ProjectProponent: Nufarm-Coogee Pty Limited and SCM Chemicals LimitedProposal description: The proposal which Nufarm-Coogee has submitted for assessment is as follows: Separation of conditions and commitments in Ministerial Statement 1, devolving those related to the Chlor-Alkali Plant to Nufarm-Coogee, with the remainder continuing to be the responsibility of SCM Chemicals Ltd; Changing commitments for a foam suppression system in the chlorine storage area. remotely operated valves (ROVs) on the liquified chlorine line. and excess flow valves on the liquified chlorine line; and, Salt stockpile of 30,000 tonnes is no longer required. Assessment Number: 176Region: South WestReferred under EP Act: s38Industry sector: IndustrialLast updated: May 1, 1989Current Status: Ministerial Statement published 2. Decision on whether to assess this proposalChair's Determination: Formal under Part IV 4. EPA Report on assessmentEPA Report Number: 336EPA Report: Proposed Separation of Environmental Responsibilities - Chloride Process Pigment Plant, Kemerton (PDF, 634.41 KB)Date published: Sunday, 31 July, 1988 5. Decision on proposal and implementation of proposalMinisterial StatementDate of approval: Monday, 1 May, 1989Ministerial Statement: Ministerial Statement 66 (PDF, 287.54 KB)