Proposal description: 

The proposal which Nufarm-Coogee has submitted for assessment is as follows:

  1. Separation of conditions and commitments in Ministerial Statement 1, devolving those related to the Chlor-Alkali Plant to Nufarm-Coogee, with the remainder continuing to be the responsibility of SCM Chemicals Ltd;
  2. Changing commitments for
    • a foam suppression system in the chlorine storage area.
    • remotely operated valves (ROVs) on the liquified chlorine line. and
    • excess flow valves on the liquified chlorine line; and,
  3. Salt stockpile of 30,000 tonnes is no longer required.
Assessment Number: 
176
Region: 
Referred under EP Act: 
s38
Industry sector: 
Last updated: 
May 1, 1989
Current Status: 
Ministerial Statement published