Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Iron Ore (18) Apply Iron Ore filter
  • Infrastructure (10) Apply Infrastructure filter
  • Oil and gas (2) Apply Oil and gas filter
  • Aquaculture (1) Apply Aquaculture filter
  • Copper (1) Apply Copper filter
  • Gold (1) Apply Gold filter
  • Industrial (1) Apply Industrial filter

Filter by current status:

  • Ministerial Statement published (22) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (3) Apply Decision on whether to assess has been published filter
  • Assessment has been terminated under s40A of the EP Act (1) Apply Assessment has been terminated under s40A of the EP Act filter

Filter by relevant environmental factors:

  • Flora and Vegetation (19) Apply Flora and Vegetation filter
  • Terrestrial Fauna (14) Apply Terrestrial Fauna filter
  • Hydrological Processes (8) Apply Hydrological Processes filter
  • Inland Waters Environmental Quality (8) Apply Inland Waters Environmental Quality filter
  • Subterranean Fauna (7) Apply Subterranean Fauna filter
  • Social Surroundings (6) Apply Social Surroundings filter
  • 37 (5) Apply 37 filter
  • Benthic Communities and Habitats (5) Apply Benthic Communities and Habitats filter
  • Inland Waters (5) Apply Inland Waters filter
  • Marine Environmental Quality (5) Apply Marine Environmental Quality filter
  • Marine Fauna (4) Apply Marine Fauna filter
  • Landforms (2) Apply Landforms filter
  • Terrestrial Environmental Quality (2) Apply Terrestrial Environmental Quality filter
  • Coastal Processes (1) Apply Coastal Processes filter

Filter by Proponent:

  • Forge Resources Swan Pty Ltd (3) Apply Forge Resources Swan Pty Ltd filter
  • Atlas Iron Pty. Ltd. (2) Apply Atlas Iron Pty. Ltd. filter
  • BHP Billiton Iron Ore Pty Ltd (2) Apply BHP Billiton Iron Ore Pty Ltd filter
  • Bungaroo South Pty Ltd (2) Apply Bungaroo South Pty Ltd filter
  • Hamersley Iron Pty Limited (2) Apply Hamersley Iron Pty Limited filter
  • Roy Hill Iron Ore Pty Ltd (2) Apply Roy Hill Iron Ore Pty Ltd filter
  • API Management Pty Limited (1) Apply API Management Pty Limited filter
  • Chevron Australia Pty Ltd (1) Apply Chevron Australia Pty Ltd filter
  • DBP Development group Nominees Pty Ltd (1) Apply DBP Development group Nominees Pty Ltd filter
  • Department of Transport (1) Apply Department of Transport filter
  • Fortescue Metals Group Limited (1) Apply Fortescue Metals Group Limited filter
  • Fortescue Metals Group Ltd (1) Apply Fortescue Metals Group Ltd filter
  • Greatland Pty Ltd (1) Apply Greatland Pty Ltd filter
  • Hamersley HMS Pty Ltd (1) Apply Hamersley HMS Pty Ltd filter
  • Leichhardt Industrials Pty Ltd (1) Apply Leichhardt Industrials Pty Ltd filter
  • NW Interconnected Power Pty Ltd (1) Apply NW Interconnected Power Pty Ltd filter
  • PIOP Mine Co NL (1) Apply PIOP Mine Co NL filter
  • Robe River Mining Co. Pty. Ltd (1) Apply Robe River Mining Co. Pty. Ltd filter
  • Venturex Resources Limited (1) Apply Venturex Resources Limited filter

Filter by region:

  • (-) Remove Pilbara filter Pilbara

Filter by last updated:

  • (-) Remove 2020 filter 2020
  1. Home
  2. Proposal search
  3. Pilbara
  4. 2020

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Miralga Creek DSO Project

Last updated: November 23, 2020

Atlas Iron Pty. Ltd (the proponent) propose to develop the Miralga Creek DSO Project (the proposal), an iron ore project located in the Pilbara region of Western Australia. The proposal includes the development of five open pits using conventional drill and blast, load and haul methods. 8 million tonnes of iron ore will be mined above the watertable over an approximate timeframe of four to five years. Associated infrastructure will include waste rock dumps. Existing borefield and accommodation... Read more...

Asian Renewable Energy Hub Revised Proposal

Last updated: November 9, 2020

NW Interconnected Power Pty Ltd (the Proponent) is seeking to revise its approved proposal to develop the Asian Renewable Energy Hub.  The proposal was previously referred under section 38 of the Environmental Protection Act 1986 (EP Act), assessed by the Environmental Protection Authority (EPA) at the level of Public Environmental Review (PER) (NW Interconnected Power 2019), and subsequently approved by the Western Australian Minister for Environment in October 2020.   This referral is for ... Read more...

Pilbara Iron Ore Project - revised proposal

Last updated: October 5, 2020

Flinders Mines Ltd proposes to revise the already approved Pilbara Iron Ore Project located approximately 70 kilometres north-west of Tom Price in the Hamersley sub-region. The revised proposal includes additional clearing up to 300 hectares (ha) to include the Paragon ore deposit and external infrastructure (including haul roads, airstrip and accommodation camp), as well as an increase in abstraction of groundwater of up to 2 Gigalitre per annum. Read more...

Hope Downs 4 Iron Ore Mine

Last updated: October 2, 2020

The proposal involves the development and operation of the Hope Downs 4 Iron Ore Mine (HD4), located in the Pilbara region in the shire of East Pilbara. It includes the development and operation of an above and below the water table greenfields iron ore mine and associated infrastructure. Ore from the HD4 proposal would be transported via a new railway to existing rail infrastructure near the existing Hope Downs 1 Iron Ore Mine then to port facilities on the coast. The mine would operate... Read more...

Roy Hill 1 Iron Ore Mining Project Stage 1

Last updated: September 30, 2020

The proposal is to mine iron ore from the Stage 1 project area on the southern slopes of the Chichester Range and develop associated mining infrastructure. Read more...

Roy Hill 1 Iron Ore Mining Stage 2

Last updated: September 30, 2020

Proposal to mine iron ore from the Stage 2 project area on the southern slopes of the Chichester Range and develop a remote borefield and pipeline by Roy Hill Iron Ore Pty Ltd (RHIO). Read more...

Telfer Project, Expansion of Telfer Gold Mine, Great Sandy Desert

Last updated: September 16, 2020

This proposal involves the recommencement and expansion of mining at the Telfer Gold Mine to include the mining and processing of 400 million tonnes of gold ore at a rate of up to 23 million tonnes per annum, and the transport of copper concentrate to Port Hedland by road. Key components of the expansion include: expansion of existing underground mining areas and deepening of the existing open pits; extensions to the existing southern waste rock dump and several other dumps; construction of a... Read more...

Port Facility Upgrade - Dredging and Wharf Construction - Third Berth Anderson Point Port Hedland

Last updated: August 12, 2020

The proposal is for dredging of not more than 3,500,000 cubic metres off Anderson Point, for a third ship berth; disposal of dredge spoil on preexisting and previously approved land at Anderson Point; and extension of the approved open-pile wharf. Read more...

Cape Preston East Iron Ore Export Facility (s46) [2183]

Last updated: August 6, 2020

Change to Extension of Timeframe for substantial commencement. Read more...

Gas Pipeline from Griffin Oilfield to Mainland Facility near Onslow (S46) [2221]

Last updated: July 23, 2020

Change to condition 1 commitment 39 of Ministerial Statement 308 in order to consider the change of distance to the nearest sensitive receptor. Read more...

Buckland Project (S46) [2243]

Last updated: July 23, 2020

Change to condition 3 to extend the authorised timeframe for substantial commencement of the proposal by five years, to 12 February 2024. Read more...

Turee Syncline Iron Ore Project (s46) [2173]

Last updated: July 9, 2020

Change to Condition 3. Extension to Time Limit for Proposal Implementation. Read more...

Mesa H Proposal (Revision to Mesa J Iron Ore Development)

Last updated: July 9, 2020

Robe River Mining Co. Pty Limited (the proponent) proposes to develop the Mesa H deposit to sustain its iron ore production operations within the Robe Valley, Pilbara. The proposal is located approximately 16 km south west of Pannawonica. The proposal would include a total disturbance of 2,200 hectares to develop above and below water table open cut iron ore pits and associated infrastructure, including water management infrastructure. The proposal is located adjacent to the existing Mesa J... Read more...

Pilbara Iron Ore and Infrastructure Project: Port and North - South Railway (Stage A) (s46) [2231]

Last updated: June 3, 2020

S46 change - Removal of Condition 17: Dust Management Read more...

Gorgon Gas Development Revised and Expanded Proposal (s. 46) [2161]

Last updated: May 29, 2020

Section 46 - request for a change to Environmental Conditions: Inquire into the commencement of Condition 26 (Reservoir Carbon Dioxide Injection System) of Ministerial Statement 800. Read more...

Balla Balla Magnetite Mining Project (S46) [2224]

Last updated: May 27, 2020

Changes to conditions 3-1 and 3-2, time limit of authorisation of Ministerial Statement 985 in order to extend the Time Limit of Authorisation. Read more...

Sulphur Springs Zinc-Copper Project

Last updated: May 20, 2020

Venturex Resources Limited propose to develop the Sulphur Springs Zinc-Copper Project located approximately 144 kilometres (km) south-east of Port Hedland and 57 km west of Marble Bar. The project includes an open pit mine to extract the upper portion of the orebody and an underground mine to extract the lower portion of the orebody. The project has a disturbance footprint of 313.6 hectares (ha) within an 889.2 ha development envelope and consists of the following physical and operational... Read more...

Balla Balla Infrastructure – Rail and Conveyor Project (S46) [2248]

Last updated: May 18, 2020

Change to condition 3 - Time limit for Proposal Implementation. Extension of time limit of 5 years to 15 June 2025, allowing time for project financing. Read more...

Buckland Project

Last updated: April 28, 2020

To develop and operate an iron ore mine, processing facilities and supporting infrastructure, 45 km south-south-east of Pannawonica in the Shire of Ashburton, and a 176 km haul road from the mine site to the customer delivery point near Cape Preston. Read more...

Port Hedland Spoilbank Marina

Last updated: April 20, 2020

The Department of Transport is proposing to construct and operate the Port Hedland Spoilbank Marina Proposal, including marine and land-based components within the Town of Port Hedland, Pilbara, WA. The Proposal includes: marina basin, mooring facilities (up to 80 pens), boat launching area, sand trap and entrance channel capital dredging works resulting in up to 900,000 cubic metres (m3) of dredge spoil and dredged to a maximum depth of -2m chart datum (-6m AHD). Dredge spoil will be used... Read more...

Pages

  • 1
  • 2
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.