This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 25, 2024
The proposal is for the construction and operation of a Lithium Hydroxide Refinery at Lot 15 Mason Road, Kwinana within the Kwinana Industrial Area, approximately 31 km south of the Perth Central Business District. The Proposal will process spodumene ore concentrate, to produce battery grade Lithium Hydroxide Monohydrate, primarily for use in Lithium ion batteries for electric vehicles. The proposal would require a total of 11.2 hectares of native vegetation clearing within a 76 hectare... Read more...Last updated: November 12, 2024
Chalice Mining Limited proposes development of the Gonneville Nickel-Copper-Platinum Group Element (PGE) Project. The proposal is located within the Wheatbelt Region, approximately 70km north-east of Perth, 25 km west of Toodyay and 25 km south-east of Bindoon. The proposal comprises of a mine site including an open mine pit and/or underground mine and infrastructure corridor options for water and power supply. Road and/or existing rail infrastructure will be utilised in transporting supplies... Read more...Last updated: August 27, 2024
Australian Gold Reagents Pty Ltd propose to increase production at the existing Kwinana sodium cyanide liquid plant from 91,000 tonnes per annum (tpa) to a total of 110,000 tpa; and to increase production of solid sodium cyanide from 45,000 tpa up to 60,000 tpa. The proposal also includes connecting the two existing thermal combustion units to allow waste gas from either plant during down time to be directed through a combined header to the operational thermal combustion unit for effective... Read more...Last updated: April 24, 2024
The construction, operation and maintenance of a nominal 320 megawatt combined cycle base load power plant at Kwinana, as documented in schedule 1 of the ministerial statement. Read more...Last updated: March 7, 2024
The proposal is to expand CSBP's Kwinana Ammonium Nitrate Production Facility (ANPF) by incorporating additional components into the existing facility and re-engineering (debottlenecking) some existing components in order to increase ammonium nitrate production capacity from 520,000 tpa to 936,000 tpa. Read more...Last updated: February 15, 2024
Resource Group (WA) Pty Ltd proposes to construct a hard rock quarry at Lot 150 (792) Clydesdale Road, Grass valley. Holcim (Aust) Pty Ltd will be the eventual operators of the quarry. The proposal will extract, crush and screen approximately seventy thousand tonne (70,000tn) of hard rock per year with an approximate life of the quarry being 20-30 years. The proposal would require the clearing of 8.41 hectares (ha) of native vegetation and have a developmental envelope of 15.2 ha. Read more...