Use of the Cape Peron outlet pipeline to dispose of industrial wastewater, Kwinana

Project
Proponent
Proposal description

The proposal is to discharge up to 30 megalitres per day (ML/day) of industrial wastewater, in addition to treated wastewater from Woodman Point and Cape Peron wastewater treatment plants and water from the Jervoise Bay Groundwater Recovery Scheme, to the Sepia Depression via the Cape Peron outlet line from the Kwinana Wastewater Reclamation Plant (KWRP); BP Refinery (Kwinana); CSBP Limited; Edison Mission Energy, and further unspecified sources.

Assessment Number
1471
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
2. Decision on whether to assess this proposal
Chair's Determination
Preliminary Environmental Factors
Date published
3. Assessment
Scoping
Approved
Environmental Review
Environmental Review documentation
4. EPA Report on assessment
EPA Report Number
1135
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Post-assessment changes
s. 45C amendments

Attachment 1 to Statement 665 – Amendments to: Proposal description, toxicant volumes and loads, dates for expansion, definitions for “typical” and “maximum” discharge criteria, replacement of “Total Nitrogen” concentration with “Annual Nitrogen Load”, update of all Figures in Schedule 1 – change to proposal approved under s45C on 15 July 2014.

Attachment 2 to Statement 665 - Replace “Annual Nitrogen Load” of 1,100 with 1,778 tonnes per annum - change to proposal approved under s45C on 20 February 2015.

Date of approval s. 45C