
The proposal is to construct and operate the SKA-1 Low Frequency Aperture Array. The SKA -1 Low Frequency Aperture Array would be constructed at the SKA Telescope on Boolardy Station approximately 315 km north-east of Geraldton. The proposal for the SKA – Low Frequency Aperture Array includes a total disturbance of 608 hectares for construction of the Array, access tracks and infrastructure. Read more...Last updated: February 6, 2017
The Water Corporation proposes the construction and operation of the Balannup Pressure Main, a 4.5 km wastewater pressure main from the Collared Street Pump Station to the Waterworks Road Pump Station in Armadale. Read more...Last updated: January 25, 2017
The proposal involves the development and operation of a 750 Mt iron ore mine, processing facility and associated infrastructure within mining leases M47/1414 and M47/1419. The project area is located approximately 100km north west of Newman in the Fortescue valley. The project area is approximately 15km south of the Fortescue Marsh, a wetland of national significance, and is intersected by Weeli Wolli Creek, which is a major Pilbara drainage system that discharges to the Marsh. Read more...