Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Infrastructure (5) Apply Infrastructure filter
  • Oil and gas (4) Apply Oil and gas filter
  • Industrial (2) Apply Industrial filter
  • Copper (1) Apply Copper filter
  • Gold (1) Apply Gold filter
  • Iron Ore (1) Apply Iron Ore filter

Filter by current status:

  • Ministerial Statement published (8) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (1) Apply Decision on whether to assess has been published filter

Filter by relevant environmental factors:

  • (-) Remove 37 filter 37
  • (-) Remove Marine Fauna filter Marine Fauna
  • Flora and Vegetation (7) Apply Flora and Vegetation filter
  • Social Surroundings (6) Apply Social Surroundings filter
  • Terrestrial Fauna (6) Apply Terrestrial Fauna filter
  • Benthic Communities and Habitats (5) Apply Benthic Communities and Habitats filter
  • Marine Environmental Quality (3) Apply Marine Environmental Quality filter
  • Hydrological Processes (2) Apply Hydrological Processes filter
  • Inland Waters Environmental Quality (2) Apply Inland Waters Environmental Quality filter
  • Landforms (2) Apply Landforms filter
  • Subterranean Fauna (2) Apply Subterranean Fauna filter
  • Terrestrial Environmental Quality (2) Apply Terrestrial Environmental Quality filter
  • 3144 (1) Apply 3144 filter
  • Coastal Processes (1) Apply Coastal Processes filter
  • Inland Waters (1) Apply Inland Waters filter

Filter by Proponent:

  • Chevron Australia Pty Ltd (2) Apply Chevron Australia Pty Ltd filter
  • API Management Pty Limited (1) Apply API Management Pty Limited filter
  • Australian Methanol Company Pty Ltd (1) Apply Australian Methanol Company Pty Ltd filter
  • BHP Billiton Iron Ore (1) Apply BHP Billiton Iron Ore filter
  • BHP Billiton Petroleum Pty Ltd (1) Apply BHP Billiton Petroleum Pty Ltd filter
  • Korean Steel Pty Ltd (1) Apply Korean Steel Pty Ltd filter
  • Rio Tinto Winu Pty Limited (1) Apply Rio Tinto Winu Pty Limited filter
  • Woodside Energy Ltd (1) Apply Woodside Energy Ltd filter

Filter by region:

  • (-) Remove Pilbara filter Pilbara

Filter by last updated:

  • 2024 (1) Apply 2024 filter
  • 2023 (1) Apply 2023 filter
  • 2015 (1) Apply 2015 filter
  • 2013 (1) Apply 2013 filter
  • 2012 (2) Apply 2012 filter
  • 2008 (1) Apply 2008 filter
  • 2002 (1) Apply 2002 filter
  • 2000 (1) Apply 2000 filter
  1. Home
  2. Proposal search
  3. Pilbara
  4. Marine Fauna
  5. 37

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Gorgon Gas Development Revised and Expanded Proposal: Barrow Island Nature Reserve

Last updated: November 25, 2024

The construction of facilities for the development of the Greater Gorgon Gas Fields on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on Barrow Island. Read more...

Winu Project

Last updated: December 22, 2023

Rio Tinto Winu Pty Limited (the Proponent) proposes to develop the Winu Project (the Proposal). The Proposal is a new copper-gold mine located approximately 300 km south of Broome and 320 km east of Port Hedland in the northern Pilbara region of Western Australia within both the Nyangumarta people’s and the Martu people’s Native Title Determination Areas. The Proposal conceptual footprint will require the clearing of up to 4,868 ha of native vegetation within a proposed 37,344 ha Development... Read more...

Gorgon Gas Development Fourth Train Expansion Proposal

Last updated: April 30, 2015

To expand the liquefied natural gas (LNG) production capacity of the existing proposal from 15 million tonnes per annum (Mtpa) to 20 Mtpa (nominal). Read more...

Anketell Point Port Development, Antonymyre, Shire of Roebourne

Last updated: January 30, 2013

The proposal is to construct and operate a multi-user deep-water port with iron ore stockpiling, transfer and ship loading facilities and ancillary infrastructure at Anketell Point. The proposal allows for facilities required by the Proponent and future third parties to be developed. Read more...

Port Hedland Outer Harbour Development

Last updated: February 28, 2012

The proposal is to construct and operate the Outer Harbour Development which includes landside and marine infrastructure for the handling and export of iron ore from BHPBIO’s operations. The Boodarie stockyard infrastructure will supply an overland conveyor to a transfer pad located to the west of the existing Finucane Island facilities. A piled jetty will transfer ore material to the ship loaders located at the piled wharf. Read more...

Macedon Gas Development

Last updated: January 17, 2012

The proposal is to construct a sub sea pipeline, onshore gas treatment and compression plant, and sales gas pipeline. The subsea pipeline from the Macedon Gas Field (100 kilometres west of Onslow) connects to the onshore gas treatment and compression plant at Ashburton North (15 kilometres southwest of Onslow). The sales gas pipeline connects the onshore facility to the Dampier to Bunbury Natural Gas (DBNG) Pipeline. Read more...

Materials Stockpiling and Handling Facilities, Cape Preston

Last updated: March 20, 2008

The proposal is to establish materials stockpiling and handling facilities with a capacity of approximately 4 million tonnes at Cape Preston, approximately 60km west-south-west of Dampier. Read more...

Methanol Plant and Product Export, Burrup Peninsula

Last updated: December 20, 2002

The proposal is for construction and operation of a methanol plant of 1.05 million tonnes per annum (Mt/a) nominal capacity, at Withnell East industrial area on the Burrup Peninsula The proposal includes the installation of a gas supply pipeline, product pipeline, seawater supply pipeline and wastewater discharge pipeline to be situated in infrastructure corridors for which the Department of Mineral and Petroleum Resources (MPR) will be proponent. The plant footprint will occupy approximately... Read more...

North West Shelf Gas Project Additional Liquefied Natural Gas LNG facilities

Last updated: February 11, 2000

Woodside Energy Limited proposes to construct and operate additional Liquefied Natural Gas (LNG) processing trains, the current proposal being for two trains with a total additional capacity of 8 Mtpa at its onshore gas plant on the Burrup. Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.