This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: October 17, 2005
The proposal is to construct and operate a 330MW capacity advanced sub-critical coal-fired power station (known as Collie B) at the Collie Power Station Site, immediately adjacent to the existing ‘Collie A’ Power Station. It will be an advanced sub-critical coal fired base-load generation facility with a nominal generating capacity of up to 330MW. The Collie B Power Station will supply electricity to Western Power for the South West Interconnected System (SWIS) under the SWIS Power Procurement... Read more...Last updated: October 12, 2005
The proposal is to construct an ammonia–urea plant on the Burrup Peninsula. The plant will have a production capacity of 2300 tonnes/day (t/d) of ammonia and 3500 t/d of urea. The plant and associated infrastructure will be composed of: a natural gas supply pipeline from the North West Shelf Liquefied Natural Gas (LNG) Plant (to be located in a multi-user service corridor); ammonia plant; urea plant; fluid bed granulation plant; seawater desalination, treatment and storage; internal power... Read more...Last updated: September 21, 2005
CSBP currently produces approximately 235,000 tpa of ammonium nitrate at its Kwinana operations which are located within the Kwinana Industrial Area. This proposal is to expand the ammonium nitrate production capacity to approximately 580,000 tpa by debottlenecking and duplicating its existing facilities. The expansion includes: duplication and/or debottlenecking of the existing 500 tpd nitric acid plant; duplication and/or debottlenecking of the existing 635 tpd ammonium nitrate reaction plant... Read more...Last updated: August 25, 2005
The proposed Simpson Development proposal will make use of three existing wells and one that is the subject of a separate referral. The development will consist of: the Simpson Alpha offshore mini-platform located at the Tanami-4 and Tanami-5 wells surface location; the Simpson Bravo offshore mini-platform located at the Simpson-1 and Simpson-3H well locations; and a sub-sea pipeline bundle linking the two mini-platforms to each other and to existing facilities on Varanus Island. The pipeline... Read more...Last updated: July 8, 2005
The proposal is to construct a marina, resort and residential/ canal development as a land backed extension to the Exmouth Boat Harbour immediately south of the Exmouth township. Read more...