This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: May 19, 2025
Talison Lithium Australia Pty Ltd (Talison) propose to expand the existing Greenbushes Lithium Mine that has been operating for over 30 years, to increase the production of spodumene ore and lithium mineral concentrate from the operation. This proposal is an expansion of the existing mining operation to incorporate: Construction of the S2 waste rock landform (WRL) as an expansion of the Floyds WRL. Construction and operation of the S8 WRL to the east of the existing proposal development... Read more...Last updated: January 20, 2025
Colchester Pty Ltd propose to construct a large format hardware and retail development at Lot 100 and 256 Clarke Road within the Station Road commercial precinct located 900 metres south of the Margaret River town site. The proposal includes buildings internal roads, hardstand areas and landscaping. The proposal site is 2.86 hectares (ha) and is bounded by existing commercial business to the north and south, the South Regional TAFE Margaret River Campus to the east and remnant vegetation within... Read more...Last updated: May 24, 2024
The proposal includes the expansion of a mineral sands mine including mine pits with dewatering to facilitate dry mining techniques. Existing processing facilities, services and support infrastructure will be utilised. Mine voids will be progressively backfilled with sand and clay tailings and rehabilitated to pre-disturbance landuse (i.e. pasture). Read more...Last updated: September 29, 2020
Meynell Pty Ltd intends to subdivide Lot 9002 Prowse Road, Capel to create 70 lots for residential development, associated access roads and a reserve for recreation and drainage. The proposal area is 15.5 hectares (ha) of which approximately 11.5 ha is proposed for development. Read more...Last updated: September 14, 2020
Change to condition 2-1 in order to extend the Time Limit for substantial commencement of the proposal. Read more...Last updated: February 3, 2020
Main Road WA proposes to construct and operate 5 km of duel carriageway around the City of Albany to allow heavy freight vehicles to bypass local traffic to access the Port of Albany. The proposal involves clearing of 11.6 ha of native vegetation and 8.6 ha of non-native vegetation within a 96 ha development envelope. Read more...Last updated: April 9, 2018
City of Busselton proposes to construct a new route into Busselton. The proposal involves the development of a new two-lane road and bridge linking Causeway Road to Cammilleri Street, including a new bridge over the Vasse river. Disturbance associated with the proposal would include construction on the banks of the Vasse River and removal of 0.56 hectares of native vegetation. Read more...Last updated: December 8, 2016
Cristal Australia Pty Ltd proposes the Wonnerup North Mineral Sands Project located approximately 10 kilometres east of Busselton, City of Busselton. The project would involve dry mining and processing of mineral sands ore from the Wonnerup North deposit at a rate of approximately 2.3 million tonnes (Mt) per annum over eight years. Read more...Last updated: February 25, 2013
Main Roads Western Australia proposes to construct the Bunbury Outer Ring Road Southern Section (South Western Highway to Bussell Highway) at Bunbury. The project will provide improved access from Bussell Highway in the south, to the Bunbury Port and developing industrial area to the east of Bunbury. Read more...