This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 25, 2024
FI Joint Venture Pty Ltd is proposing to construct and operate a magnetite iron ore project, with mining, processing and associated infrastructure. The proposed mine is located approximately 225 kilometres (km) east-northeast of Geraldton and 15 km northeast of Yalgoo within the Shire of Yalgoo. The proposal includes a magnetite slurry pipeline and a water pipeline to Geraldton Port and a gas supply pipeline from the Dampier to Bunbury Natural Gas Pipeline network. Mining of the magnetite will... Read more...Last updated: March 5, 2024
Technology Metals Australia are looking to develop the Gabanintha Vanadium Project. The Gabanintha Vanadium Project is located within WA’s Mid-West region, approximately 615 km north-east of Perth and 40 km south-east of Meekatharra, adjacent to the Meekatharra-Sandstone Road. The proposal includes development of multiple vanadium deposits (Far North, North, and Central) via open pit mining. Supporting infrastructure for the Project includes waste rock landforms (WRLs), mineralised waste... Read more...Last updated: October 16, 2023
Karara Mining Limited is seeking to revise its existing Karara Iron Ore Mine, located 320 km north-northeast of Perth in the Midwest Region of Western Australia. The revised proposal includes additional ground disturbance to support the revised Life of Mine strategy, including a revised development envelope, extension of the tailings storage facility and waste rock landform, incorporation of the areas previously approved under the Mungada Iron Ore Project (MIOP) (MS 806) and areas required for... Read more...Last updated: July 15, 2022
The proposal is for above and below water table mining and beneficiation of vanadium ore to produce an enriched vanadium-iron concentrate. The proposal is located 40 km south-southeast of Meekatharra and includes the development of open mine pits and associated infrastructure including but not limited to access roads, accommodation camp, a crushing, milling, flotation, and magnetic separation (beneficiation) plant, waste rock and tailings storage, and support infrastructure. Read more...Last updated: November 22, 2019
Changes to conditions 3-1 and 3-2 of Ministerial Statement 911 in order to extend the time limit of proposal implementation. Read more...Last updated: January 16, 2017
The proposal is to mine uranium ore from the Yeelirrie deposit, approximately 70 km south-west of Wiluna, and the construction of associated mine infrastructure, including ore processing facilities, water (includes borefield and corridors) abstraction and reinjection infrastructure, roads, accommodation, offices and workshops, stockpile and laydown areas and evaporation pond. Tailings would be discharged into the mine open pit. Read more...Last updated: January 9, 2017
Toro proposes to revise the Approved Project by developing Millipede and Lake Maitland uranium deposits and developing associated infrastructure. The Proposed Extension would result in the additional direct disturbance of approximately 1,582 hectares (ha) within an additional Development Envelope of approximately 3,891 ha. The Proposed Extension would include open mine pits at Millipede and Lake Maitland, in-pit tailings storage facility (TSF) at Millipede, accommodation village, workshop, run-... Read more...Last updated: November 17, 2016
The proposal is to construct and operate a uranium mine consisting of two deposits Centipede and Lake Way at mining tenements M53/224 and MLA53/1090, located approximately 30 kilometres south and 15 kilometres south-east of Wiluna. Read more...Last updated: February 26, 2015
The Minister for Environment has requested that the EPA inquire into and report on the matter of changing the implementation conditions relating to Ministerial Statement 905 in order to: extend the time limit on shipments of lead carbonate through Fremantle Port (condition 3A); and reduce the amount of the financial assurance required and allow the release and reinstatement of the financial assurance in the event operations are suspended (condition 18). Read more...Last updated: January 9, 2012
The proposal consists of a designated mining area containing two open pits, integrated waste and tailings landform, ore beneficiating plant and workshops, a combined gas pipeline spur and water pipe corridor, a services (possible water, gas, power transmission) corridor to Weld Range, the Byro Sub-basin Borefield and the Murchison Palaeochannel Borefield, a power station, airstrip, village and ancillaries. The Jack Hills Expansion Project is contiguous with the Stage 1 mine. Read more...Last updated: March 14, 2011
Oakajee Rail Development is a component of the larger Oakajee Port and Rail Development. The proposed heavy haulage railway and the associated facilities covered in this proposal include 570 kilometres (km) of railway and associated rail infrastructure extending in a north-easterly direction from the North West Coastal Highway (NWCH) approximately 1.5km south of Olsen Road at Oakajee, approximately 24km north of Geraldton, to the Jack Hills mining operations located approximately 500km to the... Read more...Last updated: March 14, 2011
The proposal is to construct and operate iron ore handling and storage facilities and ancillary infrastructure required to develop and operate a 45 million tonne per annum iron ore export facility at Oakajee, 24km north of Geraldton. Read more...