This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 8, 2016
The proposal has been referred by Main Roads Western Australia for the assessment of Neerabup Road East and Neerabup Road West only (within the Mitchell Freeway Extension). Stage 1 (Neerabup Road East/West) project includes grade separated interchanges (including road bridges) at Neerabup Road, underpasses at Neerabup Road, and Neerabup Road upgrade from Connolly Drive to Wanneroo Road connection to freeway. Read more...Last updated: December 8, 2016
PMR Quarries Pty Ltd, trading as WA Limestone, proposes to develop a sand and limestone quarry in the McLarty State forest (pine plantation) at Myalup, 8 kilometres south east of Lake Clifton township. Read more...Last updated: December 7, 2016
The proposal is to construct and operate a single entrance onshore marina to accommodate up to 500 boat pens and moorings and a surrounding land development comprising tourism, commercial, public open space and residential land uses. Read more...Last updated: December 2, 2016
The proposal is to construct, operate and maintain a 1.5 km section of Keane road between Anstey and Skeet roads, Forrestdale. The proposal is located within Bush Forever Site 342 (approximately 369 hectares (ha)), which meets all six of the EPA’s criteria for the identification of regionally significant natural areas, contains one of the largest remaining areas of damplands of high conservation value on the Swan Coastal Plain, and is the largest consolidated area of Southern River vegetation... Read more...Last updated: September 12, 2016
The Commissioner for Main Roads Western Australia proposes to construct and maintain the Ellenbrook Bus Rapid Transit to provide a dedicated busway from the Ellenbrook town centre to Reid Highway. It involves the construction of: approximately 10 kilometres of dedicated busway; grade separations of the busway at road crossings; upgrades of all existing intersections; three bus stations with Park and Ride facilities; realignment of Lord Street from Reid Highway to Youle-Dean Road and from Park... Read more...Last updated: September 6, 2016
The proposal is to develop a granite quarry in Gidgegannup, which is expected to yield up to 500,000 tonnes of rock per annum. The proposal is further documented in EPA Report 1375 and Ministerial Statement 861 . Read more...Last updated: July 4, 2016
Urban Resources Pty Ltd proposes to develop a sand quarry on tenement M70/1262, located in Karnup approximately 48 kilometres (km) south of the Perth Central Business District. The proposal would extract 1.5 million cubic metres over a project life of around five years with a total disturbance footprint of around 42 hectares including the mining area, stockpiles, a haul road and site compound. The proponent has advised that the overall post-mining land use is expected to be consistent with the... Read more...