This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: June 1, 2016
The proposal involves an extension to the Wheelarra Hill open pits and overburden storage areas, and the mining of the South Jimblebar and Hashimoto deposits, with disposal of overburden into adjacent Overburden Storage Areas (OSAs) and in-pit disposal. Inquiry under s46 related to Ministerial Statement 857, the subject of EPA Report 1371. Read more...Last updated: May 4, 2016
Life-of-mine proposal to mine iron ore within Mining Leases 270SA and 47/292 at a rate of approximately 45 million tonnes per annum, and subsequent rehabilitation and decommissioning of the site. Read more...Last updated: May 2, 2016
The proposal is to develop an iron ore mine on the Iron Valley tenement located in the Shire of East Pilbara approximately 90 kilometres north-west of Newman. The project would include an above watertable blast and hydraulic shovel open pit mine and supporting infrastructure including dry crushing and screening plant, run of mine pad, waste rock landform, internal roads, power production, hazardous materials storage, waste management facilities, office buildings and an accommodation camp. Read more...Last updated: March 3, 2016
The proposal includes the existing Hamersley Yandicoogina iron ore project and proposed expansion. The existing project includes open pit mining at the Junction Central and Junction South East operations and associated infrastructure, dewatering activities, closure and rehabilitation. The expansion includes the development of new pits at Junction South West and Oxbow, temporary waste landforms, the development of new infrastructure, additional dewatering and water disposal activities. The... Read more...Last updated: February 4, 2016
The West Pilbara Iron Ore Project Stage 1 – Mine and Rail proposal is to develop and operate eight iron ore deposits 35 to 85 km south of Pannawonica and a heavy-haulage railway that connects the mine area to the Anketell Point Port precinct. The EPA's assessment report (Report 1409) was released on 3 August 2011. The Minister for Environment approved the proposal for implementation, subject to the implementation conditions of Ministerial Statement 881 (30 November 2011). In August 2015,... Read more...Last updated: February 4, 2016
The proposal is to develop eight iron ore deposits at five locations, between 35 and 85 kilometres (km) south of Pannawonica. A heavy-haulage railway approximately 285 km in length would be developed to connect the mine area with a port to be constructed at Anketell Point, 25 km north-east of Karratha. The project would produce up to 30 million tonnes per annum (Mtpa) of iron ore. Read more...Last updated: December 24, 2015
The proposal is to develop and operate the Baby Hope iron ore deposit, located 75 km north-west of Newman in the Pilbara region of WA. The Baby Hope proposal includes above water table open pits, waste rock dumps and supporting transport infrastructure. Clearing of up to 1,000 ha within the existing Hope Downs 1 development envelope would be required for the proposal. Product from the Baby Hope deposit would be processed at the at the existing Hope Downs processing facilities. Read more...Last updated: November 12, 2015
The proposal is to construct and operate an open-cut iron ore mine, and associated infrastructure, approximately 40 kilometres (km) east of Newman. Read more...Last updated: October 28, 2015
Hamersley Iron Pty Limited proposes to revise the Marandoo project located approximately 37 kilometres east of Tom Price. The proposal involves additional clearing of 400 hectares and the amalgamation of the three existing Ministerial Statements 286, 598 and 833. Read more...Last updated: October 22, 2015
The proposal is to extend the existing Wheelarra Hill open pits, develop the South Jimblebar and Hashimoto deposits, and to increase the ore processing capacity by 30 million tonnes per annum (mtpa) to 75 mtpa. Open pit mining will occur above and below ground and will involve dewatering. Excess water will be discharged into the Ophthalmia Dam. Read more...Last updated: October 15, 2015
BHP Billiton Iron Ore is proposing to develop and operate the Orebody 32 deposit, located approximately 10 kilometres north-east of the Newman Township in the Shire of East Pilbara. The Proposal is known as the Orebody 32 East Above Water Table Mine Project. Read more...Last updated: August 21, 2015
Robe River Mining Co. Pty Ltd proposes to revise the West Angelas Iron Ore Mine to include mining above and below the water table of Deposit A west and Deposit F, as satellite deposits to the existing operation. The project is located 130 kilometres northwest of Newman in the Pilbara. The proposal includes additional clearing up to 3,223 hectares (ha), an extension of the development envelope of up to 2,750 ha and an increase in abstraction of groundwater of up to 1 gigalitre per annum. Read more...Last updated: August 7, 2015
The Minister for Environment requested the EPA inquire into the matter of changing the implementation conditions relating to the Orebody 18 Iron Ore Mine proposal, particularly the matter of setting a condition on the proposal that would require environmental offsets for the clearing of native vegetation. Inquiry under s46 relating to Ministerial Statement 439 and EPA Report 840 . Read more...Last updated: August 4, 2015
The proposal is for an exploration drilling program which involves disturbance and clearing for access tracks and drill pads, and fencing, on banded iron formation ranges of the Perenjori Hills. Read more...Last updated: July 10, 2015
The proposal involves the expansion of existing operations of the Nammuldi-Silvergrass Iron Ore Project and is therefore a Revised Proposal.The proposal includes the additional clearing of approximately 3,900 ha of vegetation for mine pits, waste dumps and associated mine infrastructure and facilities, and approximately 2,500 ha for the IAA. Read more...Last updated: May 14, 2015
The proposal is to construct and operate an open cut iron ore mine and associated infrastructure for the extraction, processing and transport of iron ore. The proposal is located approximately 70 km north-west of Newman in the Pilbara region of Western Australia. Read more...Last updated: February 20, 2015
The proposal is to develop the Jackson 4 (J4) deposit and construct and operate an iron ore mine and supporting infrastructure, access track and haul road in the Goldfields region of Western Australia, approximately 60 kilometres north-west of Koolyanobbing. Read more...Last updated: January 12, 2015
The proposal is to construct and operate two iron ore mines, haul roads and mine infrastructure in the Yilgarn area of Western Australia, 100 kilometres north of Southern Cross. Following the appeal period and the Ministers subsequent determination on the Appeals received, the Minister remitted this proposal back to the EPA for assessment at the level of Public Environmental Review (8 weeks). Access the re-assessment of this proposal here. Read more...Last updated: October 24, 2014
The construction and operation of an open pit magnetite mine located approximately 90 kilometres east-north-east of Albany, and pipelines for ore slurry transport and return water, connecting the mine site and new port loading facilities in the Port of Albany. Inquiry into amending the conditions of Ministerial Statement 816 (extension of term). Read more...Last updated: October 17, 2014
To undertake mining and processing of up to 129 million tonnes of magnetite iron ore in the Central and Western deposits at the Balla Balla mine site and to construct and operate a pipeline to convey the magnetite slurry to Utah Point, Port Hedland. Inquiry under s46 in regard to changing the implementation conditions of Ministerial Statement 794 . Read more...