Last updated: March 17, 2025
The Proposal is to develop a new bridge with a single lane dual carriage road and dual use path over the Preston River, to Turkey Point, Bunbury, Western Australia. The Proposal requires a disturbance footprint of 9.59 ha within the overall Proposal Development Envelope (DE) of 11.34 ha. Subtropical Temperate Coastal Saltmarsh Threatened Ecological Community (VT03 and VT04) is present within the Proposal DE and will require clearing of approximately 1.36 ha. 1.22 ha has been identified as... Read more...Last updated: November 25, 2024
PEG proposes to construct and operate 14 new gas-fired reciprocating engines with a combined maximum installed capacity of 165 MW. It is expected the average annual throughput of the facility will be approximately 150 MW. The 165 MW power station is expected to result in 609,696 tCO2-e. The proposed PEG power station is located next to the existing Solomon power station and replaces the need for 221 MW power at Iron Bridge, which would have resulted in 1,196,423 tCO2-e. FMG have submitted a... Read more...Last updated: October 10, 2024
The Public Transport Authority (PTA) proposes to construct and operate 8 km of new railway (including dual tracks and associated rail infrastructure), between Armadale and Byford. The proposal includes modification to the existing Armadale Station and construction and operation of a new station at Byford. The proposal includes the replacement of level crossings with grade separated crossings, either road over rail or rail over road. The proposal involves clearing of up to 50 hectares (ha) of... Read more...Last updated: July 4, 2023
In 1998 Main Roads Western Australia (Main Roads) referred Stages 2, 3 and 4 of the Karratha – Tom Price Road, now called the Manuwarra Red Dog Highway (the Original Proposal), to the Environmental Protection Authority (EPA). The EPA assessed the Original Proposal and published EPA Report 1159. Ministerial Statement (MS) 677 was published in 2005. Construction of Stage 2 was completed in 2008. Stage 3 of the Original Proposal is currently under construction and is expected to be completed in... Read more...Last updated: May 10, 2023
The Commissioner of Main Roads Western Australia is proposing to construct and operate the northern section and upgrade the central section of the Bunbury Outer Ring Road (BORR). The proposal includes 19km of freeway-standard dual carriageway and associated interchanges between Forrest Highway and Boyanup-Picton Road (northern section) and between Boyanup-Picton Road and South West Highway (central section). The proposal would require the clearing of up to 73 hectares of native vegetation and... Read more...Last updated: June 14, 2022
APA Northern Goldfields Interconnect Pty Ltd proposes to construct and operate the Northern Goldfields Interconnect Pipeline. The 300 mm diameter buried gas pipeline will extend for approximately 580 km, starting from Ambania (50 km east of Geraldton) to 40 km south of Leinster where it will connect into the existing Goldfields Gas Pipeline. The project will connect existing gas assets in the Mid West region with existing gas assets in the Northern Goldfields region. The proposal includes... Read more...Last updated: May 25, 2022
Harvey Water propose to construct and operate a pipeline and ocean outfall to dispose brine wastewater. The pipeline will be located between the Kemerton Strategic Industrial Area and the Indian Ocean south of Binningup in the Shire of Harvey. The pipeline will convey brine to a single outlet diffuser outfall. The outfall will be located approximately 400 m from the shoreline and will be installed under the seabed by horizontal directional drilling from the coast. The outlet pipe will protrude... Read more...Last updated: March 14, 2022
The Public Transport Authority (PTA) proposes to construct and operate a new 13 kilometre (km) dual railway track between Malaga and Ellenbrook. The proposed Malaga to Ellenbrook extends from the proposed Bayswater to Malaga railway line. The proposal includes three new stations at Malaga, Whiteman Park and Ellenbrook with intermodal rail, bus, carpark and active mode (cycling and walking) facilities at each station. A potential future station is also proposed at Bennett Springs and rail... Read more...Last updated: October 21, 2021
The proponent, Shark Bay Resources Pty Ltd, operates two solar salt fields and an associated port facility at Useless Loop in the Shark Bay area of Western Australia. The site is located approximately 25 kilometres west southwest of Denham. The proponent is proposing to undertake maintenance and capital dredging of up to 80,000 cubic metres from the entrance channel of the port and seabed levelling of 10,000 cubic metres in the berth pocket to restore navigable depths. The development envelopes... Read more...