BHP Billiton Iron Ore is proposing to develop the Orebody 24 (OB24) deposit located north of Orebody 25 (OB25) Mine, and approximately 10 km north-east of the town of Newman in the Pilbara Region. New and existing OB25 infrastructure would be utilised. Read more...Last updated: December 23, 2009
The construction and operation of a 44.8 million tonnes per annum iron ore mine, power station, desalination plant, processing plant and accommodation and port facilities in the Cape Preston area as documented in Schedule 1 of Statement 635. The processing plant will produce pelletised, direct-reduced iron and hot-briquetted iron. Inquiry under s46 into changing the conditions of Ministerial Statement 635. Read more...Last updated: December 23, 2009
Proposal to develop and operate an open-cut iron ore mine with infrastructure and utilities located in the Cape Preston region, 80 km south-west of Karratha by Mineralogy Pty Ltd. Read more...Last updated: December 4, 2009
BHP Billiton Iron Ore is proposing to construct 23 kilometres of dual track railway and associated rail infrastructure within the Chichester ranges, approximately 220 kilometres south of Port Hedland. The proposal includes clearing of 400 hectares of vegetation. The required water supply would be approximately 1000 kL/day to be sourced from two existing bores. The proposal also involves the construction of communications cabling, a communications tower, level crossings, signalling, access... Read more...Last updated: October 12, 2009
The proposal is for an increase in the mining rate from approximately 12 Mtpa to 45 Mtpa. The Wheelarra Hill Mine located approximately 40 km from Newman. The proposal includes clearing of an additional 580 ha of vegetation. The required water supply would increase from 3,750 kL per day to 11,800 kL per day. The proposal also involves the construction of a new rail spur and loop and Train Load-out facilities as well as the upgrading of existing 66 kV power line and installation of a second line. Read more...Last updated: July 20, 2009
The proposal is to develop and operate a direct shipping iron ore project in the Pilbara, as allowed in Ministerial Statement 775 . The project involves the open-cut mining of eight small pits approximately 70 kilometres east of Port Hedland to obtain direct shipping ore quality haematite. Annual ore production will be 1.5 million tonnes. This assessment is for the proposal under s46 of the EP Act to remove condition 8-1 related to troglofauna sampling. Read more...Last updated: April 28, 2009
The proponent proposes to mine up to 10.1 Mtpa of magnetite ore to produce 6 Mtpa of ore concentrate over a 15 year mine life. The magnetite concentrate would be conveyed to Port Hedland from the mine via a 110 km slurry pipeline located alongside the existing Pilbara Energy Pipeline (PEPL). The concentrate would be dewatered at a purpose-built facility located at Utah Point in the Port Hedland Port area, prior to shipping overseas, where it would be used predominantly in steel manufacture. Read more...Last updated: December 17, 2008
The proposal is to develop a new iron ore mine approximately 60 kilometres west-north-west of Tom Price and 25 kilometres south-west of the existing Brockman 2 mine. The major components of the project include: Three new mine pits- with approximately 20% of the orebody occurring below the water table; Dry processing plant- including crushers, overland conveyor and screens; this will be located to the north of the pits running east/west to the rail loop; Associated mine infrastructure- this... Read more...Last updated: August 5, 2008
To develop an open pit mine and process 20 million tonnes per annum (Mtpa) of ore to produce approximately 23,000 tonnes per annum (tpa) of molybdenum concentrate and approximately 48,000 tpa of copper concentrate. Read more...Last updated: June 12, 2008
Proposal by Hamersley Iron Pty Limited (the proponent) to increase the throughput of iron ore at its Dampier Port operations from 120 million tonnes per annum (Mtpa) to 145Mtpa. Read more...Last updated: March 20, 2008
The proposal is to establish materials stockpiling and handling facilities with a capacity of approximately 4 million tonnes at Cape Preston, approximately 60km west-south-west of Dampier. Read more...Last updated: October 30, 2007
The proposed Mesa J mining development is a continuation of the sequential development of proven iron ore reserves along the Robe River Valley. This proposal relates to an iron ore mining operation of 600 million tonnes over a period of approximately 20 years. The major components of the proposed development include: Site preparation, including overburden removal and stockpiling of ore which will be extracted along the rail alignment to be constructed on the eastern escarpment of the new Mesa J... Read more...Last updated: July 12, 2007
A capital and maintenance dredging program to remove up to 2.5 million cubic metres of marine sediment from within State Waters adjacent to Cape Lambert, and disposal of up to 2 million cubic metres of uncontaminated dredge material to Spoil Ground 1. Read more...Last updated: July 2, 2007
The main features of the proposal are to; extend the existing northern and southern berth pockets at the Parker Point wharf and to enable four vessels (two on the north side and two on the south side) to moor alongside the wharf at any one time, although only two vessels can be loaded at any one time; widen and deepen the southern swing basin to provide safe approaches for 220,000 DWT vessels using the southern berths; widen the northern approach route to provide safe navigation for arriving... Read more...Last updated: December 12, 2006
Proposal to expand iron ore operations at Dampier Port, which includes Parker Point and East Intercourse Island facilities to a total of 120 Megatonnes per annum by greater utilisation of existing equipment, and an increase in rail transport and shipping movements, as documented in schedule 1 of this statement. Read more...Last updated: November 29, 2006
This proposal is for the Development of Industrial Land on the Burrup Peninsula. The proposed site is designated Industrial Lease Area A (Site A). Approval would allow Woodside Energy Ltd to undertake limited site preparation activities for the future installation of infrastructure, such as LNG and condensate storage tanks, which would be needed should the proposed Pluto LNG Development be allowed to proceed. Read more...Last updated: November 17, 2006
The proposal is for the remaining life of the mine (50+ years), located west of Jimblebar Creek on Mining Lease 266SA. It entails increasing the iron ore production rate at the mine from 8 million tonnes per annum (Mtpa) to approximately 12Mtpa, and the mining of the currently undeveloped deposits on either side of the existing operation, including both in-situ hard rock and detrital ores. Approximately 600 million tonnes of Marra Mamba iron ore have been identified within the mining envelope.... Read more...Last updated: June 29, 2006
The proponent proposes to construct and operate a number of looping sections adjacent (and connected) to the existing underground gas transmission pipeline within the DBNGP corridor. There are nine separate looping sections proposed from CS 1 south of Karratha, to CS 9, north of Gingin. Looping is a process of duplicating an existing pipeline between compressor stations for a certain distance. Once the specified distance is reached, it then ties back to the parallel pipeline. This design... Read more...Last updated: February 13, 2006
Readymix Holdings Pty Limited proposes to extend its Nickol Bay quarry, located at the southern end of the Burrup Peninsula near Dampier, by an area of approximately 5.2 hectares. Read more...Last updated: January 24, 2006
Proposal by BHP Billiton Iron Ore Pty Ltd (BHPBIO) to expand existing mining operations at Orebody 25 Mine (OB25), within mining lease (ML) 244SA. Read more...