This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: July 31, 2002
The Geraldton Port Authority (GPA) proposes to upgrade the Port of Geraldton (otherwise known as the Port Enhancement Project (PEP)) and undertake preparatory works for the Town Beach Foreshore Redevelopment Project. The objective of the PEP is to enable vessels to sail from the port fully laden. Read more...Last updated: July 10, 2001
Inquiry under section 46 of the, Environmental Protection Act 1986, to increase to phosphorus discharge limit Read more...Last updated: June 22, 2001
Proposal by the Water Corporation to construct and operate a seawater supply and desalination system on the Burrup Peninsula. Read more...Last updated: January 24, 2001
The proposal is for a regional waste processing facility within the Kwinana Heavy Industrial Estate. The site is located on the Swan Coastal Plain approximately 30 kilometres south west of the Perth Central Business District and 3 kilometres north-west of the Town of Kwinana. The site is a large undeveloped piece of land which is adjacent to the British Petroleum (BP) refinery. The nearest residences are located to the north east in Hope Valley (approximately 2.6 kilometres) and to the east in... Read more...Last updated: September 18, 2000
Proposal to construct a gas to synthetics plant on the Burrup peninsula. Read more...Last updated: July 13, 2000
The Proposal is for the construction and operation of a facility for the export of iron ore. The facility would consist of three separate parts; a marine component, a terrestrial component and a rail component- Constructed and operated by FPA, KIPL and Westrail respectively. Read more...Last updated: December 16, 1999
Proposal by LandCorp to dredge, reclaim land and create up to three level lots at Lots 165-168, Henderson Road Cockburn for use by shipbuilding industry within the Northern Harbour of Jervoice Bay, which may include a ship-lift facility. Read more...Last updated: December 15, 1999
The proposal is for the stages 1 and 2 of the development of the Busselton Wastewater Treatment Plant, Queen Elizabeth Avenue, Busselton, to an output of 6,750 cubic metres per day, and disposal of treated wastewater from the plant via an onsite wetland to the Vasse Agricultural drain and consequently to the Vasse Diversion Drain. Read more...Last updated: June 17, 1999
Proposal to construct additional crystallizer ponds at the existing salt works in Useless Loop, Shark Bay. Read more...Last updated: June 14, 1999
The proposal is to construct a new series (F series) of crystallizer ponds at the northern edge of the existing Shark Bay Salt crystallizers in Useless Loop, Shark Bay. Construction of the new series of ponds will enclose approximately 125 hectares of shallow marine environment up to the boundary of Mining Lease 260 SA, of which some 60 hectares is seagrass. Read more...Last updated: June 4, 1999
Proposal by Kimberley Prawn Company to establish a prawn farm on the tidal mud flats of Doctor's Creek near Derby. Read more...Last updated: March 29, 1999
The proposal is for the expansion of the existing titanium dioxide plant, to increase the plant production capacity from 79,000 tpa of finished titanium dioxide pigment, at the Kemerton Industrial Park, within the shire of Harvey, 140 kilometres south of Perth, 17 kilometres north east of Bunbury and 4 kilometres east of Leschenault Estuary. Read more...Last updated: February 10, 1999
Dredging of approximately 9.1 million tonnes of shellsand from two zones on Success Bank, Owen Anchorage over the period 1997 to approximately the end of 2002. Shellsand of high quality, about 92% calcium carbonate is used by Cockburn Cement Ltd (the proponent) for the manufacture of quicklime and cement products. Read more...Last updated: January 18, 1999
Apache Northwest Pty Ltd proposes to drill two exploration wells, Chelonia-1 and -2 in Permit Area EP 342 which is located at the head of Exmouth Gulf. Both wells will have the same surface location, situated outside the Ningaloo Marine Park, approximately 100 m from the boundary and 4 km to the SSW of South Muiron Island. Read more...Last updated: August 7, 1998
Inquiry under s46 regarding proposed modifications to the Exmouth Boat Harbour Development Project. Read more...Last updated: June 8, 1998
Proposal to develop a land-based marine shell breeding facility and residence on Downes Island approximately seven kilometres west of Port Hedland. Trochus shells (, Trochus niloticu, ), Pearl oysters (, Pteria penguin, ,, Pinctada margaritifera, ,, P. albina, ) and a range of other native Australian shells will be bred at the facility. Trochus and pearl oysters will be grown-out off-site. Read more...Last updated: January 19, 1998
The proposal is to construct and operate a barge loading facility south of Mowbowra Creek in the Shire of Exmouth for the export of limestone proposed to be mined from the nearby Whitecrest Limestone Mine. The proponent has indicated that a future proposal to develop a larger shipping facility, including a dredged shipping approach, is envisaged. Such a proposal is not considered as part of this assessment, and will require further environmental impact assessment at a later stage should the... Read more...Last updated: November 6, 1997
The proposal includes the following key features: construction and operation of a metallurgical limestone mine; production of quicklime at a quicklime plant to be located at the mine; road transportation of limestone and quicklime through Exmouth; and shipping of limestone and quicklime from the Point Murat jetty. Read more...Last updated: June 30, 1997
The proposal is to increase the production capacity of Tiwest's titanium dioxide plant at Kwinana. The proposal is to modify/expand the existing plant to allow an increase in production capacity from 80,000 tonne per annum (tpa) to 180,00 tpa of titanium dioxide pigment in three notional stages: Stage I: increase to 120,000 tpa, Stage 2: increase to 165,000 tpa and Stage 3: increase to nominally 180,000 tpa. The first and second stages of the expansion wilI require major modifications to... Read more...Last updated: June 19, 1997
The proposal is to carry out a program of appraisal drilling on the Wonnich petroleum field within permit area TP/8. Read more...