The Eastern Metropolitan Regional Council is proposing to construct and operate an immobilisation plant to treat Class V Air Pollution Control Residue (APCr) generated from offsite Waste to Energy plants, and to construct a dedicated Class IV monocell for disposal of the treated APCr, at the Red Hill Waste Management Facility, located within the City of Swan. The immobilisation plant will treat APCr to meet Class IV standards suitable for disposal into Class IV landfills. The existing Class IV... Read more...Last updated: April 22, 2024
The proposal is to operate the Beenyup Wastewater Ocean Outlets into Marmion Marine Park that are associated with the Beenyup Wastewater Treatment Plant and Advanced Water Recycling Plant. Read more...Last updated: November 14, 2023
The proposal is to construct and operate a resource recovery facility within the existing Red Hill Waste Management Facility, City of Swan, for the processing of waste to produce energy, using either anaerobic digestion technology or gasification technology. Read more...Last updated: November 14, 2023
Changes to condition 3 of Ministerial Statement 976 in order to extend the Time Limit for Authorisation for substantial commencement of the proposal. Read more...Last updated: October 27, 2022
Proposal to build and operate a Regional Resource Recovery Center on Pt Lot 78 and Pt Lot 85 Bannister Rd, Canning Vale. Read more...Last updated: March 21, 2022
The City of Stirling proposes to redevelop its existing Recycling Centre Balcatta to establish an update Community Recycling Centre (CRC) and Waste Transfer Station (WTS) Facility located at 238 Balcatta Road, Balcatta, Western Australia. The site is located within an industrial and business area and under the City’s Local Planning Scheme No. 3 has been designated as a ‘Special Control Area’ zoned as ‘Industry’. The CRC will encourage the reuse and recovery of materials and diversion of waste... Read more...Last updated: February 1, 2022
Changes to condition 7 to remove reference to the onsite brickmaking facility. Read more...Last updated: January 31, 2022
To build and operate a waste to energy plant on Lot 9500 Leath Road, Kwinana in the Kwinana Industrial Area. Read more...Last updated: July 31, 2017
Elan Energy Matrix Pty Ltd proposes to construct and operate a Tyre Resource Recovery Facility to recycle used tyres at 9 Fargo Way Welshpool, approximately 12 kilometres southeast of Perth within a ‘General Industry’ zone in the City of Canning. The proposal will involve thermal processing of used tyres to produce carbon black (material derived from char), steel wire, oil and process gas using an indirect fired thermal conversion unit. The plant will be located within enclosed buildings.... Read more...Last updated: November 30, 2016
The Site is approximately 16.9 ha and is proposed to be remediated and regenerated. It was previously mined for building and construction sands and was later used as a licensed “inert” landfill. It has been reported that non-approved waste streams were disposed of at the Site. In October 2010 following a compliance inspection the Site was classified “Contaminated – Remediation Required” under Section 13 of the Contaminated Sites Act 2003 The proponent is proposing to redevelop the area by... Read more...Last updated: September 19, 2016
The proposal is to develop a Waste Transfer and Resource Recovery Facility approximately 10 kilometres from Perth at 25 Jackson Street, Bassendean in the Bassendean Industrial Area. The proposal would include: a Materials Recovery Facility (MRF) for the processing of co-mingled recyclables; acceptance, short term stockpiling and baling of source separated recycled commodities; glass crusher for management of waste glass from the MRF; a metal shredder for the processing of metal commodities; a... Read more...Last updated: April 26, 2016
The proposal is to construct and operate a Wood Waste to Energy Plant at the existing Hazelmere Recycling Centre on Part Lot 100 and Lot 301, Lakes Road, Hazelmere. Read more...Last updated: February 20, 2015
The proposal is to discharge up to 30 megalitres per day (ML/day) of industrial wastewater, in addition to treated wastewater from Woodman Point and Cape Peron wastewater treatment plants and water from the Jervoise Bay Groundwater Recovery Scheme, to the Sepia Depression via the Cape Peron outlet line from the Kwinana Wastewater Reclamation Plant (KWRP); BP Refinery (Kwinana); CSBP Limited; Edison Mission Energy, and further unspecified sources. Read more...Last updated: January 20, 2015
To build and operate a Waste to Energy and Materials Recovery Facility on Lot 1 Office Road, 3 kilometres north-east of Rockingham in the Rockingham Industrial Zone. Read more...Last updated: September 2, 2013
Water Corporation is proposing to implement a 14 gigalitre per annum groundwater replenishment scheme (GWRS) of recycled wastewater to the Leederville and Yarragadee aquifers, located on the Swan Coastal Plain. Read more...Last updated: December 7, 2005
Inquiry under Section 46(1) of the, Environmental Protection Act 1986, , on whether the conditions of the implementation of Ridgepoynt Pty Ltd's (Ridgepoynt) proposal, to remediate the Tonkin Park Industrial site by containment of the waste on-site in a cell, should be changed. Specifically, the conditions regarding the timeline for implementation, ongoing monitoring of the groundwater and ongoing management of the cell are to be reviewed. Read more...Last updated: November 25, 2005
The revised proposal is to change the dimensions of the containment cell by reducing the footprint, from 7 ha t o 3.8 ha, and increasing the height, from 25m AHD to 35.5m AHD (approximately 15.5 m above surrounding land). Read more...Last updated: October 13, 2004
The proposal is to establish a Resource Recovery Facility (RRF) to process 100 ,00 tonnes per annum of municipal solid waste (MSW) in the Neerabup Industrial Area (NIA), City of Wanneroo Read more...