The Proposal is to construct and operate the Pluto to Northwest Shelf Interconnector, a 3.3 km long, steel buried natural gas pipeline, connecting the Pluto Interconnector Compressor Station to the Karratha Gas Plant which is operated by Woodside on behalf of the North West Shelf Project participants, located on the Burrup Peninsula in the North of Western Australia. The proposal will require the clearing of an estimated 10.69 ha.3.26 ha within the Karratha Gas Plant Lease and Buffer Zone Lease... Read more...Last updated: September 16, 2019
The proposal is to develop the Griffin oilfield which is located 68km offshore from Onslow. The oilfield will be developed using a floating production, storage and offloading facility and both oil and gas will be produced. The gas will be recovered and transported to the mainland via a submarine and onshore pipeline to a gas treatment plant and then on to the Dampier-Perth gas pipeline. This assessment comprises the portion of the offshore pipeline in State waters, bringing gas onshore to the... Read more...Last updated: April 30, 2015
To expand the liquefied natural gas (LNG) production capacity of the existing proposal from 15 million tonnes per annum (Mtpa) to 20 Mtpa (nominal). Read more...Last updated: April 2, 2014
Chevron Australia Pty Ltd proposes to clear an additional 32 hectares of land within a 36 hectare development envelope on Barrow Island. The clearing is for the purposes of an additional construction laydown and operations support area, required to support the construction and operation of the Gorgon Gas Development referred to in Ministerial Statement 800 dated 10 August 2009 and Ministerial Statement 865 dated 8 June 2011. Read more...Last updated: June 26, 2013
Chevron Australia Pty Ltd, as operator for the Gorgon Joint Venturers, proposes to extract, pipe, liquefy and export 10 million tonnes per annum of natural gas from the Greater Gorgon and Jansz gas fields using facilities offshore and on Barrow Island, Western Australia. Read more...Last updated: January 30, 2013
The proposal is to construct and operate a 25 million tonne per annum Liquefied Natural Gas (LNG) facility and associated Domestic Gas (Domgas) facility in the proposed Ashburton North Strategic Industrial Area (ANSIA) 12 kilometres south west of the town of Onslow. The proposal includes: Subsea gas trunkline to bring produced hydrocarbons onshore to the LNG and Domgas plants; Product loading facility (PLF); Materials offloading facility (MOF); LNG and Domgas plants; Accommodation facilities;... Read more...Last updated: January 11, 2013
The proposal is to construct and operate a 25 million tonne per annum Liquefied Natural Gas (LNG) facility and associated Domestic Gas (Domgas) facility in the proposed Ashburton North Strategic Industrial Area (ANSIA) 12 kilometres south west of the town of Onslow. The proposal includes: Subsea gas trunkline to bring produced hydrocarbons onshore to the LNG and Domgas plants; Product loading facility (PLF); Materials offloading facility (MOF); LNG and Domgas plants; Accommodation facilities;... Read more...Last updated: January 17, 2012
The proposal is to construct a sub sea pipeline, onshore gas treatment and compression plant, and sales gas pipeline. The subsea pipeline from the Macedon Gas Field (100 kilometres west of Onslow) connects to the onshore gas treatment and compression plant at Ashburton North (15 kilometres southwest of Onslow). The sales gas pipeline connects the onshore facility to the Dampier to Bunbury Natural Gas (DBNG) Pipeline. Read more...Last updated: June 8, 2011
Ministerial Statement 800 - Gorgon Gas Development Revised and Expanded Proposal - Inquiry under s46 into a request for changes to conditions 18, 20 and 21. Read more...Last updated: January 19, 2011
Inquiry under s46 into a request to change the conditions of Ministerial Statement 757 . Read more...Last updated: November 29, 2006
This proposal is for the Development of Industrial Land on the Burrup Peninsula. The proposed site is designated Industrial Lease Area A (Site A). Approval would allow Woodside Energy Ltd to undertake limited site preparation activities for the future installation of infrastructure, such as LNG and condensate storage tanks, which would be needed should the proposed Pluto LNG Development be allowed to proceed. Read more...Last updated: June 29, 2006
The proponent proposes to construct and operate a number of looping sections adjacent (and connected) to the existing underground gas transmission pipeline within the DBNGP corridor. There are nine separate looping sections proposed from CS 1 south of Karratha, to CS 9, north of Gingin. Looping is a process of duplicating an existing pipeline between compressor stations for a certain distance. Once the specified distance is reached, it then ties back to the parallel pipeline. This design... Read more...Last updated: August 25, 2005
The proposed Simpson Development proposal will make use of three existing wells and one that is the subject of a separate referral. The development will consist of: the Simpson Alpha offshore mini-platform located at the Tanami-4 and Tanami-5 wells surface location; the Simpson Bravo offshore mini-platform located at the Simpson-1 and Simpson-3H well locations; and a sub-sea pipeline bundle linking the two mini-platforms to each other and to existing facilities on Varanus Island. The pipeline... Read more...Last updated: February 11, 2000
Woodside Energy Limited proposes to construct and operate additional Liquefied Natural Gas (LNG) processing trains, the current proposal being for two trains with a total additional capacity of 8 Mtpa at its onshore gas plant on the Burrup. Read more...Last updated: July 14, 1998
The Proposal is to install a second undersea gas trunk line from the existing offshore Goodwin/North Rankin production platforms to a new terminal located in the existing onshore treatment plant at Withnell Bay on the Burrup Peninsula. Read more...Last updated: September 25, 1997
The proposal is to develop the Wonnich gas field situated some 8 km south-west of the Montebello Islands. Read more...Last updated: June 19, 1997
The proposal is to carry out a program of appraisal drilling on the Wonnich petroleum field within permit area TP/8. Read more...Last updated: September 8, 1995
The proposal is to develop the East Spar offshore gas field, located in Commonwealth waters approximately 50 kilometres west of Barrow Island. Processing facilities would be constructed and operated on Varanus Island immediately adjacent to the existing Harriet Joint Venture facilities on the island. A new submarine pipeline would bring gas/condensate from the gas field to the processing facilities. The existing Harriet Joint Venture export pipeline would carry gas to the trunkline on the... Read more...Last updated: June 9, 1995
Ampolex Ltd proposes to drill an exploration well at a site approximately 8 km south-west of Hermite Island in the Montebello Islands and approximately 3 km west of the Montebello Islands barrier reef Read more...Last updated: November 25, 1994
The Goldfields Gas Pipeline Joint Venture participants propose to construct a buried pipeline from near Onslow to Kalgoorlie, via Newman in the eastern Pilbara. The pipeline would transmit gas from the existing Dampier to Perth gas pipeline to the Pilbara and Goldfields regions, initially for power generation at mine sites owned by the participants. Six lateral buried pipelines would be constructed from the main pipeline to deliver gas to the proposed gas-fired power stations at the mine sites... Read more...