Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Industrial (2) Apply Industrial filter
  • Infrastructure (2) Apply Infrastructure filter
  • Iron Ore (2) Apply Iron Ore filter
  • Oil and gas (1) Apply Oil and gas filter

Filter by current status:

  • Ministerial Statement published (5) Apply Ministerial Statement published filter
  • Awaiting Ministerial decision (1) Apply Awaiting Ministerial decision filter

Filter by relevant environmental factors:

  • Marine Environmental Quality (2) Apply Marine Environmental Quality filter
  • Social Surroundings (2) Apply Social Surroundings filter
  • 37 (1) Apply 37 filter
  • Flora and Vegetation (1) Apply Flora and Vegetation filter
  • Hydrological Processes (1) Apply Hydrological Processes filter
  • Terrestrial Environmental Quality (1) Apply Terrestrial Environmental Quality filter

Filter by Proponent:

  • Birla (Nifty) Pty Ltd (2) Apply Birla (Nifty) Pty Ltd filter
  • Hamersley Iron Pty Limited (2) Apply Hamersley Iron Pty Limited filter
  • Apache Northwest Pty Ltd (1) Apply Apache Northwest Pty Ltd filter
  • Dampier Ammonia Pty Ltd and Dampier Urea Pty Ltd (1) Apply Dampier Ammonia Pty Ltd and Dampier Urea Pty Ltd filter
  • Dampier Nitrogen Pty Ltd (1) Apply Dampier Nitrogen Pty Ltd filter

Filter by region:

  • (-) Remove Pilbara filter Pilbara

Filter by last updated:

  • (-) Remove 2005 filter 2005
  1. Home
  2. Proposal search
  3. Pilbara
  4. 2005

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Revised Proposal - Dampier Port Increase in Throughput to 120 Mtpa

Last updated: December 5, 2005

The proposal is to expand Hamersley Iron's iron ore operations at Dampier Port from 95 million tonnes per annum (Mtpa) to 120 Mtpa. The Hamersley Iron Dampier Port operations include rail and port facilities, rail maintenance workshops, a 120MW power station, laboratories and other service and administrative functions. The port operations are located at two terminals – Parker Point (PP) and East Intercourse Island (EII). The proposal is to increase the capacity of the Parker Point terminal... Read more...

Gas Pipeline to Nifty Copper Operations, Great Sandy Desert (s46)

Last updated: October 28, 2005

The construction of a gas pipeline to supply natural gas for on-site power generation at Nifty Copper Operations located in the eastern Pilbara region. The gas pipeline is a 46 kilometre spur line from the Port Hedland - Telfer Pipeline to Nifty Copper Operations. Inquiry under s46 to change implementation conditions of Ministerial Statement 676 . Read more...

Gas Pipeline to Nifty Copper Operations, Great Sandy Desert

Last updated: October 25, 2005

The proposal is for the construction of a gas pipeline to supply natural gas for on-site power generation at Nifty Copper Operations located in the eastern Pilbara region. The gas pipeline is a 46 kilometre spur line from the Port Hedland - Telfer Pipeline to Nifty Copper Operations. Read more...

Ammonia-Urea Plant, Burrup Peninsula

Last updated: October 12, 2005

The proposal is to construct an ammonia–urea plant on the Burrup Peninsula. The plant will have a production capacity of 2300 tonnes/day (t/d) of ammonia and 3500 t/d of urea. The plant and associated infrastructure will be composed of: a natural gas supply pipeline from the North West Shelf Liquefied Natural Gas (LNG) Plant (to be located in a multi-user service corridor); ammonia plant; urea plant; fluid bed granulation plant; seawater desalination, treatment and storage; internal power... Read more...

Ammonia and Urea Plants, Burrup Peninsula (s46) [1602]

Last updated: October 3, 2005

The proponent wishes to split the original proposal into two proposals, an ammonia plant and a urea plant. The approval to split the proposal was granted as a change to the proposal on 12 October 2005 under section 45C of the, Environmental Protection Act 1986, . The split of the proposal is based on commercial grounds and there are no changes to the capacities or other operational characteristics of the proposal as originally approved. The split of the proposal will result in each plant being... Read more...

Yandicoogina Junction Southeast Mine, Mining Lease 274SA

Last updated: September 5, 2005

Proposal by Hamersley Iron Pty Limited (Hamersley), the proponent, to mine a section of the Yandicoogina Channel Iron Deposit (CID). Read more...

Simpson Oil Field Development, offshore Abutilon Island, Lowendal Islands, North West Shelf

Last updated: August 25, 2005

The proposed Simpson Development proposal will make use of three existing wells and one that is the subject of a separate referral. The development will consist of: the Simpson Alpha offshore mini-platform located at the Tanami-4 and Tanami-5 wells surface location; the Simpson Bravo offshore mini-platform located at the Simpson-1 and Simpson-3H well locations; and a sub-sea pipeline bundle linking the two mini-platforms to each other and to existing facilities on Varanus Island. The pipeline... Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.