Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Iron Ore (127) Apply Iron Ore filter
  • Infrastructure (97) Apply Infrastructure filter
  • Oil and gas (42) Apply Oil and gas filter
  • Industrial (15) Apply Industrial filter
  • Salt (7) Apply Salt filter
  • Gold (4) Apply Gold filter
  • Sand, rock, gravel and clay (4) Apply Sand, rock, gravel and clay filter
  • Copper (3) Apply Copper filter
  • Land use (3) Apply Land use filter
  • Waste management (3) Apply Waste management filter
  • Aquaculture (2) Apply Aquaculture filter
  • Molybdenum (2) Apply Molybdenum filter
  • Power generation (2) Apply Power generation filter
  • Utilities (2) Apply Utilities filter
  • Mineral sands (1) Apply Mineral sands filter
  • Uranium (1) Apply Uranium filter

Filter by current status:

  • (-) Remove Ministerial Statement published filter Ministerial Statement published

Filter by relevant environmental factors:

  • Flora and Vegetation (141) Apply Flora and Vegetation filter
  • Terrestrial Fauna (103) Apply Terrestrial Fauna filter
  • Social Surroundings (75) Apply Social Surroundings filter
  • Hydrological Processes (70) Apply Hydrological Processes filter
  • Inland Waters Environmental Quality (60) Apply Inland Waters Environmental Quality filter
  • 37 (53) Apply 37 filter
  • Subterranean Fauna (48) Apply Subterranean Fauna filter
  • Marine Environmental Quality (46) Apply Marine Environmental Quality filter
  • Benthic Communities and Habitats (36) Apply Benthic Communities and Habitats filter
  • Marine Fauna (28) Apply Marine Fauna filter
  • Terrestrial Environmental Quality (18) Apply Terrestrial Environmental Quality filter
  • Coastal Processes (16) Apply Coastal Processes filter
  • Landforms (14) Apply Landforms filter
  • Inland Waters (13) Apply Inland Waters filter
  • People (8) Apply People filter
  • 3144 (5) Apply 3144 filter
  • Human Health (1) Apply Human Health filter
  • Water (1) Apply Water filter

Filter by Proponent:

  • BHP Billiton Iron Ore Pty Ltd (21) Apply BHP Billiton Iron Ore Pty Ltd filter
  • Hamersley Iron Pty Limited (15) Apply Hamersley Iron Pty Limited filter
  • Chevron Australia Pty Ltd (10) Apply Chevron Australia Pty Ltd filter
  • Fortescue Metals Group Limited (9) Apply Fortescue Metals Group Limited filter
  • Hamersley Iron Pty Ltd (9) Apply Hamersley Iron Pty Ltd filter
  • Roy Hill Infrastructure Pty Ltd (6) Apply Roy Hill Infrastructure Pty Ltd filter
  • Roy Hill Iron Ore Pty Ltd (6) Apply Roy Hill Iron Ore Pty Ltd filter
  • BHP Iron Ore Pty Ltd (5) Apply BHP Iron Ore Pty Ltd filter
  • API Management Pty Limited (4) Apply API Management Pty Limited filter
  • Forge Resources Swan Pty Ltd (4) Apply Forge Resources Swan Pty Ltd filter
  • Fortescue Metals Group Ltd (4) Apply Fortescue Metals Group Ltd filter
  • Robe River Mining Co. Pty. Ltd (4) Apply Robe River Mining Co. Pty. Ltd filter
  • Woodside Energy Ltd (4) Apply Woodside Energy Ltd filter
  • Apache Northwest Pty Ltd (3) Apply Apache Northwest Pty Ltd filter
  • Hope Downs Management Services Pty Ltd (3) Apply Hope Downs Management Services Pty Ltd filter
  • Robe River Iron Associates (3) Apply Robe River Iron Associates filter
  • Robe River Mining Co Pty Ltd (3) Apply Robe River Mining Co Pty Ltd filter
  • Robe River Mining Company Pty Ltd (3) Apply Robe River Mining Company Pty Ltd filter
  • West Australian Petroleum Pty Ltd (3) Apply West Australian Petroleum Pty Ltd filter
  • Apache Energy Ltd (2) Apply Apache Energy Ltd filter
  • Atlas Iron Pty. Ltd. (2) Apply Atlas Iron Pty. Ltd. filter
  • Australian United Steel Industry Pty Limited (2) Apply Australian United Steel Industry Pty Limited filter
  • BHP Iron Ore (Jimblebar) Pty Ltd (2) Apply BHP Iron Ore (Jimblebar) Pty Ltd filter
  • Birla (Nifty) Pty Ltd (2) Apply Birla (Nifty) Pty Ltd filter
  • Brockman Iron Pty Ltd (2) Apply Brockman Iron Pty Ltd filter
  • Bungaroo South Pty Ltd (2) Apply Bungaroo South Pty Ltd filter
  • Dampier Port Authority (2) Apply Dampier Port Authority filter
  • Greatland Pty Ltd (2) Apply Greatland Pty Ltd filter
  • Leichhardt Industrials Pty Ltd (2) Apply Leichhardt Industrials Pty Ltd filter
  • Main Roads Western Australia (2) Apply Main Roads Western Australia filter
  • Mardie Minerals Pty Ltd (2) Apply Mardie Minerals Pty Ltd filter
  • Mineralogy Pty Ltd (2) Apply Mineralogy Pty Ltd filter
  • Moly Metals Australia Pty Ltd (2) Apply Moly Metals Australia Pty Ltd filter
  • New Energy Corporation Pty Ltd (2) Apply New Energy Corporation Pty Ltd filter
  • Onslow Iron Pty Ltd and API Management Pty Limited (2) Apply Onslow Iron Pty Ltd and API Management Pty Limited filter
  • Onslow Salt Pty Ltd (2) Apply Onslow Salt Pty Ltd filter
  • Pilbara Iron Pty Ltd (2) Apply Pilbara Iron Pty Ltd filter
  • PIOP Mine Co NL (2) Apply PIOP Mine Co NL filter
  • Port Hedland Port Authority (2) Apply Port Hedland Port Authority filter
  • Sino Iron Pty Ltd and Korean Steel Pty Ltd (2) Apply Sino Iron Pty Ltd and Korean Steel Pty Ltd filter
  • Water Corporation (2) Apply Water Corporation filter
  • Western Mining Corporation Ltd (2) Apply Western Mining Corporation Ltd filter
  • Woodside Offshore Petroleum Pty Ltd (2) Apply Woodside Offshore Petroleum Pty Ltd filter
  • Aurora Algae Pty Ltd (1) Apply Aurora Algae Pty Ltd filter
  • Australian Aboriginal Mining Corporation Pty Ltd (1) Apply Australian Aboriginal Mining Corporation Pty Ltd filter
  • FMG (1) Apply FMG filter
  • Forge Resources (1) Apply Forge Resources filter
  • Fortescue Metals Group (1) Apply Fortescue Metals Group filter
  • Hamersley HMS Pty Limited (1) Apply Hamersley HMS Pty Limited filter
  • Polaris Metals Pty Ltd (1) Apply Polaris Metals Pty Ltd filter

Filter by region:

  • (-) Remove Pilbara filter Pilbara
  • Kimberley (2) Apply Kimberley filter
  • Cocos Islands, Shire of (1) Apply Cocos Islands, Shire of filter
  • Gascoyne (1) Apply Gascoyne filter
  • Goldfields Esperance (1) Apply Goldfields Esperance filter
  • Great Southern (1) Apply Great Southern filter
  • Mid West (1) Apply Mid West filter
  • Peel (1) Apply Peel filter
  • Perth (1) Apply Perth filter
  • South West (1) Apply South West filter
  • Wheatbelt (1) Apply Wheatbelt filter
  1. Home
  2. Proposal search
  3. Pilbara
  4. Ministerial Statement published

Orebody 24/25 Upgrade Project

Last updated: July 8, 2010

BHP Billiton Iron Ore is proposing to develop the Orebody 24 (OB24) deposit located north of Orebody 25 (OB25) Mine, and approximately 10 km north-east of the town of Newman in the Pilbara Region. New and existing OB25 infrastructure would be utilised. Read more...

Iron ore mine, downstream processing (direct - reduced hot briquetted iron) and port construction, Cape Preston, Pilbara (s46)

Last updated: December 23, 2009

The construction and operation of a 44.8 million tonnes per annum iron ore mine, power station, desalination plant, processing plant and accommodation and port facilities in the Cape Preston area as documented in Schedule 1 of Statement 635. The processing plant will produce pelletised, direct-reduced iron and hot-briquetted iron. Inquiry under s46 into changing the conditions of Ministerial Statement 635. Read more...

Balmoral South Iron Ore Project, Cape Preston, WA

Last updated: December 23, 2009

Proposal to develop and operate an open-cut iron ore mine with infrastructure and utilities located in the Cape Preston region, 80 km south-west of Karratha by Mineralogy Pty Ltd. Read more...

Chichester Rail Deviation

Last updated: December 4, 2009

BHP Billiton Iron Ore is proposing to construct 23 kilometres of dual track railway and associated rail infrastructure within the Chichester ranges, approximately 220 kilometres south of Port Hedland. The proposal includes clearing of 400 hectares of vegetation. The required water supply would be approximately 1000 kL/day to be sourced from two existing bores. The proposal also involves the construction of communications cabling, a communications tower, level crossings, signalling, access... Read more...

Wheelarra Hill Iron Ore Mine Modification

Last updated: October 12, 2009

The proposal is for an increase in the mining rate from approximately 12 Mtpa to 45 Mtpa. The Wheelarra Hill Mine located approximately 40 km from Newman. The proposal includes clearing of an additional 580 ha of vegetation. The required water supply would increase from 3,750 kL per day to 11,800 kL per day. The proposal also involves the construction of a new rail spur and loop and Train Load-out facilities as well as the upgrading of existing 66 kV power line and installation of a second line. Read more...

Pardoo Iron Ore Mine (s. 46)

Last updated: July 20, 2009

The proposal is to develop and operate a direct shipping iron ore project in the Pilbara, as allowed in Ministerial Statement 775 . The project involves the open-cut mining of eight small pits approximately 70 kilometres east of Port Hedland to obtain direct shipping ore quality haematite. Annual ore production will be 1.5 million tonnes. This assessment is for the proposal under s46 of the EP Act to remove condition 8-1 related to troglofauna sampling. Read more...

Balla Balla Magnetite Project

Last updated: April 28, 2009

The proponent proposes to mine up to 10.1 Mtpa of magnetite ore to produce 6 Mtpa of ore concentrate over a 15 year mine life. The magnetite concentrate would be conveyed to Port Hedland from the mine via a 110 km slurry pipeline located alongside the existing Pilbara Energy Pipeline (PEPL). The concentrate would be dewatered at a purpose-built facility located at Utah Point in the Port Hedland Port area, prior to shipping overseas, where it would be used predominantly in steel manufacture. Read more...

Brockman Syncline 4 Iron Ore Project

Last updated: December 17, 2008

The proposal is to develop a new iron ore mine approximately 60 kilometres west-north-west of Tom Price and 25 kilometres south-west of the existing Brockman 2 mine. The major components of the project include: Three new mine pits- with approximately 20% of the orebody occurring below the water table; Dry processing plant- including crushers, overland conveyor and screens; this will be located to the north of the pits running east/west to the rail loop; Associated mine infrastructure- this... Read more...

Spinifex Ridge Molybdenum Project

Last updated: August 5, 2008

To develop an open pit mine and process 20 million tonnes per annum (Mtpa) of ore to produce approximately 23,000 tonnes per annum (tpa) of molybdenum concentrate and approximately 48,000 tpa of copper concentrate. Read more...

Dampier Port Increase in Throughput to 145 Mtpa

Last updated: June 12, 2008

Proposal by Hamersley Iron Pty Limited (the proponent) to increase the throughput of iron ore at its Dampier Port operations from 120 million tonnes per annum (Mtpa) to 145Mtpa. Read more...

Materials Stockpiling and Handling Facilities, Cape Preston

Last updated: March 20, 2008

The proposal is to establish materials stockpiling and handling facilities with a capacity of approximately 4 million tonnes at Cape Preston, approximately 60km west-south-west of Dampier. Read more...

Proposed Mesa J iron ore development - Pannawonica

Last updated: October 30, 2007

The proposed Mesa J mining development is a continuation of the sequential development of proven iron ore reserves along the Robe River Valley. This proposal relates to an iron ore mining operation of 600 million tonnes over a period of approximately 20 years. The major components of the proposed development include: Site preparation, including overburden removal and stockpiling of ore which will be extracted along the rail alignment to be constructed on the eastern escarpment of the new Mesa J... Read more...

Dredging Program for the Cape Lambert Port Upgrade

Last updated: July 12, 2007

A capital and maintenance dredging program to remove up to 2.5 million cubic metres of marine sediment from within State Waters adjacent to Cape Lambert, and disposal of up to 2 million cubic metres of uncontaminated dredge material to Spoil Ground 1. Read more...

Dredging Program - Dampier Port Upgrade

Last updated: July 2, 2007

The main features of the proposal are to; extend the existing northern and southern berth pockets at the Parker Point wharf and to enable four vessels (two on the north side and two on the south side) to moor alongside the wharf at any one time, although only two vessels can be loaded at any one time; widen and deepen the southern swing basin to provide safe approaches for 220,000 DWT vessels using the southern berths; widen the northern approach route to provide safe navigation for arriving... Read more...

Dredging Program Dampier Port Upgrade to a Throughput Capacity of 120 Million Tonnes Per Annum (s46) [1646]

Last updated: December 12, 2006

Proposal to expand iron ore operations at Dampier Port, which includes Parker Point and East Intercourse Island facilities to a total of 120 Megatonnes per annum by greater utilisation of existing equipment, and an increase in rail transport and shipping movements, as documented in schedule 1 of this statement. Read more...

Development of Industrial Land on the Burrup Peninsula for Future Gas Development

Last updated: November 29, 2006

This proposal is for the Development of Industrial Land on the Burrup Peninsula. The proposed site is designated Industrial Lease Area A (Site A). Approval would allow Woodside Energy Ltd to undertake limited site preparation activities for the future installation of infrastructure, such as LNG and condensate storage tanks, which would be needed should the proposed Pluto LNG Development be allowed to proceed. Read more...

Wheelarra Hill Iron Ore Mine Extension

Last updated: November 17, 2006

The proposal is for the remaining life of the mine (50+ years), located west of Jimblebar Creek on Mining Lease 266SA. It entails increasing the iron ore production rate at the mine from 8 million tonnes per annum (Mtpa) to approximately 12Mtpa, and the mining of the currently undeveloped deposits on either side of the existing operation, including both in-situ hard rock and detrital ores. Approximately 600 million tonnes of Marra Mamba iron ore have been identified within the mining envelope.... Read more...

Northern Looping Project, Loops 1 to 9 Karratha to Bullsbrook

Last updated: June 29, 2006

The proponent proposes to construct and operate a number of looping sections adjacent (and connected) to the existing underground gas transmission pipeline within the DBNGP corridor. There are nine separate looping sections proposed from CS 1 south of Karratha, to CS 9, north of Gingin. Looping is a process of duplicating an existing pipeline between compressor stations for a certain distance. Once the specified distance is reached, it then ties back to the parallel pipeline. This design... Read more...

Western Extension of Nickol Bay Quarry

Last updated: February 13, 2006

Readymix Holdings Pty Limited proposes to extend its Nickol Bay quarry, located at the southern end of the Burrup Peninsula near Dampier, by an area of approximately 5.2 hectares. Read more...

Orebody 25 Extension

Last updated: January 24, 2006

Proposal by BHP Billiton Iron Ore Pty Ltd (BHPBIO) to expand existing mining operations at Orebody 25 Mine (OB25), within mining lease (ML) 244SA. Read more...

Pages

  • « first
  • ‹ previous
  • …
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.