This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: March 12, 2020
Atlas Iron Pty. Ltd (the proponent) propose to develop the Corunna Downs Project (the proposal), an iron ore project located in the Pilbara region of Western Australia. The proposal includes the development of five open pits using conventional drill and blast, load and haul methods. 23.3 million tonnes of iron ore will be mined above the watertable over an approximate timeframe of 6 years. Associated infrastructure will include waste rock dumps, a mine operation centre, borefield and... Read more...Last updated: January 20, 2020
The Minister for Environment has requested that the Environmental Protection Authority (EPA) inquire into and report on the matter of changing the implementation conditions in Ministerial Statement 945 relating to Forge Resources Swan Pty Ltd’s Balla Balla Export Facilities proposal. Read more...Last updated: January 15, 2020
The proposal is to revise the Mining Area C operation (located approximately 90km WNW of Newman) to include a new satellite ore body which is located approximately 8 km to the south of the existing approved Mining Area C operations. The revised proposal would require the additional clearing of approximately 19,850 hectares of vegetation and mining below the water table. Read more...Last updated: November 26, 2019
The Proposal is located within the Pilbara Interim Biogeographic Regionalisation for Australia (IBRA) region and is located within the Fortescue and Hamersley IBRA subregions. The Approved Project (authorised by Ministerial Statement 933 , 1 February 2013) is an above the water table open cut mine and associated infrastructure, located on mining tenement M470/1439. This proposal is to mine below the water table. Read more...Last updated: July 8, 2019
The proposal is to revise the existing Pilbara Iron Ore and Infrastructure Project: East-West Railway and Mine Sites Stage B located approximately 70 to 100 km north of Newman in the Pilbara region of Western Australia. The proposal includes mines and associated infrastructure at Christmas Creek and Mindy Mindy, and an east-west railway to link the Stage A north-south railway (to Port Hedland) to the Christmas Creek Mine. The revision includes modification/expansion or development of additional... Read more...Last updated: November 12, 2018
The proposal is to develop and operate an iron ore mine approximately 50 km west-northwest of Paraburdoo, Western Australia, a 20 km long gas pipeline corridor, and a 150 km long rail transport corridor that would connect the proposed mine to the West Pilbara Iron Ore Project Stage 1 infrastructure. Read more...Last updated: November 12, 2018
The proposal is to construct and operate an iron ore export facility at Cape Preston East in the Pilbara region of WA. Read more...Last updated: June 22, 2017
Proposal by BHP Iron Ore Pty Ltd to develop 14 iron ore deposits at Mining Area C-Northern Flank, 100 km north west of Newman. Read more...Last updated: January 25, 2017
The Marillana Iron Ore Project is to construct and operate a 750 Million tonnes iron ore mine, processing facility and associated infrastructure approximately 100km north-west of Newman. The Minister for Environment has requested that the Environmental Protection Authority (EPA) inquire into and report on the matter of changing the implementation conditions relating to the Marillana Iron Ore Project, in order to extend the ‘Time Limit of Authorisation’ for substantial commencement. Read more...Last updated: January 25, 2017
The proposal involves the development and operation of a 750 Mt iron ore mine, processing facility and associated infrastructure within mining leases M47/1414 and M47/1419. The project area is located approximately 100km north west of Newman in the Fortescue valley. The project area is approximately 15km south of the Fortescue Marsh, a wetland of national significance, and is intersected by Weeli Wolli Creek, which is a major Pilbara drainage system that discharges to the Marsh. Read more...Last updated: December 20, 2016
Mineral Resources Limited (the proponent) proposes to construct and operate a Pilbara Bulk Ore Transportation System (BOTS), and associated infrastructure. The BOTS extends 330 kilometres from the Iron Valley mine site tenement boundary (M47/1439) to the Port Hedland Pilbara Port Authority boundary. Read more...Last updated: December 5, 2016
The proposal is for a change to BHP Billiton's approved iron ore proposals in the Eastern Ridge area, located approximately three kilometres north-east of Newman. The proponent’s approved iron ore proposals for the Eastern Ridge area are: Orebody 25 Extension Project ( Ministerial Statement 712 , 28 October 2009) for an open cut above and below the water table mine for Pits 1 and 3; Orebody 24/25 Upgrade Project ( Ministerial Statement 834 , 8 July 2010) for an open cut mine above the... Read more...Last updated: November 8, 2016
The proposal is an expansion of an existing approved proposal: Yandicoogina Iron Ore Project ( Ministerial Statement 914 ) to develop iron ore deposits at Junction Central, Junction South East, Junction South West and Oxbow, located in the central Pilbara region of Western Australia, on mining lease 274SA. The proposal is located within the Pilbara Interim Biogeographic Regionalisation for Australia (IBRA) region and is located within the Fortescue and Hamersley IBRA subregions. Read more...Last updated: October 4, 2016
Life-of-mine proposal to mine iron ore within Mining Leases 270SA and 47/292 at a rate of approximately 45 million tonnes per annum, and subsequent rehabilitation and decommissioning of the site. Inquiry under s46 to amend Ministerial Statement 679, the subject of EPA Report 1166 . Read more...Last updated: August 31, 2016
Austeel Pty Ltd proposes to mine iron ore from the George Palmer Orebody on a pastoral lease about 25km south of Cape Preston. Ore will be fed to a purpose-built process plant to produce up to 13.8 million tonnes per annum of pellet iron and 4.7 million tonnes per annum of direct reduced iron (DRI) and/or hot briquetted iron (HBI). The products will be exported via a new port to be built at Cape Preston and Preston Island. Associated components comprise waste dumps, tailings storage facility,... Read more...Last updated: June 1, 2016
The proposal involves an extension to the Wheelarra Hill open pits and overburden storage areas, and the mining of the South Jimblebar and Hashimoto deposits, with disposal of overburden into adjacent Overburden Storage Areas (OSAs) and in-pit disposal. Inquiry under s46 related to Ministerial Statement 857, the subject of EPA Report 1371. Read more...Last updated: May 4, 2016
Life-of-mine proposal to mine iron ore within Mining Leases 270SA and 47/292 at a rate of approximately 45 million tonnes per annum, and subsequent rehabilitation and decommissioning of the site. Read more...Last updated: May 2, 2016
The proposal is to develop an iron ore mine on the Iron Valley tenement located in the Shire of East Pilbara approximately 90 kilometres north-west of Newman. The project would include an above watertable blast and hydraulic shovel open pit mine and supporting infrastructure including dry crushing and screening plant, run of mine pad, waste rock landform, internal roads, power production, hazardous materials storage, waste management facilities, office buildings and an accommodation camp. Read more...Last updated: March 3, 2016
The proposal includes the existing Hamersley Yandicoogina iron ore project and proposed expansion. The existing project includes open pit mining at the Junction Central and Junction South East operations and associated infrastructure, dewatering activities, closure and rehabilitation. The expansion includes the development of new pits at Junction South West and Oxbow, temporary waste landforms, the development of new infrastructure, additional dewatering and water disposal activities. The... Read more...