The Banksia Road Landfill is located in the Shire of Dardanup approximately 10 kilometres (km) from the City of Bunbury and 3.8 km south-east of the town of Dardanup. The Landfill is currently operating under a Licence issued through Part V of the Environmental Protection Act (Licence - L8904/2015/1) which allows for the acceptance of Liquid Waste; and Class II and Class III putrescible waste. The proposal would be a continuation of the current operations and including the establishment of... Read more...Last updated: October 1, 2019
The proposal is for the works and operation of a wastewater treatment plant (WWTP) and woodlot reuse scheme for the first three years. This will enable monitoring and evaluation to be undertaken to determine a longer term strategy for development and operation of the scheme. The proposed works and operation for the first three years form part of planned Stage 1 of the scheme, which will extend to the year 2010. A further two stages (extending to 2040) are planned for the future. Read more...Last updated: April 22, 2007
The proposal is to raise the application rate for total nitrogen from 106 to 150 kg/ha/y to the area of irrigated trees on the tree farm. Inquiry under s46 into changes to Ministerial Statement 287 . The original proposal, assessed in 1992, calculated nitrogen loadings in the wastewater applied to the grass bays and the irrigated trees at the wastewater disposal site. The projected loadings were based on the wastewater treatment plant being upgraded to reduce nitrogen concentrations in the... Read more...Last updated: December 15, 1999
The proposal is for the stages 1 and 2 of the development of the Busselton Wastewater Treatment Plant, Queen Elizabeth Avenue, Busselton, to an output of 6,750 cubic metres per day, and disposal of treated wastewater from the plant via an onsite wetland to the Vasse Agricultural drain and consequently to the Vasse Diversion Drain. Read more...Last updated: September 6, 1995
The proponent, Western Power, proposes to dispose of about 6,700 m 3 /d of clear saline water from the Collie Power Station via a 68 km pipeline to the ocean at the northern end of the Leschenault Peninsula north of Bunbury. The saline water to be discharged would have a Total Dissolved Solids (TDS) level of 3,200 to 5,000 g/m 3 , and have ambient temperature. The main constituent would be sodium chloride or common salt. This water, although unsuitable for the power station, could be used by... Read more...Last updated: December 10, 1993
SCM Chemicals Ltd (the proponent) proposes to continue using its Dalyellup solid residue disposal site beyond March 1994, the expiry date of current approvals for the site. SCM referred this proposal to the Environmental Protection Authority as an amendment to its existing Environmental Conditions in July 1993. Read more...Last updated: July 9, 1992
The proposal is to collect an existing backlog of waste polychlorinated biphenyls (PCBs) and chlorinated pesticides which are stored at various centres in Western Australia and export them to the United Kingdom for destruction by high temperature incineration at the Rechem facilities at Fawley and Pontypool. The proposal does not cover waste which may be generated in the future as it is unlikely these materials would ever be used again in Western Australia. Environmental issues relating to... Read more...Last updated: February 27, 1991
The proposal is to construct a facility to treat wastewater from Augusta to secondary standards and dispose of the effluent by ground infiltration on an area adjacent to the ponds. The site selected is Unalienated Crown Land located approximately 3km south-west of the Central Business District of the town of Augusta. The wastewater from Augusta will be treated using oxidation ponds. Initially there will be 3 oxidation ponds operated in series to cater for a population of 1,000. Future upgrading... Read more...