ProjectProponent: Liquid Air WA Pty LtdProposal description: Liquid Air is seeking to pipe hydrogen from CSBP and Farmers' nearby chlor-alkali plant. The proposal necessitates an extension of the existing 50 mm diameter pipeline through private land owned by Tiwest and CSBP and Farmers over a further distance of some 1.6 km. The proponent has identified a preliminary route for the pipeline extension. Approval from Tiwest for the pipeline extension within its boundaries has been granted and, because Liquid Air has a corporate relationship with CSBP and Farmers, Liquid Air considers that formal approval from CSBP and Farmers is not required. Relocation of a small compressor and drier unit to the CSBP chlor-alkali site will be required. Assessment Number: 532Region: PerthReferred under EP Act: s38Industry sector: IndustrialLast updated: February 5, 1991Current Status: Ministerial Statement published 2. Decision on whether to assess this proposalChair's Determination: Consultative Environmental ReviewDate published: Saturday, 22 September, 1990 4. EPA Report on assessmentEPA Report Number: 461EPA Report: Alternative hydrogen supply; Kwinana (PDF, 81.03 KB)Date published: Friday, 23 November, 1990 5. Decision on proposal and implementation of proposalMinisterial StatementDate of approval: Tuesday, 5 February, 1991Ministerial Statement: Ministerial Statement 118 (PDF, 175.65 KB)