This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: October 5, 2005
CSBP Limited propose to remediate the former Cresco site in Bayswater. There is up to 280,000 m 3 of contaminated soil present on site. The contamination was caused by the disposal of pyritic wastes or cinders, lead chamber washings, sodium bisulphate, den-scrubber effluent, superphosphate and other building wastes during the site’s history. The cinders, sodium bisulphate and den-scrubber effluent were deposited in excavated pits while the other wastes were disposed of on a more random basis.... Read more...Last updated: November 25, 2004
Australian Gold Reagents Pty Ltd (AGR) proposes a review of its Ministerial conditions relating to the manufacture, storage and transport of sodium cyanide in order to clarify their intent, remove obsolete or confusing aspects, update standard conditions and consolidate the relevant conditions into one Statement. Read more...Last updated: July 22, 1999
Saracen Properties Pty Ltd propose to construct and operate a brick and tile manufacturing plant in Hazelmere, south of the Midland town center, approximately 16 km north-east of the Perth metropolitan area. Read more...Last updated: June 30, 1997
The proposal is to increase the production capacity of Tiwest's titanium dioxide plant at Kwinana. The proposal is to modify/expand the existing plant to allow an increase in production capacity from 80,000 tonne per annum (tpa) to 180,00 tpa of titanium dioxide pigment in three notional stages: Stage I: increase to 120,000 tpa, Stage 2: increase to 165,000 tpa and Stage 3: increase to nominally 180,000 tpa. The first and second stages of the expansion wilI require major modifications to... Read more...Last updated: May 19, 1997
The proposal is to to expand NufarmCoogee Pty Ltd's Chlor-alkali Plant at Kwinana to allow an increase in chlorine gas production to 42,000 tonnes per annum (tpa) through the installation of a new electrolysis processing circuit. Storage of chlorine held on site will rise from a nominal 50 tonnes to 150 tonnes. Read more...