Inquiry under s46 regarding proposed amendments to the Onslow Solar Salt Project, the subject of Ministerial Statement 401 . The changes to the project are to allow the start-up production to increase from 1.5 Mtpa to 2.5 Mtpa. Modifications proposed include: expansion of condenser pond area from 70 km 2 to 80 km 2 ; expansion of the crystalliser pond area from 7.2 km 2 to 8.2 km 2 ; area for storage of bitterns; extension of the jetty structure by 300 m; extension of the dredged approach... Read more...Last updated: January 30, 2013
The proposal is to construct and operate a multi-user deep-water port with iron ore stockpiling, transfer and ship loading facilities and ancillary infrastructure at Anketell Point. The proposal allows for facilities required by the Proponent and future third parties to be developed. Read more...Last updated: January 22, 2013
The proposal is for the construction of a deepwater port. Inquiry under s46 regarding changing condition 9 of Ministerial Statement 469 . Read more...Last updated: December 10, 2012
The proposal is for the marine component of the Perth Wave Energy Project (PWEP) which involves the installation of five 11 metre diameter CETO (Carnegie's wave energy technology) units 3km south west of Garden Island and laying two pipelines to transfer the energy harnessed by the CETO units to an onshore power generation facility located on Garden Island. Read more...Last updated: February 28, 2012
The proposal is to construct and operate the Outer Harbour Development which includes landside and marine infrastructure for the handling and export of iron ore from BHPBIO’s operations. The Boodarie stockyard infrastructure will supply an overland conveyor to a transfer pad located to the west of the existing Finucane Island facilities. A piled jetty will transfer ore material to the ship loaders located at the piled wharf. Read more...Last updated: January 17, 2012
The proposal is to construct a sub sea pipeline, onshore gas treatment and compression plant, and sales gas pipeline. The subsea pipeline from the Macedon Gas Field (100 kilometres west of Onslow) connects to the onshore gas treatment and compression plant at Ashburton North (15 kilometres southwest of Onslow). The sales gas pipeline connects the onshore facility to the Dampier to Bunbury Natural Gas (DBNG) Pipeline. Read more...Last updated: January 5, 2012
The proposal is to increase production of barramundi from 1000 tpa to 2000 tpa at its sea cage aquaculture site in Cone Bay which is located approximately 215 km north north east of Broome in the Buccaneer Archipelago and forms part of the Yampi Sound in the Kimberley region of Western Australia. The proponent has a 21 year Aquaculture Lease (AL0020) over its existing aquaculture site (Aquaculture Licence No. 1465) which is approximately 700 hectares. Read more...Last updated: June 30, 2010
The proposal is to construct and operate a minimum 50 GL/annum and up to 100 GL/annum desalination plant on Lots 32 and 33, and Part Lot 8 Taranto Road, Binningup; marine inlet/outlet pipes; and a water supply pipeline to transport potable water to the Integrated Water Supply Scheme via a storage facility near Harvey. Read more...Last updated: February 9, 2010
Straits Salt proposes to construct and operate a 4.2 million tonne per annum solar salt farm on the east coast of Exmouth Gulf. Read more...Last updated: December 1, 2009
The proposal is to construct a deepwater port to service fully loaded Panamax sized vessels (65 000 DWT) at Oakajee, approximately 23 kilometres north of Geraldton. Three site locations (north, south and central) and two different design options (inshore and off-shore) were considered in developing the proposal. The design option favoured by the proponent is an in-shore port design at the northern sector. The port study area is approximately 23 kilometres north of Geraldton. The port will... Read more...Last updated: March 20, 2008
The proposal is to establish materials stockpiling and handling facilities with a capacity of approximately 4 million tonnes at Cape Preston, approximately 60km west-south-west of Dampier. Read more...Last updated: August 31, 2007
Proposal by Woodside Energy Ltd. to undertake a three dimensional (3D) seismic survey within State waters at Scott Reef. The proponent has prepared the EPS document which accompanies this report (Woodside, 2007). Read more...Last updated: July 12, 2007
A capital and maintenance dredging program to remove up to 2.5 million cubic metres of marine sediment from within State Waters adjacent to Cape Lambert, and disposal of up to 2 million cubic metres of uncontaminated dredge material to Spoil Ground 1. Read more...Last updated: November 17, 2004
The Environmental Protection Authority (EPA) has been required by the Minister for the Environment to provide further assessment on the proposal by James Point Pty Ltd (JPPL) to construct and operate a private container and general cargo Port (referred to as the Stage 1 Port) to the north of James Point in Cockburn Sound. See the original assessment here . Read more...Last updated: July 11, 2003
The proposal is for the first stage of a Coral Coast Resort (CCR), which includes tourist, residential and incidental commercial facilities centred around an inland marina, at the site called Mauds Landing. The CCR proposal envisages the establishment, in the first stage, of a marina, a caravan park, an interpretative centre, a back-packers facility, stage one of a resort complex, provision of utilities infrastructure and the preparation of land with services for sale at a later date. The CCR... Read more...Last updated: May 26, 2003
The proposal involves the construction and operation of a 30 GL desalination plant at one of two locations in the Kwinana Industrial Area. The alternative sites are at the Kwinana Power Station (KPS) or on the corner of Patterson and Office Roads, East Rockingham. Read more...Last updated: December 20, 2002
The proposal is for construction and operation of a methanol plant of 1.05 million tonnes per annum (Mt/a) nominal capacity, at Withnell East industrial area on the Burrup Peninsula The proposal includes the installation of a gas supply pipeline, product pipeline, seawater supply pipeline and wastewater discharge pipeline to be situated in infrastructure corridors for which the Department of Mineral and Petroleum Resources (MPR) will be proponent. The plant footprint will occupy approximately... Read more...Last updated: July 31, 2002
The Geraldton Port Authority (GPA) proposes to upgrade the Port of Geraldton (otherwise known as the Port Enhancement Project (PEP)) and undertake preparatory works for the Town Beach Foreshore Redevelopment Project. The objective of the PEP is to enable vessels to sail from the port fully laden. Read more...Last updated: February 11, 2000
Woodside Energy Limited proposes to construct and operate additional Liquefied Natural Gas (LNG) processing trains, the current proposal being for two trains with a total additional capacity of 8 Mtpa at its onshore gas plant on the Burrup. Read more...Last updated: February 10, 1999
Dredging of approximately 9.1 million tonnes of shellsand from two zones on Success Bank, Owen Anchorage over the period 1997 to approximately the end of 2002. Shellsand of high quality, about 92% calcium carbonate is used by Cockburn Cement Ltd (the proponent) for the manufacture of quicklime and cement products. Read more...