Last updated: November 25, 2024
PEG proposes to construct and operate 14 new gas-fired reciprocating engines with a combined maximum installed capacity of 165 MW. It is expected the average annual throughput of the facility will be approximately 150 MW. The 165 MW power station is expected to result in 609,696 tCO2-e. The proposed PEG power station is located next to the existing Solomon power station and replaces the need for 221 MW power at Iron Bridge, which would have resulted in 1,196,423 tCO2-e. FMG have submitted a... Read more...Last updated: November 25, 2024
The proposal is for the construction and operation of a Lithium Hydroxide Refinery at Lot 15 Mason Road, Kwinana within the Kwinana Industrial Area, approximately 31 km south of the Perth Central Business District. The Proposal will process spodumene ore concentrate, to produce battery grade Lithium Hydroxide Monohydrate, primarily for use in Lithium ion batteries for electric vehicles. The proposal would require a total of 11.2 hectares of native vegetation clearing within a 76 hectare... Read more...Last updated: November 25, 2024
The Proposal is located in the Pilbara region of Western Australia within a development envelope of 20,821 ha and clearing no more than 1,564 ha. Onslow Infraco Pty Ltd (herein MRL a wholly owned subsidiary of Mineral Resources Limited) is proposing to develop: • A fully sealed private haul road, approximately 125km in length • Gas pipeline and ancillary haul road infrastructure. • Storage and bulk handling of ore at the Port of Ashburton. • Dredging a dedicated berthing pocket adjacent to the... Read more...Last updated: November 25, 2024
CSBP Limited proposes to construct and operate a new ammonia plant within the CSBP Kwinana Industrial Complex in the Kwinana Industrial Area (KIA), located approximately 40 km south of the Perth Central Business District. The proposal will use natural gas sourced from the Dampier to Bunbury Natural Gas Pipeline (DBNGP), integrated with hydrogen production from a 10 megawatt electrolyser manufacture ammonia, which will then be used by CSBP for the manufacture of other chemical products or sold... Read more...Last updated: November 25, 2024
The Proposal is for the construction and operation of a Renewable fuels processing facility that produces renewable diesel and sustainable aviation fuel from vegetable oils, animal fats and other biowaste products. The biorefinery will reuse the existing processing infrastructure formerly used for hydrocarbon refining (such as hydrofiner units, storage tanks, pipelines and utilities such as the flare and wastewater treatment plant) combined with some additional new infrastructure such as a... Read more...Last updated: November 25, 2024
OZ Minerals Musgrave Operations Pty Ltd propose to develop the West Musgrave Copper and Nickel Project, located in the West Musgrave Ranges of Western Australia, approximately 1,300 km north-east of Perth near to the intersection of the borders between Western Australia, South Australia and the Northern Territory. The nearest towns include the Indigenous Communities of Jameson (Mantamaru) 26 km north, Blackstone (Papulankutja) 50 km east, and Warburton (Milyirrtjarra) 110 km west of the... Read more...Last updated: November 21, 2023
The Banksia Road Landfill is located in the Shire of Dardanup approximately 10 kilometres (km) from the City of Bunbury and 3.8 km south-east of the town of Dardanup. The Landfill is currently operating under a Licence issued through Part V of the Environmental Protection Act (Licence - L8904/2015/1) which allows for the acceptance of Liquid Waste; and Class II and Class III putrescible waste. The proposal would be a continuation of the current operations and including the establishment of... Read more...Last updated: August 15, 2023
Inquire into and report on the matter of changing condition 12 of Ministerial Statement 757 to align it with contemporary greenhouse gas conditions reflecting the content of the Pluto LNG Facility Greenhouse Gas Abatement Program. Read more...Last updated: June 16, 2023
The requested change relates to condition 3 of Statement 1027 for an extension to the time limit for proposal implementation. Read more...Last updated: November 23, 2022
Covalent Lithium Pty Ltd propose to make changes to their existing approved lithium mine. Changes include the construction and operation of a solar plant to provide renewable energy, changes to the tailings disposal method from a dry to a wet tailings, co-disposal of inert refinery waste generated from the Kwinana Lithium Refinery and modification of existing flora and vegetation and fauna exclusion areas. The revised proposal would include the additional disturbance of 56 hectares (ha). Read more...Last updated: October 19, 2022
Adequacy of the existing implementation conditions of the above mentioned Ministerial Statements with respect to avoiding, reducing and offsetting greenhouse gas emissions. Read more...Last updated: June 14, 2022
APA Northern Goldfields Interconnect Pty Ltd proposes to construct and operate the Northern Goldfields Interconnect Pipeline. The 300 mm diameter buried gas pipeline will extend for approximately 580 km, starting from Ambania (50 km east of Geraldton) to 40 km south of Leinster where it will connect into the existing Goldfields Gas Pipeline. The project will connect existing gas assets in the Mid West region with existing gas assets in the Northern Goldfields region. The proposal includes... Read more...Last updated: March 15, 2022
The requested change relates to changing condition 9 in order to contemporise the condition with the Environmental Factor Guideline – Greenhouse Gas (GHG) Emissions (EPA 2020) Read more...