Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Iron Ore (4) Apply Iron Ore filter
  • Coal (1) Apply Coal filter
  • Infrastructure (1) Apply Infrastructure filter
  • Land use (1) Apply Land use filter
  • Power generation (1) Apply Power generation filter
  • Rare earth elements (1) Apply Rare earth elements filter

Filter by current status:

  • Ministerial Statement published (5) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (2) Apply Decision on whether to assess has been published filter
  • Minister determined that the proposal should not be implemented (1) Apply Minister determined that the proposal should not be implemented filter

Filter by preliminary environmental factors:

  • Flora and Vegetation (4) Apply Flora and Vegetation filter
  • Terrestrial Fauna (4) Apply Terrestrial Fauna filter
  • 37 (2) Apply 37 filter
  • Hydrological Processes (2) Apply Hydrological Processes filter
  • Coastal Processes (1) Apply Coastal Processes filter
  • Landforms (1) Apply Landforms filter
  • Subterranean Fauna (1) Apply Subterranean Fauna filter
  • Terrestrial Environmental Quality (1) Apply Terrestrial Environmental Quality filter

Filter by Proponent:

  • Aviva (1) Apply Aviva filter
  • Central West Coal (1) Apply Central West Coal filter
  • City of Geraldton (1) Apply City of Geraldton filter
  • Crosslands Resources Ltd (1) Apply Crosslands Resources Ltd filter
  • Extension Hill Pty Ltd (1) Apply Extension Hill Pty Ltd filter
  • Karara Mining Ltd (1) Apply Karara Mining Ltd filter
  • Mount Gibson Mining Limited and Extension Hill Pty Ltd (1) Apply Mount Gibson Mining Limited and Extension Hill Pty Ltd filter
  • Reed Resources Ltd (1) Apply Reed Resources Ltd filter
  • Verve Energy (1) Apply Verve Energy filter

Filter by region:

  • (-) Remove Mid West filter Mid West

Filter by last updated:

  • (-) Remove 2012 filter 2012
  1. Home
  2. Proposal search
  3. 2012
  4. Mid West

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Barrambie Vanadium Project

Last updated: October 22, 2012

To develop an open-cut vanadium mine and process plant at Barrambie, 75 kilometres north-west of the Sandstone townsite and 116 kilometres south-east of Meekatharra Read more...

Warradarge Wind Farm

Last updated: October 18, 2012

The proposal is for construction of up to 100 wind turbines each up to 152 metres (m) high, with a capacity of up to 250 Megawatts and all associated infrastructure: electricity transformers; underground cabling; access tracks, all weather access to Garibaldi Willis Road; crane hardstands; a substation compound including a metering building, site office and workshop and a communication mast. The proposal location is 15 km north-east of Warradarge, Shire of Coorow and Shire of Carnamah.  Read more...

Central West Coal Project

Last updated: May 22, 2012

The project site is located approximately 15 kilometres south of Eneabba in the Shires of Coorow and Carnamah, Western Australia. The CWC Project involves open cut mining and supply of approximately 75 Mt of sub-bituminous grade coal to the proposed Coolimba Power Station at a rate of 2 to 2.5 Mtpa over 30 years. The South Eneabba Nature Reserve is at the southern end, east of the proposed mine, while the Lake Logue Nature Reserve is towards the northern end and on the western side of the... Read more...

Karara Iron Ore Project, 215 km east-south-east of Geraldton and 320 km north-north-east of Perth, Shire of Perenjori (s. 46)

Last updated: May 4, 2012

Inquiry under s46 regarding amendments to the conditions of Ministerial Statement 805 . Read more...

Beresford Foreshore Coastal Protection Project

Last updated: March 5, 2012

The Beresford foreshore, Geraldton is an important link between the amenity precincts of Batavia Coast Marina and Bluff Point. However, it is a highly modified section of coastline that was formally a railway reserve. lt is impacted by coastal erosion and the current coastal protection measures are deemed to be inadequate, especially in the context of sea-level rise predictions. This proposal is to progress the preferred coastal protection option coming out of the Coastal Processes Study and... Read more...

Mt Gibson Iron Ore Mine and Infrastructure Project (s. 46)

Last updated: February 28, 2012

The proposal is to mine and process iron ore from Extension Hill and Extension Hill North, within the Mt Gibson Ranges, construct a pipeline to transport the magnetite slurry to Geraldton Port, and construct infrastructure at the port to strip the ore from the slurry for export. Inquiry under s46 in regard to amending the conditions of Ministerial Statement 753 . Read more...

Mount Gibson Iron Ore Mine and Infrastructure Project

Last updated: February 28, 2012

Mount Gibson Mining Limited proposes to mine and process iron ore (hematite and magnetite) from Extension Hill and Extension Hill North. The proposal also includes the construction of a pipeline to transport the magnetite slurry to Geraldton Port, and infrastructure at the port to strip the ore from the slurry for export. The operation will yield approximately 13 million tonnes of hematite over 8 years and 230 million tonnes of magnetite over 20 years. Extension Hill and Extension Hill North... Read more...

Jack Hills Expansion Project

Last updated: January 9, 2012

The proposal consists of a designated mining area containing two open pits, integrated waste and tailings landform, ore beneficiating plant and workshops, a combined gas pipeline spur and water pipe corridor, a services (possible water, gas, power transmission) corridor to Weld Range, the Byro Sub-basin Borefield and the Murchison Palaeochannel Borefield, a power station, airstrip, village and ancillaries. The Jack Hills Expansion Project is contiguous with the Stage 1 mine. Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.