Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Infrastructure (73) Apply Infrastructure filter
  • Iron Ore (68) Apply Iron Ore filter
  • Land use (36) Apply Land use filter
  • Mineral sands (16) Apply Mineral sands filter
  • Industrial (12) Apply Industrial filter
  • Gold (9) Apply Gold filter
  • Nickel (8) Apply Nickel filter
  • Sand, rock, gravel and clay (8) Apply Sand, rock, gravel and clay filter
  • Waste management (8) Apply Waste management filter
  • Uranium (5) Apply Uranium filter
  • Diamonds (4) Apply Diamonds filter
  • Oil and gas (3) Apply Oil and gas filter
  • Power generation (3) Apply Power generation filter
  • Copper (2) Apply Copper filter
  • Lead (2) Apply Lead filter
  • Rare earth elements (2) Apply Rare earth elements filter
  • Aquaculture (1) Apply Aquaculture filter
  • Clearing (1) Apply Clearing filter
  • Molybdenum (1) Apply Molybdenum filter
  • Salt (1) Apply Salt filter

Filter by current status:

  • (-) Remove Ministerial Statement published filter Ministerial Statement published

Filter by relevant environmental factors:

  • (-) Remove Hydrological Processes filter Hydrological Processes
  • Flora and Vegetation (171) Apply Flora and Vegetation filter
  • Inland Waters Environmental Quality (163) Apply Inland Waters Environmental Quality filter
  • Terrestrial Fauna (125) Apply Terrestrial Fauna filter
  • Social Surroundings (85) Apply Social Surroundings filter
  • Terrestrial Environmental Quality (61) Apply Terrestrial Environmental Quality filter
  • 37 (59) Apply 37 filter
  • Subterranean Fauna (45) Apply Subterranean Fauna filter
  • Marine Environmental Quality (17) Apply Marine Environmental Quality filter
  • Human Health (14) Apply Human Health filter
  • Landforms (13) Apply Landforms filter
  • Benthic Communities and Habitats (10) Apply Benthic Communities and Habitats filter
  • Water (7) Apply Water filter
  • Coastal Processes (5) Apply Coastal Processes filter
  • Marine Fauna (5) Apply Marine Fauna filter
  • People (4) Apply People filter

Filter by Proponent:

  • Water Corporation (11) Apply Water Corporation filter
  • BHP Billiton Iron Ore Pty Ltd (10) Apply BHP Billiton Iron Ore Pty Ltd filter
  • Hamersley Iron Pty Limited (9) Apply Hamersley Iron Pty Limited filter
  • Fortescue Metals Group Limited (8) Apply Fortescue Metals Group Limited filter
  • Main Roads Western Australia (6) Apply Main Roads Western Australia filter
  • Robe River Mining Co. Pty. Ltd (4) Apply Robe River Mining Co. Pty. Ltd filter
  • Fortescue Metals Group Ltd (3) Apply Fortescue Metals Group Ltd filter
  • Iluka Resources Limited (3) Apply Iluka Resources Limited filter
  • Main Roads WA (3) Apply Main Roads WA filter
  • Polaris Metals Pty Ltd (3) Apply Polaris Metals Pty Ltd filter
  • API Management Pty Limited (2) Apply API Management Pty Limited filter
  • Argyle Diamond Mines Pty Ltd (2) Apply Argyle Diamond Mines Pty Ltd filter
  • Brockman Iron Pty Ltd (2) Apply Brockman Iron Pty Ltd filter
  • Cable Sands (WA) Pty Ltd (2) Apply Cable Sands (WA) Pty Ltd filter
  • Cameco Australia Pty Ltd (2) Apply Cameco Australia Pty Ltd filter
  • City of Cockburn (2) Apply City of Cockburn filter
  • City of Gosnells (2) Apply City of Gosnells filter
  • Dampier to Bunbury Natural Gas Pipeline (WA) Nominees Pty Limited (2) Apply Dampier to Bunbury Natural Gas Pipeline (WA) Nominees Pty Limited filter
  • Grange Resources Limited (2) Apply Grange Resources Limited filter
  • Griffin Power Pty Ltd (2) Apply Griffin Power Pty Ltd filter
  • Hamersley Iron Pty Ltd (2) Apply Hamersley Iron Pty Ltd filter
  • Karara Mining Limited (2) Apply Karara Mining Limited filter
  • Keysbrook Leucoxene Pty Ltd (2) Apply Keysbrook Leucoxene Pty Ltd filter
  • LandCorp and Octennial Holdings Pty Ltd (2) Apply LandCorp and Octennial Holdings Pty Ltd filter
  • Murrin Murrin Operations Pty Ltd (2) Apply Murrin Murrin Operations Pty Ltd filter
  • Public Transport Authority (2) Apply Public Transport Authority filter
  • St Ives Gold Mining Company Pty Limited (2) Apply St Ives Gold Mining Company Pty Limited filter
  • Toro Energy Limited (2) Apply Toro Energy Limited filter
  • Tronox Management Pty Ltd (2) Apply Tronox Management Pty Ltd filter
  • Bluewaters Power 3 Pty Ltd (1) Apply Bluewaters Power 3 Pty Ltd filter
  • Cliffs Asia Pacific Iron Ore Pty Ltd (1) Apply Cliffs Asia Pacific Iron Ore Pty Ltd filter
  • Conservation Commission of Western Australia (1) Apply Conservation Commission of Western Australia filter
  • Cranford Pty Ltd (1) Apply Cranford Pty Ltd filter
  • Eastern Metropolitan Regional Council (1) Apply Eastern Metropolitan Regional Council filter
  • Eglinton Estates Pty Ltd (1) Apply Eglinton Estates Pty Ltd filter
  • FMG (1) Apply FMG filter
  • Forge Resources Swan Pty Ltd (1) Apply Forge Resources Swan Pty Ltd filter
  • Fortescue Metals Group (1) Apply Fortescue Metals Group filter
  • Hope Downs Management Services Pty Ltd (1) Apply Hope Downs Management Services Pty Ltd filter
  • Image Resources NL (1) Apply Image Resources NL filter
  • Lanco Resources Australia Pty Ltd (1) Apply Lanco Resources Australia Pty Ltd filter
  • Macarthur Minerals Limited (1) Apply Macarthur Minerals Limited filter
  • Moly Metals Australia Pty Ltd (1) Apply Moly Metals Australia Pty Ltd filter
  • Roy Hill Infrastructure Pty Ltd (1) Apply Roy Hill Infrastructure Pty Ltd filter
  • Roy Hill Iron Ore Pty Ltd (1) Apply Roy Hill Iron Ore Pty Ltd filter
  • Tiwest Joint Venture (1) Apply Tiwest Joint Venture filter
  • Tiwest Pty Ltd (1) Apply Tiwest Pty Ltd filter
  • Veolia Environmental Services (Australia) Pty Ltd (1) Apply Veolia Environmental Services (Australia) Pty Ltd filter
  • Vimy Resources Limited (1) Apply Vimy Resources Limited filter
  • WMC Resources Ltd (St Ives Gold) (1) Apply WMC Resources Ltd (St Ives Gold) filter

Filter by region:

  • Pilbara (70) Apply Pilbara filter
  • Perth (68) Apply Perth filter
  • South West (24) Apply South West filter
  • Goldfields Esperance (15) Apply Goldfields Esperance filter
  • Mid West (15) Apply Mid West filter
  • Wheatbelt (15) Apply Wheatbelt filter
  • Kimberley (12) Apply Kimberley filter
  • Peel (7) Apply Peel filter
  • Gascoyne (4) Apply Gascoyne filter
  • Great Southern (4) Apply Great Southern filter
  1. Home
  2. Proposal search
  3. Ministerial Statement published
  4. Hydrological Processes

Waroona Mineral Sands Project

Last updated: June 30, 2006

The proposal is to develop a mineral sand mine one kilometre north of the township of Waroona, which is approximately 140 km south of Perth. The area for assessment has been identified as Mining Tenements M70/735, M70/797 and M70/1089. Read more...

Northern Looping Project, Loops 1 to 9 Karratha to Bullsbrook

Last updated: June 29, 2006

The proponent proposes to construct and operate a number of looping sections adjacent (and connected) to the existing underground gas transmission pipeline within the DBNGP corridor. There are nine separate looping sections proposed from CS 1 south of Karratha, to CS 9, north of Gingin. Looping is a process of duplicating an existing pipeline between compressor stations for a certain distance. Once the specified distance is reached, it then ties back to the parallel pipeline. This design... Read more...

Wallaby Gold Mine Project

Last updated: June 23, 2006

Proposal to develop the Wallaby Gold Mine. Located on the shore of Lake Carey, a naturally occurring saline wetland approximately 27 km south-west of Laverton. The Wallaby Gold Mine Project includes development of an open cut gold mine, waste rock dumps and infrastructure to support mining on the northern shoreline of the lake. Gold ore produced at the mine will be transported via overland conveyor to an existing processing plant with tailings placed in both an extended and a new tailings... Read more...

East Clontarf Residential Development

Last updated: May 25, 2006

The proposal is for residential development on the East Clontarf site, approximately 18ha in size. The site is bounded by Manning Road, Centenary Avenue and the Canning River. It is zoned Urban in the Metropolitan Region Scheme (MRS) and Residential in the City of South Perth Town Planning Scheme. The foreshore area adjacent to the proposed development is identified for protection as Bush Forever site 333 and reserved for Parks and Recreation in the MRS. Read more...

Phillips River Gold Project

Last updated: March 28, 2006

The proposal is for the developing of mining operations at the areas of Trilogy and Kundip, construction of a haul road, construction and operation of a processing plant, and disposal of tailings at the RAV 8 site. Read more...

Abernethy Road – Tonkin Highway On-ramp

Last updated: January 25, 2006

Main Roads Western Australia (MRWA), propose to construct an On-ramp from Abernethy Road to Tonkin Highway, Kewdale. This report provides the Environmental Protection Authority’s (EPA’s) advice and recommendations as required by Section 44 of the, Environmental Protection Act 1986, to the Minister for the Environment, on the environmental factors relevant to the proposal. Read more...

Orebody 25 Extension

Last updated: January 24, 2006

Proposal by BHP Billiton Iron Ore Pty Ltd (BHPBIO) to expand existing mining operations at Orebody 25 Mine (OB25), within mining lease (ML) 244SA. Read more...

Southern Looping Project, Loop 10, south of Kwinana

Last updated: December 28, 2005

The proposal is to construct and operate a 23-kilometre pipeline from Kwinana Junction, in Kwinana to Hopelands (between Punrak Road and Henderson Road). This proposal is known as the Southern Looping Project, and comprises loop 10. The proponent has also referred a proposal to construct and operate a 194-kilometre pipeline from Compressor Station 1 south of Karratha, to Compressor Station 9, north of Gingin. This proposal, known as the Northern Looping Project , and comprising loops 1 to 9,... Read more...

Revised Proposal - Dampier Port Increase in Throughput to 120 Mtpa

Last updated: December 5, 2005

The proposal is to expand Hamersley Iron's iron ore operations at Dampier Port from 95 million tonnes per annum (Mtpa) to 120 Mtpa. The Hamersley Iron Dampier Port operations include rail and port facilities, rail maintenance workshops, a 120MW power station, laboratories and other service and administrative functions. The port operations are located at two terminals – Parker Point (PP) and East Intercourse Island (EII). The proposal is to increase the capacity of the Parker Point terminal... Read more...

Ammonium Nitrate Production Facility Expansion, Kwinana

Last updated: September 21, 2005

CSBP currently produces approximately 235,000 tpa of ammonium nitrate at its Kwinana operations which are located within the Kwinana Industrial Area. This proposal is to expand the ammonium nitrate production capacity to approximately 580,000 tpa by debottlenecking and duplicating its existing facilities. The expansion includes: duplication and/or debottlenecking of the existing 500 tpd nitric acid plant; duplication and/or debottlenecking of the existing 635 tpd ammonium nitrate reaction plant... Read more...

Campbell Road Estate Super-lot subdivision

Last updated: August 31, 2005

The City of Gosnells proposes to amalgamate 23 individual lots within Campbell Estate totalling 49.32ha, then subdivide this into three lots to create: a ‘core’ conservation area incorporating significant high quality wetlands (6.9ha); a ‘buffer’ to the conservation area that will also provide some stormwater management (2.38ha); and a residential development area (34.7ha). The remaining 10.68ha, which is included in the Campbell Road Estate ODP is not part of this proposal. Read more...

South West Metropolitan Railway Perth to Mandurah

Last updated: March 4, 2005

The proposal is to construct and operate the South West Metropolitan Railway from Perth to Mandurah. The proposal includes the establishment of rail infrastructure between Perth and Mandurah with the northern section of the line running from the Perth Central Business District to Anketell tunnel via the Kwinana Freeway. South of the Anketell tunnel, the proposed railway passes through the local government areas of the Town of Kwinana, the City of Rockingham and the City of Mandurah, and... Read more...

Industrial Subdivision – Lot 502 North Lake, Sudlow and Phoenix Roads, Bibra Lake (2)

Last updated: September 20, 2004

Proposal to subdivide approximately 89 hectares of land being Lot 502 bounded by North Lake, Phoenix and Sudlow Roads and a rail reserve, for industrial and mixed business purposes. The proponent for the proposal is the Western Australian Land Authority trading as LandCorp (LandCorp). Read more...

Bunbury International Motorsports Complex

Last updated: July 8, 2004

The proposal is to construct an international standard motorsports complex in Picton, near Bunbury. This comprises a racing circuit, pit area, rally and off-road testing facility, grandstand, control centre, and associated roads and car parks. It is intended that accommodation and a racing technology park will be constructed at a later date. However, these will be subject to separate assessment, as will the use of the complex for other purposes, such as concerts. Read more...

Mundaring Water Treatment Plant and Sawyer's Valley Water Storage Tanks

Last updated: June 25, 2004

Proposal by the Water Corporation to construct a Water Treatment Plant in Mundaring and Water Storage Tanks in Sawyers Valley. Read more...

Ludlow Titanium Minerals Mine, 34 Kilometres south of Bunbury

Last updated: May 12, 2003

Cable Sands (WA) Pty Ltd proposal to develop a mineral sands mine in a section of State Forest No.2, near Ludlow. Read more...

Methanol Plant and Product Export, Burrup Peninsula

Last updated: December 20, 2002

The proposal is for construction and operation of a methanol plant of 1.05 million tonnes per annum (Mt/a) nominal capacity, at Withnell East industrial area on the Burrup Peninsula The proposal includes the installation of a gas supply pipeline, product pipeline, seawater supply pipeline and wastewater discharge pipeline to be situated in infrastructure corridors for which the Department of Mineral and Petroleum Resources (MPR) will be proponent. The plant footprint will occupy approximately... Read more...

Samson Brook Redevelopment Scheme

Last updated: September 13, 2002

The proposal being assessed is for the diversion of 8 gigalitres a year (on average) (GL/yr) of unallocated water resources in the Samson Catchment to be diverted for public water supply, the construction of a pipe head dam and related infrastructure. The Samson Brook Redevelopment Scheme is a key element of the Water Corporation’s drought recovery plan. Read more...

Hydrogeological research programme at Marandoo

Last updated: July 2, 2002

The proposal is to undertake a hydrogeological research programme at the Marandoo mine site. Marandoo mine site, on Marandoo Mining Lease (M272SA), is 35 kilometres north-east of the town of Tom Price in the Pilbara, and abuts Karijini National Park. Read more...

Remediation of contaminated sites on Morangup Road, Toodyay

Last updated: March 1, 2002

The Western Australian government has committed to remediating three contaminated sites on the west side of Morangup Road, approximately 25km south-west of Toodyay. A small amount of contamination from Site C has entered Lot 12. This contamination will be removed as part of Site C’s remediation. Read more...

Pages

  • « first
  • ‹ previous
  • …
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.